“Energy modernisation of multi-family buildings at 16 Pocztowa Street in Szczecin” (Q137667)

From EU Knowledge Graph
Revision as of 21:28, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet de nature stationnaire concerne la thermomodernisation de deux bâtiments situés à l’ul. Poste 16 à Szczecin et changements du système de chauffage et d’eau chaude domestique et remplacement de l’éclairage par l’efficacité énergétique dans les espaces communs. Sa mise en œuvre est divisée en quatre tâches: Activité 1 Travaux préparatoires liés à la mise en œuvre du projet — cette phase a déjà commencé, y compris la préparation d’audits...)
Jump to navigation Jump to search
Project Q137667 in Poland
Language Label Description Also known as
English
“Energy modernisation of multi-family buildings at 16 Pocztowa Street in Szczecin”
Project Q137667 in Poland

    Statements

    0 references
    771,067.27 zloty
    0 references
    185,056.14 Euro
    13 January 2020
    0 references
    1,238,802.09 zloty
    0 references
    297,312.5 Euro
    13 January 2020
    0 references
    62.24 percent
    0 references
    12 May 2017
    0 references
    31 August 2019
    0 references
    WSPÓLNOTA MIESZKANIOWA PRZY ULICY POCZTOWEJ 16 W SZCZECINIE
    0 references
    0 references
    Projekt o charakterze stacjonarnym dotyczy termomodernizacji dwóch budynków zlokalizowanych przy ul. Pocztowej 16 w Szczecinie oraz zmiany systemu ogrzewania i ciepłej wody użytkowej oraz wymiany oświetlenia na energooszczędne w częściach wspólnych. Jego realizacja podzielona została na cztery zadania: Zadanie nr 1 Prace przygotowawcze związane z realizacja projektu - ten etap już się rozpoczął i obejmował m. in. sporządzenie audytów energetycznych, przygotowanie studiów wykonalności. W kolejnym etapie w ramach tego zadania przygotowana zostanie dokumentacja budowlano-wykonawcza. Zadanie 2 obejmuje prace budowlane, przewidziane w audycie energetycznym i zgodne z projektem budowlanym. W pierwszej kolejności, zgodnie z Zasada konkurencyjności zostanie wybrany wykonawca, z którym podpisana zostanie umowa na realizację prac budowlanych Zadanie 3 związane jest wydatkami na nadzór nad realizacją prac budowlanych. W ramach tego zadania pokryte zostaną koszty nadzoru inwestorskiego nad wykonywanymi instalacjami oraz nadzór autorski. Zadanie 4 - w ramach tego zadania pokryte zostaną koszty związane z promocją projektu. Inwestycja zostanie oznaczona specjalnym plakatem informującym o projekcie (zgodnie z wytycznymi w zakresie promocji). Z uwagi na fakt, że projekt nie podlega przepisom o pomocy publicznej ani pomocy de minimis, rozpoczęcie projektu nastąpiło przed dniem złożenia wniosku a jego zakończenie zaplanowano na 31.12.2018 roku. Wszystkie wydatki są niezbędne do osiągnięcia założonych celów a zadania zostały pogrupowane w sposób logiczny i przejrzysty. Budynki objęte inwestycją nie są wpisane do rejestru zabytków. W ramach inwestycji wyłączono jako koszty niekwalifikowalne, koszty przypadające na lokale usługowe o łącznej powierzchni 107,30 m2 (96m2 - lokal użytkowy Gminy Szczecin, 11,30m2 - lokal użytkowy Wspólnoty mieszkaniowej). Infrastruktura będąca wynikiem projektu będzie wykorzystywana prawie wyłącznie na potrzeby działalności niegospodarczej. (Polish)
    0 references
    The project of a stationary character concerns the thermomodernisation of two buildings located at the street. Postal 16 in Szczecin and changes of heating and hot water system and replacement of lighting for energy efficient in common parts. Its implementation has been divided into four tasks: Task 1 Preparatory work related to the implementation of the project – this stage has already begun and included, among others, the preparation of energy audits, the preparation of feasibility studies. In the next stage, construction and execution documentation will be prepared as part of this task. Task 2 shall cover the construction work provided for in the energy audit and in accordance with the construction project. In the first place, according to the Competitiveness Principle, the contractor will be selected, with whom a contract for the execution of construction works will be signed. As part of this task, the costs of investor supervision over the installations and copyright supervision will be covered. Task 4 – As part of this task, the costs related to the promotion of the project will be covered. The investment will be marked with a special poster informing about the project (according to the promotion guidelines). Since the project is not subject to state aid or de minimis aid rules, the project was launched before the date on which the application was submitted and its completion was scheduled for 31.12.2018. All expenditure is necessary to achieve the objectives pursued and the tasks have been grouped logically and transparently. The buildings covered by the investment are not included in the register of monuments. The investment excluded as ineligible costs, costs per service premises with a total area of 107.30 m² (96 m² – utility premises of the Municipality of Szczecin, 11.30 m² – Community utility unit). The infrastructure resulting from the project will be used almost exclusively for non-economic activities. (English)
    21 October 2020
    0 references
    Le projet de nature stationnaire concerne la thermomodernisation de deux bâtiments situés à l’ul. Poste 16 à Szczecin et changements du système de chauffage et d’eau chaude domestique et remplacement de l’éclairage par l’efficacité énergétique dans les espaces communs. Sa mise en œuvre est divisée en quatre tâches: Activité 1 Travaux préparatoires liés à la mise en œuvre du projet — cette phase a déjà commencé, y compris la préparation d’audits énergétiques et la préparation d’études de faisabilité. Dans la phase suivante, des documents de construction et de construction seront préparés dans le cadre de cette tâche. L’activité 2 couvre les travaux de construction prévus dans l’audit énergétique et conformément au projet de construction. En premier lieu, conformément au principe de compétitivité, le contractant sera sélectionné, avec lequel le contrat d’exécution des travaux de construction sera signé. La tâche 3 est liée aux dépenses de supervision de l’exécution des travaux de construction. Dans le cadre de cette tâche, les coûts liés à la surveillance par les investisseurs des installations réalisées et à la supervision de l’auteur seront couverts. Activité 4 — Cette tâche couvrira les coûts liés à la promotion du projet. L’investissement sera marqué d’une affiche spéciale informant sur le projet (conformément aux lignes directrices pour la promotion). Étant donné que le projet ne fait pas l’objet d’une aide d’État ou d’une aide de minimis, le projet a débuté avant la date de dépôt de la demande et son achèvement est prévu pour le 31.12.2018. Toutes les dépenses sont nécessaires pour atteindre ses objectifs et les tâches sont regroupées de manière logique et transparente. Les bâtiments faisant l’objet de l’investissement ne sont pas inscrits au registre des monuments. L’investissement exclu en tant que coûts inéligibles, coûts imputables aux locaux de service d’une superficie totale de 107,30 m² (96 m² — locaux commerciaux de la municipalité de Szczecin, 11,30 m² — espace commercial de la communauté du logement). L’infrastructure résultant du projet sera utilisée presque exclusivement pour des activités non économiques. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.08.00-32-B008/17
    0 references