Solar power plant (photovoltaic) Broczyno (Q137706)

From EU Knowledge Graph
Revision as of 21:28, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la construction d’une exploitation photovoltaïque d’une capacité totale allant jusqu’à 1 MW, ainsi que des infrastructures d’accompagnement, comprenant: modules photovoltaïques, câblage à courant fixe et à courant variable, boîtes de jonction, conteneur de poste de transformateur, conteneur technique (entrepôt), route terrestre intérieure et carré de sol dans la zone de la parcelle no 185/1 dans le village de Broczyno, Czap...)
Jump to navigation Jump to search
Project Q137706 in Poland
Language Label Description Also known as
English
Solar power plant (photovoltaic) Broczyno
Project Q137706 in Poland

    Statements

    0 references
    1,752,862.93 zloty
    0 references
    420,687.10 Euro
    13 January 2020
    0 references
    2,191,078.69 zloty
    0 references
    525,858.89 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    30 November 2015
    0 references
    31 August 2018
    0 references
    SOLARSTAR SP. Z O. O.
    0 references
    0 references
    Przedmiotem projektu jest budowa farmy fotowoltaicznej o łącznej mocy do 1 MW wraz z infrastrukturą towarzyszącą, w skład której wchodzą: moduły fotowoltaiczne, okablowanie stało i zmienno-prądowe, skrzynki przyłączeniowe, kontener stacji transformatorowej, kontener techniczny (magazynowy), wewnętrzna droga gruntowa i plac gruntowy na terenie części działki o nr ew. 185/1 w miejscowości Broczyno, gm. Czaplinek. Projekt ma charakter stacjonarny. Wyprodukowana w niej energia elektryczna będzie dostarczana do sieci elektroenergetycznej Energa Oddział w Kaliszu. Do najważniejszych etapów realizacji przedsięwzięcia należą prace przygotowawcze polegające na uzyskaniu warunków przyłączenia do sieci elektroenergetycznej oraz uzyskanie pozwolenia na budowę. Kolejnym etapem jest etap prac budowlanych, który obejmuje posadowienie szkieletu elektrowni i montaż paneli fotowoltaicznych. W tym etapie przeprowadzone zostaną także prace polegające na przygotowaniu przyłączenia elektrowni do sieci OSD, budowie przyłącza energetycznego, budowie ogrodzenia, wykonaniu dojazdu, instalacji systemu monitoringu. Nad całością prac budowlanych będzie czuwał wyłoniony w drodze postępowania konkurencyjnego, inspektor nadzoru. Ze względu na konieczność przeprowadzenia postępowań administracyjnych związanych z uzyskaniem wymaganych decyzji i pozwoleń oraz niezbędnych procedur przetargowych proces budowy rozpocznie się i zakończy w 2017r. Elektrownia rozpocznie wytwarzanie energii elektrycznej na przełomie 2017 i 2018 roku, i w 2018 roku osiągnie pełną zaplanowaną zdolność produkcyjną 1037 MWh.Techniczną realizacja projektu gwarantują uzyskane warunki przyłączenia do sieci. Oznacza to, iż bezpośrednio po zakończeniu realizacji projektu jest możliwe wykorzystanie pełnej funkcjonalności infrastruktury, zaś projekt nie wymaga dodatkowych działań w celu jego pełnego wykorzystania. Podmiotem wdrażającym projekt będzie Wnioskodawca - SolarStar Sp. z o.o. z siedzibą w Warszawie. (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity produced in it will be delivered to the power grid Energa Branch in Kalisz. The most important stages of the project’s implementation include preparatory work consisting of obtaining the conditions of connection to the electricity grid and obtaining a construction permit. The next stage is the construction phase, which includes planting the plant’s skeleton and assembly of photovoltaic panels. At this stage, work will also be carried out on preparing the connection of the power plant to the OSD network, construction of the power connection, construction of a fence, execution of access, installation of the monitoring system. All construction works will be supervised by a supervisory inspector, selected by a competitive procedure. Due to the need to conduct administrative procedures related to obtaining the required decisions and permits and the necessary tendering procedures, the construction process will start and end in 2017. The power plant will start generating electricity at the turn of 2017 and 2018, and in 2018 it will reach the full planned production capacity of 1037 MWh.The technical implementation of the project is guaranteed by the achieved conditions for connection to the grid. This means that it is possible to use the full functionality of the infrastructure immediately after the completion of the project, and that the project does not require additional actions to fully exploit it. The entity implementing the project will be the Applicant – SolarStar Sp. z o.o. with its registered office in Warsaw. (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’une exploitation photovoltaïque d’une capacité totale allant jusqu’à 1 MW, ainsi que des infrastructures d’accompagnement, comprenant: modules photovoltaïques, câblage à courant fixe et à courant variable, boîtes de jonction, conteneur de poste de transformateur, conteneur technique (entrepôt), route terrestre intérieure et carré de sol dans la zone de la parcelle no 185/1 dans le village de Broczyno, Czaplinek. Le projet est stationnaire. L’électricité qui y est produite sera fournie au réseau électrique Energa Branch à Kalisz. Les étapes les plus importantes du projet sont les travaux préparatoires consistant à obtenir les conditions de raccordement au réseau électrique et l’obtention d’un permis de construire. L’étape suivante est la phase de construction, qui comprend la fondation de l’épine dorsale de la centrale et l’installation de panneaux photovoltaïques. Des travaux seront également réalisés à ce stade, notamment la préparation de la connexion de la centrale au réseau OSD, la construction d’une connexion énergétique, la construction de la clôture, l’achèvement de l’accès, l’installation du système de surveillance. L’ensemble des travaux de construction sera supervisé par l’inspecteur de surveillance, sélectionné dans le cadre d’une procédure de mise en concurrence. En raison de la nécessité de mener à bien les procédures administratives liées à l’obtention des décisions et des permis requis et des procédures d’appel d’offres nécessaires, le processus de construction débutera et s’achèvera en 2017. La centrale commencera à produire de l’électricité au tournant de 2017 et 2018, et en 2018, elle atteindra la pleine capacité de production prévue de 1 037 MWh. La mise en œuvre technique du projet est garantie par les conditions de raccordement au réseau. Cela signifie que, immédiatement après l’achèvement du projet, il est possible d’utiliser toute la fonctionnalité de l’infrastructure et que le projet ne nécessite pas d’actions supplémentaires pour en faire pleinement usage. L’entité chargée de la mise en œuvre du projet sera la requérante — SolarStar Sp. z o.o., dont le siège social est situé à Varsovie. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.10.00-32-A090/16
    0 references