Thermal modernisation of the existing primary school building in Sowa (Q137639)
Jump to navigation
Jump to search
Project Q137639 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the existing primary school building in Sowa |
Project Q137639 in Poland |
Statements
1,090,552.18 zloty
0 references
1,283,002.58 zloty
0 references
85.0 percent
0 references
28 April 2016
0 references
30 September 2020
0 references
GMINA STARGARD
0 references
Przedmiotem opracowania jest dokonanie prac termomodernizacyjnych przy budynku Publicznej SP w Sownie przy ul.Szkolnej 4,G.Stargard, a mianowicie:1)podłoga na gruncie dobudówka–docieplenie styropianem grubości 0,2m.Pow.docieplenia-510m2.2)podłoga na gruncie w piwnicy–docieplenie styropianem grubości 0,15 m.Pow.docieplenia-180m2.3)stropodach nad segmentem głównym-docieplenie styropianem grubości 0,2m.Pow.docieplenia 197m2.4) stropodach nad segmentem dobudówki-docieplenie Styro porem grubości 0,2m.Pow.docieplenia 335,00 m2.5)ściana w gruncie,cokołowa i fundamentowa–docieplenie styroporem grubości 0,14 m.Pow.docieplenia 200,00 m2.6)ściana zewnętrzna-docieplenie styropianem grafitowym grubości 0,14 m.Pow.docieplenia 583,83 m2.7)wymiana stolarki okiennej U=0,9.Pow.:102,83m2.8)wymiana drzwi na nowe U=1,3.Pow.:4,80m2.9)stolarka okienna dachowa-zamurowanie-zamurowanie świetlików dachowych.Powierzchnia 9,97 m2.10) stolarka okienna-zamurowanie-zamurowanie stolarki okiennej. Powierzchnia 5,04 m2.11)stolarka drzwiowa-zamurowanie-zamurowanie stolarki drzwiowej.Powierzchnia 9,24 m2.12)Ulepszenie c.w.u-usprawnienie instalacji c.w.u.(montaż pompy ciepła).Usprawnienie instalacji c.w.u.polega na demontażu starej instalacji c.w.u. i montażu nowej,zaizolowanej instalacji c.w.u.wraz z armaturą wodooszczędną z perlatorami.Podgrzewanie c.w.u.w podgrzewaczu pojemnościowym zasilanym czynnikiem grzewczym przez pompę ciepła umiejscowioną w kotłowni.13)Ulepszenie systemu grzewczego-usprawnienie instalacji c.o.(montaż pompa ciepła z gruntowym wymiennikiem ciepła).Dzięki przeprowadzonym pracom modernizacyjnym oszczędność zapotrzebowania ciepłą wyniesie powyżej 25%.Inwestycja jest etapem szerszego proj.związanego z rozbudową SP w Sownie.Efektem realizacji będzie bowiem wdrożenie działań związanych z głęboką,kompleksową modernizacją energ.obiektu kul-oświatowego,który służy dzisiaj zarówno dzieciom i nauczycielom pracującym w obiekcie.Szczegóły prac opisano w SW 2.1.1.1 oraz 3.1.3.1 (Polish)
0 references
The floor of the roof-intra-warming, the thickness of 0.2 m.Pow. to warming up-510 m².2) floor in the basement-warming, thickness of 0,15 m.Pow. dot.180 m²) floor on the ground in the basement-warming of the St. The rest of the volume of the work of the interior of the system is the improvement of the installation of the hot water pump.(installation of the heat pump).Improvement of the installation of the hot water system is necessary for the disassembly of the old heating system and the installation of a new, insulated installation of an arm. (English)
21 October 2020
0 references
L’objet de l’étude est d’effectuer des travaux de thermomodernisation dans le bâtiment public SP dans le marais à ul.Szkolna 4,G.Stargard, à savoir: 1)Le plancher au sol de l’addition-isolation avec une épaisseur de polystyrène 0,2 m.Pow.Lors du réchauffement jusqu’à 510 m².2)le plancher au sol dans le sous-sol de l’épaisseur de polystyrène 0,15 m.Pow.Lors du réchauffement jusqu’à 180 m².3) les tropodes sur le segment principal-isolation de épaisseur de polystyrène 0,2 m.A. Réchauffement de 197 m².4) au-dessus du segment de l’addition — isolation du styroscope d’une épaisseur de 0,2 m.Chauffage d’ac. de 335,00 m².5) mural dans le sol, rond et l’isolation de fondation avec une épaisseur de mousse de styrophène de 0,14 m.Ac. réchauffement 200,00 m².6) l’isolation murale externe avec l’épaisseur de polystyrène graphite 0,14 m.Lors du réchauffement de 583,83 m².7)Remplacement de menuiserie de fenêtre U=0, 9.Ap.:102,83 m².8)Remplacement des portes par un nouveau U=1,3.Ag.:4,80 m².9) toit fenêtre-moulage-moulage de puits de toiture.La surface de 9,97 m².10) menuiserie-moulage-moulage de fenêtres de menuiserie de fenêtre. Surface 9,24 m².12) Amélioration de l’installation d’eau chaude (installation de pompes à chaleur).Amélioration de l’installation d’eau chaude et installation du nouveau système de chauffage central isolé ainsi que des raccords d’économie d’eau avec des perlators.Chauffage de l’eau chaude dans un dispositif de chauffage alimenté par une pompe à chaleur par une pompe à chaleur située dans la chaudière.13)Amélioration du système de chauffage-amélioration du système de chauffage décrit (installation d’une pompe à chaleur avec un échangeur de chaleur au sol). Grâce aux travaux de modernisation, l’économie de chaleur sera supérieure à 25 %. (French)
2 December 2021
0 references
Identifiers
RPZP.02.06.00-32-B001/18
0 references