Sewerage All 4th Stage (Q60301)

From EU Knowledge Graph
Revision as of 21:35, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q60301 in Czech Republic
Language Label Description Also known as
English
Sewerage All 4th Stage
Project Q60301 in Czech Republic

    Statements

    0 references
    4,204,933.51 Czech koruna
    0 references
    168,197.34 Euro
    10 January 2020
    0 references
    6,595,974.14 Czech koruna
    0 references
    263,838.97 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    28 February 2019
    0 references
    Obec Všenory
    0 references
    0 references
    0 references

    49°55'49.76"N, 14°18'41.65"E
    0 references
    25231
    0 references
    Předmětem tohoto projektu je vybudování kanalizace v části obce Všenory. V minulosti obec realizovala první tři etapy zasíťování obce kanalizačním systémem ze svého rozpočtu i OPŽP. Vzhledem k velkým finančním nákladů nebyla realizace doposud dokončena. Předmětem žádosti je realizace posledního úseku o celkové délce 814 m. Na nový kanalizační řad bude celkem připojeno 78 EO. Realizací projektu přispějeme ke zlepšení systému s nakládáním odpadních vod, kdy budou obyvatelé připojeni na ČOV. (Czech)
    0 references
    The purpose of this project is to build a sewerage in the part of the village of Všenory. In the past, the municipality implemented the first three stages of networking the municipality through the sewer system from its budget and the OPE. Due to the large financial costs, implementation has not yet been completed. The subject of the application is the implementation of the last section with an overall length of 814 m. The new sewer lines will be connected to a total of 78 EOs. By implementing the project, we will contribute to the improvement of the waste water management system, when the inhabitants will be connected to the wastewater treatment plant. (English)
    23 October 2020
    0 references
    L’objet de ce projet est la construction d’un réseau d’assainissement dans la partie du village de Všenory. Dans le passé, la municipalité a effectué les trois premières étapes de la mise en réseau de la municipalité à travers le réseau d’assainissement à partir de son budget et de l’OPŽP. En raison des coûts financiers élevés, la mise en œuvre n’est pas encore achevée. L’objet de la demande est la mise en œuvre du dernier tronçon d’une longueur totale de 814 m. Un total de 78 EO sera raccordé aux nouvelles canalisations d’égout. En mettant en œuvre le projet, nous contribuerons à l’amélioration du système de gestion des eaux usées, lorsque les résidents seront connectés à la station d’épuration des eaux usées. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004701
    0 references