Road I/9, I/16 Mělník, bypass, 1st construction (Q57670)

From EU Knowledge Graph
Revision as of 20:54, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q57670 in Czech Republic
Language Label Description Also known as
English
Road I/9, I/16 Mělník, bypass, 1st construction
Project Q57670 in Czech Republic

    Statements

    0 references
    0 references
    137,184,091.65 Czech koruna
    0 references
    5,487,363.67 Euro
    10 January 2020
    0 references
    161,393,049.0 Czech koruna
    0 references
    6,455,721.96 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    18 December 2014
    0 references
    23 September 2016
    0 references
    30 September 2016
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba přeložky silnice I/9 v kategorii MS2 8,5/50 v celkové délce hlavní trasy 0,799 km. Stavba nejprve vede v trase stávající Pražské ulice a následně v trase původní vlečky cukrovaru Mělník. Napojení na stávající komunikace je řešeno okružními křižovatkami v Pražské a Mladoboleslavské ulici. Realizací projektu dojde ke snížení zátěže obyvatelstva hlukem a exhalacemi, zkrácení jízdní doby a zvýšení plynulosti dopravy a bezpečnosti silničního provozu. (Czech)
    0 references
    The object of the project is the construction of the relocation of road I/9 in category MS2 8.5/50 in the total length of the main route 0.799 km. The construction first leads on the route of the existing Prague Street and then on the route of the original line of the Mělník sugar mill. The connection to the existing roads is solved by circular crossroads in Prague and Mladadoboleslavská Street. The implementation of the project will reduce the burden on the population by noise and exhalations, reduced travel time and increase the flow of transport and road safety. (English)
    23 October 2020
    0 references
    L’objet du projet est la construction de la route I/9 repositionnée dans la catégorie MS2 8,5/50 pour la longueur totale de la route principale 0,799 km. La construction s’étend d’abord sur la route de la rue existante de Prague, puis sur la voie d’évitement d’origine de la sucrerie de Mělník. Le raccordement aux routes existantes est résolu par les intersections de Prague et de la rue Mladoboleslavská. La mise en œuvre du projet permettra d’alléger la charge qui pèse sur la population par le bruit et les exhalations, de réduire le temps de conduite et d’accroître la circulation routière et la sécurité routière. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.04.3.42/0.0/0.0/15_004/0000006
    0 references