Combination of cycle routes in the centre of Mielna (Q137581)

From EU Knowledge Graph
Revision as of 21:12, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la construction d’une route cyclable d’une longueur d’env. 140 mètres, qui combineront d’autres pistes cyclables conçues et mises en œuvre dans le cadre d’autres projets et en même temps le centre-ville et le centre de liaison prévu. Le projet marquera également la partie construite de la route cyclable et une partie de la rue. Nord de la route cyclable, qui fait l’objet de ce projet, à la connexion à la route cyclable prév...)
Jump to navigation Jump to search
Project Q137581 in Poland
Language Label Description Also known as
English
Combination of cycle routes in the centre of Mielna
Project Q137581 in Poland

    Statements

    0 references
    53,148.0 zloty
    0 references
    12,755.52 Euro
    13 January 2020
    0 references
    203,990.45 zloty
    0 references
    48,957.71 Euro
    13 January 2020
    0 references
    26.05 percent
    0 references
    2 January 2020
    0 references
    30 June 2020
    0 references
    GMINA MIELNO
    0 references
    0 references
    Przedmiotem projektu jest budowa drogi rowerowej o długości ok. 140 metrów, która będzie łączyć inne trasy rowerowe projektowane i realizowane w ramach innych projektów a jednocześnie centrum miasta z planowanym centrum przesiadkowym. W ramach projektu powstanie też oznakowanie wybudowanego odcinka drogi rowerowej oraz części ul. Północnej od drogi rowerowej, będącej przedmiotem niniejszego projektu do połączenia z projektowaną drogą rowerową w kierunku centrum przesiadkowego i Koszalina. Oznakowanie obejmie łącznie odcinek o długości ok. 310 m. Koniecznym elementem projektu jest oznakowanie odcinka ul. Północnej (170 m). Będzie to głównie oznakowanie informacyjne (kierunkowe), którego celem będzie nakierowanie rowerzystów na drogi rowerowe, tak aby dojeżdżając do ul. Północnej nie kontynuowali podróży drogami powiatowymi. Ponadto, zostanie zrealizowane oświetlenie nowego odcinka połączenia tras rowerowych. (Polish)
    0 references
    The object of the project is the construction of a bicycle road with a length of approx. 140 metres, which will combine other cycling routes designed and carried out under other projects and at the same time the city centre with the planned interchange centre. As part of the project, there will also be a marking of the built section of the bicycle road and part of the street. From the North from the bicycle road which is the subject of this project to the connection with the designed bicycle road towards the interchange centre and Koszalin. The marking will include a section with a length of approx. 310 m. A necessary element of the project is the marking of the street section. North (170 m). This will mainly be an information label (directional) aimed at targeting cyclists on cycling roads so as to reach the street. The North did not continue to travel through county roads. In addition, the lighting of the new section of the connection of cycling routes will be realised. (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’une route cyclable d’une longueur d’env. 140 mètres, qui combineront d’autres pistes cyclables conçues et mises en œuvre dans le cadre d’autres projets et en même temps le centre-ville et le centre de liaison prévu. Le projet marquera également la partie construite de la route cyclable et une partie de la rue. Nord de la route cyclable, qui fait l’objet de ce projet, à la connexion à la route cyclable prévue vers le hub et Koszalin. Le marquage couvrira une longueur totale d’env. 310 m. L’élément nécessaire du projet est le marquage de la section de l’ul. Nord (170 m). Il s’agira principalement d’une signalisation (directionnelle) destinée à cibler les cyclistes vers les routes cyclables, afin qu’ils puissent atteindre la rue. Ils n’ont pas poursuivi leur voyage sur les routes du comté. En outre, l’éclairage de la nouvelle section de la connexion piste cyclable sera réalisé. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.03.00-32-0006/19
    0 references