Development of public transport system of Kalisz Agglomeration with modernisation of street lighting – City of Kalisz (Q134963)

From EU Knowledge Graph
Revision as of 21:07, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q134963 in Poland
Language Label Description Also known as
English
Development of public transport system of Kalisz Agglomeration with modernisation of street lighting – City of Kalisz
Project Q134963 in Poland

    Statements

    0 references
    30,935,248.45 zloty
    0 references
    7,424,459.63 Euro
    13 January 2020
    0 references
    36,394,409.96 zloty
    0 references
    8,734,658.39 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 January 2017
    0 references
    29 November 2019
    0 references
    MIASTO KALISZ
    0 references
    0 references
    Zakres rzecz. proj. dot. realizacji 6 typów przedsięwzięć wskaz. w pkt. 1.12, ujętych w 5 grupach zadań: 1) Zakup 11 niskoemis. autobus. hybrydowych przystos. do potrzeb os. niepełnosp., o łącznej poj. 902 os., 2) Rozbudowa infr. transportu publ. miasta, w tym systemu ścieżek rower., poprzez: a) bud. zintegr. węzła przesiadk. (1 szt.) wraz z przynależną infrastrukturą techn. i drog. umożliwiającą właściwe funkcjon. węzła, zlokaliz. w rejonie dworców kolej. i autobus.; mieszkańcy M.Kalisza, AKO oraz turyści w obrębie węzła będą przemieszczać się pom. środkami transp. takimi jak: autob. miejski/podmiejski/dalekobieżny, pociąg, samochód os., rower.; węzeł składać będzie się przede wsz. z: miejsc postoj. dla autob. i parkingu Park&Ride – 1szt. (183 miejsc postoj., w tym 9 wyznacz. dla os. niepełnospr.) wraz z drogami manewrowymi i ciągami komunukac., parkingów Bike&Ride – 1szt. (liczba stanowisk: 20szt.), zatok autobus., chodników z dopuszcz. ruchu rower., ciągów pieszo-rower. i ścieżek rower. (łączna dł.: 0,607km) – szczegółowo zakres rzecz. zadania przedstawiono w pkt. 3.4 wniosku i SW; b) wyposażenie istniej. przystanków autobus. w urządzenia z zakresu telematyki – tablice dynam. inform. pasażer. (10 szt.) i biletomaty (6szt.). 3) Rozbudowa systemu zarządzania i organizacji ruchu – włączenie do ITS budowanej sygnal. świetlanej na skrzyż. ul. Staszica i Górnośl. 4) Modernizacja oświetl. uliczn. zwiększająca jego energooszcz. w obrębie 2 osiedli Kalisza: Winiary i Rypinek – w efekcie zamontowanych zostanie 847 szt. punktów świetl. 5) Kampania info-promo (1 szt.) – pakiet miękkich działań mających przybliżyć mieszkańcom tematykę niskiej emisji oraz przedstawić możliwe do wykorzystania w codziennym życiu działania ograniczające niską emisję – w tym przede wsz. działania mające nakłonić mieszk. do ogranicz. korzystania z samochodów os. i zastępowania ich w codziennych podróżach komunikacją publ. lub niezmotoryz. tj. przemieszczania się rowerem lub pieszo. (Polish)
    0 references
    Scope of item. project on implementation of 6 types of projects indicated in point. 1.12, included in 5 groups of tasks: 1) Purchase 11 low-emission. bus. hybrid harness to the needs of a part-party, with a total capacity. 902 pers., 2) Expansion of infr. transport publ. of the city, including the system of bike paths., by: a) Built-in. interchange nodes. (1 pieces) together with the associated technical infrastructure and roads. enabling the proper functionalities of the node, the location in the railway station area. and the bus.; residents of M.Kalisz, AKO and tourists within the node will move through transp. means such as: autob. Urban/suburban/long-distance, train, car car, bicycle.; the knot will consist first of the following: parking spaces. for autob. and parking lot Park&Ride – 1pcs. (183 parking spaces, of which 9 are indicated for the disabled) along with manoeuvring roads and communiques, car parks Bike &Ride – 1pcs. (number of posts: 20pcs.), bus bays., sidewalks with access to bike traffic., walking-bike lines. and bike paths. (total: 0.607 km) – the scope of the item is detailed in point. 3.4 of the proposal and the SW; B) equipment exists. bus stops. with telematics equipment – dynam boards. inform passenger. (10 pieces) and ticket machines (6 pieces). 3) Expansion of the traffic management and organisation system – integration into the ITS of a built light signal at the crossroads ul. Staszica and the Mountain. 4) Modernisation of lighting. street. increasing its energy efficiency within 2 Kalisz settlements: Winiary and Rypinek – as a result 847 light points will be installed. 5) The info-promo campaign (1 pcs.) – a package of soft activities aimed at bringing citizens closer to the subject of low emissions and to present activities that can be used in everyday life to reduce low emissions – including, above all, activities designed to induce inmates to reduce the use of cars and replace them in daily travels by public transport or non-motorism, i.e. moving by bicycle or on foot. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.03.03.04-30-0001/17
    0 references