Energy modernisation of the Municipal Office building in Police (Q137633)
Jump to navigation
Jump to search
Project Q137633 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the Municipal Office building in Police |
Project Q137633 in Poland |
Statements
399,299.66 zloty
0 references
469,764.37 zloty
0 references
85.0 percent
0 references
7 July 2016
0 references
29 May 2018
0 references
GMINA POLICE
0 references
Przedmiotem projektu jest głęboka modernizację energetyczna budynku Urzędu Miejskiego w Policach, zlokalizowanego przy ulicy St. Batorego 3. Projekt ma charakter stacjonarny. Budynek o powierzchni 1984,27 m2 jest dwupiętrowy, zaprojektowany w technologii tradycyjnej murowanej ze stropami gestożebrowymi typu DZ-4. Drugie piętro przykryte jest dachem płaskim żelbetowym, wykonane z płyt dachowych panwiowych. Zakres inwestycji obejmuje: wymianę stolarki okiennej w piwnicy, wymianę stolarki drzwiowej zewnętrznej, docieplenie ścian zewnętrznych, docieplenie ściany na gruncie, docieplenie stropodachu, rozbudowę budynku o moduł, na który składają się winda zewnętrzna samonośna i podesty wejściowe na każdą kondygnację budynku, budowa pochylni dla osób niepełnosprawnych, wykonanie izolacji przeciwwilgociowej ścian fundamentowych, rozbudowa wewnętrznej instalacji elektrycznej w celu zasilenia projektowanych pomieszczeń i windy. Inwestycja zlokalizowana jest na terenie objętym ochroną konserwatorską. Gł. celem inwestycji jest zapewnienie wymaganej izolacyjności cieplnej, a tym samym zmniejszenie zapotrzebowania na nieodnawialną energię pierwotną o 29 %. Wprowadzone rozwiązania techniczne mają na celu zmniejszenie strat ciepła przez przenikanie przez przegrody zewnętrzne oraz zmniejszenie zapotrzebowania na ciepło dogrzewania powietrza wentylacyjnego. Dzięki temu znacznie zwiększy się efektywność energetyczna budynków oraz nastąpi redukcja CO2 o 64%. Celem ogólnym projektu jest zwiększenie efektywności energetycznej obiektu. Cel zostanie zrealizowany poprzez realizację celów bezpośrednich jakie wynikły z analizy problemów i potrzeb. Zostały one określone następująco: 1. Efektywne wykorzystanie energii cieplnej; 2. Obniżenie kosztów ogrzewania obiektów. W wyniku realizacji projektu zostanie zmodernizowany budynek o łącznej powierzchni zabudowy - 1984,27 m2. (Polish)
0 references
The subject of the project is a deep energy modernisation of the building of the Municipal Office in Police, located at 3 St. Batorego Street. The project is stationary. The 1984.27 m² building is two-storey, designed in traditional masonry technology with dense ribbed ceilings type DZ-4. The second floor is covered with a flat reinforced concrete roof, made of roof panels. The scope of the investment includes: replacement of the window joinery in the basement, replacement of the door carpentry, insulation of external walls, warming of the wall on the ground, warming of the ceiling, extension of the building by a module consisting of a self-supporting external elevator and entrance platforms for each floor of the building, construction of ramps for disabled people, construction of damp insulation of foundation walls, extension of internal electrical installation to power the designed elevators and rooms. The investment is located in the area covered by conservation protection. The aim of the investment is to ensure the required thermal insulation, thus reducing the demand for non-renewable primary energy by 29 %. The technical solutions introduced are designed to reduce heat loss through external partitions and reduce the demand for heat heating of ventilation air. This will significantly increase the energy efficiency of buildings and reduce CO2 by 64 %. The overall objective of the project is to increase the energy efficiency of the facility. The objective will be achieved through the achievement of the direct objectives resulting from the analysis of problems and needs. They are defined as follows: 1. Efficient use of thermal energy; 2. Reduction of heating costs of buildings. As a result of the project, the building with a total area of 1984.27 m² will be modernised. (English)
21 October 2020
0 references
L’objet du projet est une modernisation en profondeur de l’énergie du bâtiment du bureau municipal de police, situé à St. Batorego Street 3. Le projet est stationnaire. Le bâtiment d’une superficie de 1 984,27 m² est un bâtiment de deux étages conçu en maçonnerie traditionnelle avec des plafonds gestocostaux de type DZ-4. Le deuxième étage est recouvert d’un toit plat en béton armé, fait de panneaux de toit pan-pan. La portée de l’investissement comprend: remplacement de la menuiserie de fenêtres dans le sous-sol, remplacement de la menuiserie de porte extérieure, réchauffement des murs extérieurs, réchauffement du mur au sol, réchauffement du toit, extension du bâtiment avec un module composé d’un ascenseur extérieur autoportant et plates-formes d’entrée pour chaque étage du bâtiment, construction d’une rampe pour les personnes handicapées, mise en œuvre d’une isolation anti-humidité des murs de fondation, extension de l’installation électrique interne pour alimenter les pièces et ascenseurs conçus. L’investissement est situé dans la zone couverte par la protection de la conservation. L’objectif principal de l’investissement est d’assurer l’isolation thermique requise et donc de réduire de 29 % la demande d’énergie primaire non renouvelable. Les solutions techniques introduites visent à réduire les pertes de chaleur en pénétrant les cloisons extérieures et en réduisant la demande de chaleur pour le chauffage de l’air de ventilation. Cela augmentera considérablement l’efficacité énergétique des bâtiments et réduira les émissions de CO2 de 64 %. L’objectif général du projet est d’accroître l’efficacité énergétique de l’installation. L’objectif sera atteint par la réalisation des objectifs directs résultant de l’analyse des problèmes et des besoins. Ils sont définis comme suit: 1. Utilisation efficace de l’énergie thermique; 2. Abaisser le coût du chauffage des objets. Grâce au projet, le bâtiment sera modernisé d’une superficie totale de 1 984,27 m². (French)
2 December 2021
0 references
Identifiers
RPZP.02.06.00-32-A005/16
0 references