Comprehensive thermal modernisation of the building of Primary School No. 3 in Wągrowiec, located at ul. The Monastery 19 (Q134792)

From EU Knowledge Graph
Revision as of 20:38, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q134792 in Poland
Language Label Description Also known as
English
Comprehensive thermal modernisation of the building of Primary School No. 3 in Wągrowiec, located at ul. The Monastery 19
Project Q134792 in Poland

    Statements

    0 references
    656,609.77 zloty
    0 references
    157,586.34 Euro
    13 January 2020
    0 references
    772,482.09 zloty
    0 references
    185,395.7 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 July 2015
    0 references
    28 September 2017
    0 references
    GMINA MIEJSKA WĄGROWIEC
    0 references
    0 references
    Przedmiotem projektu jest przeprowadzenie kompleksowej modernizacji energetycznej budynku Szkoły Podstawowej nr 3 w Wągrowcu zlokalizowanego przy ul. Klasztornej 19, który to obiekt składa się z dwóch części – stara część wybudowana w 1919 r. (budynek dawnego Gimnazjum Żeńskiego wpisany do rejestru zabytków) oraz nowa części wybudowana w 1978 r.W ramach projektu zostaną przeprowadzone następujące działania, które przyczynią się do znacznej poprawy efektywności energetycznej ww. obiektu:Stara część budynku:- docieplenie stropów pod nieogrzewanymi poddaszami,- ocieplenie ścian wewnętrznych oddzielających pomieszczenia ogrzewane od nieogrzewanego poddasza,- wymiana lub renowacja starych okien, drzwi zewnętrznych,- pozostałe prace (izolacja ścian fundamentowych, naprawa zadaszeń, podestów i schodów zewnętrznych, remont elewacji) – wykazane w budżecie projektu jako wydatki niekwalifikowalne.Nowa część budynku:- docieplenie ścian zewnętrznych, dachów i stropodachu,- wymiana starych okien, drzwi,- pozostałe prace budowlane.Ponadto w ramach projektu dotychczasowa kotłownia węglowa zostanie zastąpiona nową, zasilaną gazem, ze wspomaganiem produkcji c.w.u. przy użyciu pompy ciepła typu powietrze/woda. W obu częściach budynku zostanie wymieniona instalacja c.o. wraz z montażem nowych grzejników wyposażonych w zawory termostatyczne oraz zostanie wymieniona instalacja c.w.u. Dodatkowo w ramach wydatków niekwalifikowalnych ściany oraz sufity wszystkich pomieszczeń budynku zostaną pomalowane.W wyniku realizacji projektu w 2017 r. zostaną osiągnięte następujące produkty:- Liczba zmodernizowanych energetycznie budynków - 1 szt. - Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych - 0,0021 MWt- Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE - 1 szt.- Powierzchnia użytkowa budynków poddanych termomodernizacji - 1 336 m2- L. zmodernizowanych źródeł ciepła - 1 szt.Planowane wydatki kwalifikowalne - 772 482,09 zł, niekwalifikowalne - 352 808,89 zł. (Polish)
    0 references
    The subject of the project is to carry out a comprehensive energy modernization of the building of Primary School No. 3 in Wągrowiec located at ul. Klasztorna 19, which consists of two parts - the old part built in 1919 (the building of the former Women's Gymnasium entered in the register of monuments) and the new part built in 1978 The following activities will be carried out as part of the project, which will contribute to a significant improvement in efficiency energy above. of the structure: Old part of the building: - insulation of ceilings under unheated attics, - insulation of internal walls separating heated rooms from unheated attics, - replacement or renovation of old windows, external doors, - other works (insulation of foundation walls, repair of roofs, landings and external stairs, renovation of the facade) - shown in the project budget as non-eligible expenses New part of the building: - insulation of external walls, roofs and flat roof, - replacement of old windows and doors, - other construction works. In addition, the existing coal-fired boiler room will be replaced by a new gas-powered boiler house , with the support of domestic hot water production using an air-to-water heat pump. In both parts of the building, the central heating installation will be replaced, along with the installation of new radiators equipped with thermostatic valves, and the domestic hot water installation will be replaced. Additionally, as part of non-eligible expenses, the walls and ceilings of all rooms in the building will be painted. Number of energy-modernized buildings - 1 item - Additional capacity to generate thermal energy from renewable sources - 0.0021 MWt - Number of thermal energy generation units from RES - 1 item - Usable floor area of buildings subjected to thermal modernization - 1,336 m2 - L. of modernized sources heat - 1 item Planned eligible expenses - PLN 772,482.09, non-eligible expenses - PLN 352,808.89. (English)
    30 November 2020
    0 references

    Identifiers

    RPWP.03.02.01-30-0042/15
    0 references