Thermomodernisation of the church The Assumption of the Lord in Wolsztyn (Q134804)

From EU Knowledge Graph
Revision as of 20:40, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le sujet du projet est la thermomodernisation de l’église. L’Ascension du Seigneur à Wolsztyn a déterminé sur la base de l’audit énergétique et de la documentation technique, y compris: 1) la modernisation du système de chauffage pour le chauffage à l’air chaud sur la base d’un chauffage avec un brûleur à gaz et des conduits d’air — 1 kpl., dans le cadre suivant • le remplacement d’une chaudière à charbon à faible rendement par un brûleur à gaz,...)
Jump to navigation Jump to search
Project Q134804 in Poland
Language Label Description Also known as
English
Thermomodernisation of the church The Assumption of the Lord in Wolsztyn
Project Q134804 in Poland

    Statements

    0 references
    598,634.52 zloty
    0 references
    143,672.28 Euro
    13 January 2020
    0 references
    704,275.91 zloty
    0 references
    169,026.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 November 2016
    0 references
    31 July 2017
    0 references
    PARAFIA RZYMSKOKATOLICKA PW. NMP NIEPOKALANIE POCZĘTEJ
    0 references
    0 references
    Przedmiotem projektu jest termomodernizacja kościoła pw. Wniebowstąpienia Pańskiego w Wolsztynie określona na podstawie audytu energetycznego i dokumentacji technicznej, obejmująca:1) modernizację systemu ogrzewania na ogrzewanie ciepłym powietrzem w oparciu o nagrzewnicę z palnikiem gazowym i system kanałów powietrznych – 1 kpl., w następującym zakresie• wymiana kotła węglowego o niskiej sprawności na nagrzewnicę z palnikiem gazowym,• usunięcie przewodów instalacji c.o. oraz grzejników, • montaż systemu kanałów rozprowadzających powietrze z nagrzewnicy, przepustnic regulacyjnych, filtrów, klap p.poż., tłumików akustycznych, • wykonanie komina, wentylacji nawiewnej i wywiewnej, • automatyka układu (m.in.: skrzynka rozdzielcza, sterownik elektroniczny, instalacja elektryczna w obrębie pomieszczenia technicznego, podłączenie układu, uruchomienie systemu, analiza spalin),• roboty budowlane niezbędne do osiągnięcia zamierzonego efektu rzeczowego, jakim jest modernizacja systemu grzewczego.2) wymianę starych okien na nowe o współczynniku przenikania ciepła Umax=1,6 W/m2K – 20 szt.Prace budowlane prowadzone będą w Wolsztynie przy ul. 5 Stycznia 15, na nieruchomości oznaczonej geodezyjnie jako działka nr 59/2, obręb geodezyjny Wolsztyn 2.Wskaźnikami produktu będą:- Liczba zmodernizowanych energetycznie budynków – 1 szt,- Liczba zmodernizowanych źródeł ciepła – 1 szt. (Polish)
    0 references
    The subject of the project is the thermomodernisation of the church. The Ascension of the Lord in Wolsztyn determined on the basis of energy audit and technical documentation, including:1) modernisation of heating system for heating with warm air on the basis of heater with gas burner and air duct system – 1 kpl., in the following range• replacement of coal boiler with low efficiency for heating system with gas burner,• removal of pipes and radiators, • installation of a system of ducts distributing air from heater, ventilators and ventilators. distribution box, electronic controller, electrical installation within the technical room, system connection, system start-up, exhaust gas analysis),• construction works necessary to achieve the intended material effect, namely modernisation of the heating system.2) replacement of old windows with a heat transfer coefficient Umax=1.6 W/m2K – 20 pieces.The construction works will be carried out in Wolsztyn, on ul. 5 January 15, on the property designated geodetic as plot no. 59/2, the surveying area Wolsztyn 2.Product indicators will be:- Number of energy upgraded buildings – 1 units,- Number of modernised heat sources – 1 pieces. (English)
    21 October 2020
    0 references
    Le sujet du projet est la thermomodernisation de l’église. L’Ascension du Seigneur à Wolsztyn a déterminé sur la base de l’audit énergétique et de la documentation technique, y compris: 1) la modernisation du système de chauffage pour le chauffage à l’air chaud sur la base d’un chauffage avec un brûleur à gaz et des conduits d’air — 1 kpl., dans le cadre suivant • le remplacement d’une chaudière à charbon à faible rendement par un brûleur à gaz,• l’enlèvement des conduits du système de chauffage central et des radiateurs, • l’installation d’un système de conduits distribuant de l’air du chauffage, des gaz de contrôle, des filtres, des volets coupe-feu, des silencieux acoustiques, • l’exécution de la cheminée, de la ventilation et de la ventilation, • l’automatisation (e.g. boîte de distribution, contrôleur électronique, installation électrique dans la salle technique, raccordement du système, mise en service du système, analyse des gaz d’échappement),• travaux de construction nécessaires pour obtenir l’effet factuel prévu, à savoir la modernisation du système de chauffage.2) remplacement des vieilles fenêtres par un coefficient de transfert de chaleur Umax=1,6 W/m2K — 20 pièces. Les travaux de construction seront réalisés à Wolsztyn, ul. 5 janvier 15, sur la propriété désignée géodésiquement comme la parcelle no 59/2, zone d’arpentage Wolsztyn 2.Les indicateurs de produit seront:- Nombre de bâtiments modernisés par énergie — 1 pièce,- Nombre de sources de chaleur modernisées — 1 pièce. (French)
    2 December 2021
    0 references

    Identifiers

    RPWP.03.02.01-30-0073/15
    0 references