Revitalisation of Kost Castle (Q59949)

From EU Knowledge Graph
Revision as of 21:07, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q59949 in Czech Republic
Language Label Description Also known as
English
Revitalisation of Kost Castle
Project Q59949 in Czech Republic

    Statements

    0 references
    74,987,090.27 Czech koruna
    0 references
    2,999,483.61 Euro
    1 October 2020
    0 references
    88,220,106.2 Czech koruna
    0 references
    3,528,804.25 Euro
    1 October 2020
    0 references
    85 percent
    0 references
    4 January 2016
    0 references
    31 December 2021
    0 references
    Kinský dal Borgo, a.s.
    0 references
    0 references

    50°9'40.0"N, 15°28'16.3"E
    0 references
    50351
    0 references
    Projekt se zaměřuje jednak na záchranné práce na hradě (řešení vlhkostních poměrů; oprava parkánové zdi a skalního masivu; konzervace plastických částí kamenného zdiva; odvlhčení a práce na krovu kaple sv. Anny; revitalizace povrchu nádvoří a parkánů), a jednak na návazné činnosti, které povedou ke zpřístupnění nových objektů pro návštěvníky i ke zvýšení celkového počtu návštěv (např. otevření nové expozice s 3D prezentací). Památka bude rovněž nově zabezpečena kamerami a záznamovým zařízením. (Czech)
    0 references
    The project focuses both on rescue work in the castle (solving moisture conditions; repair of the parking wall and rock massif; preservation of plastic parts of stone masonry; dehumidification and work on the roof of the chapel of St. Anne; revitalisation of courtyards and Parkans surfaces) and on the other hand, follow-up activities that will lead to the opening of new buildings for visitors as well as an increase in the total number of visits (e.g. opening a new exposition with a 3D presentation). The monument will also be newly secured by cameras and recording equipment. (English)
    23 October 2020
    0 references
    Le projet met l’accent sur les opérations de sauvetage au château (répondant aux conditions d’humidité; réparation du mur stationné et du bois massif rocheux; conservation des parties plastiques de la maçonnerie de pierre; déshumidification et travaux sur la poutre de la chapelle Sainte-Anne; revitalisation de la surface des cours et des parcs) et, d’autre part, des activités de suivi qui mèneront à l’ouverture de nouveaux objets pour les visiteurs et à une augmentation du nombre total de visites (par exemple, l’ouverture d’une nouvelle exposition avec une présentation 3D). Le monument sera également sécurisé par des caméras et des appareils d’enregistrement. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.06.3.33/0.0/0.0/15_015/0000313
    0 references