Comprehensive energy modernisation of the School Complex building in Ptaszkowo (Q134780)

From EU Knowledge Graph
Revision as of 20:37, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le sujet du projet est la thermomodernisation complète du bâtiment zesp. Écoles d’oiseaux, qui abrite l’école primaire et le gymnase. Nombre total de destinataires directs env. 270 personnes.Le bâtiment a été construit en 1992. A ce jour, aucun travail de thermomodernisation n’a été réalisé.Dans le cadre de la tâche, la gamme suivante est prévue: les murs sont prévus en styrophage. d’une épaisseur de 13 cm (lambda 0,04 W/mK), le réchauffement de...)
Jump to navigation Jump to search
Project Q134780 in Poland
Language Label Description Also known as
English
Comprehensive energy modernisation of the School Complex building in Ptaszkowo
Project Q134780 in Poland

    Statements

    0 references
    848,996.26 zloty
    0 references
    203,759.10 Euro
    13 January 2020
    0 references
    998,819.13 zloty
    0 references
    239,716.59 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 January 2017
    0 references
    14 November 2017
    0 references
    GMINA GRODZISK WIELKOPOLSKI
    0 references
    Przedmiotem projektu jest kompleksowa termomodernizacja budynku Zesp. Szkół w Ptaszkowie, w którym mieści się Szkoła Podstawowa i Gimnazjum. Łączna ilość bezpośrednich odbiorców ok. 270 osób.Budynek został wybudowany w roku 1992. Do tej pory nie przeprowadzono w nim żadnych prac termomodernizacyjnych.W ramach zadania planuje się następujący zakres prac:docieplenie ścian płytami styrop. o grubości 13 cm (lambda 0,04 W/mK),docieplenie stropodachu styrop. o grubości 14 cm, docieplenie stropodachu części budynku z kotłownią styropianem o grubości 22 cm, wykonanie nowego pokrycia dachowego z papy termozgrz.,wykonanie tynków cienkowarstw. mineralnych,malowanie elewacji,wykonanie obróbek blacharskich wokół budynku, kominów, rynien i rur spustowych, instalacji odgromowej, robót towarzyszących (obróbka masztów i anten, pomiary instalacji odgromowej).wymiana zniszczonej, nieszczelnej stolarki okiennej na nowe okna PCV o współczynniku przenikania ciepła U=1.100 W/m2K z zamontowanymi nawiewnikami higrosterowalnymi (dla zapewnienia prawidłowej wentylacji) oraz drzwiowej, zewnętrznej o współczynniku przenikania ciepła U=1.500 W/m2K,W ramach zadania planuje się także wymianę zaworów grzejnikowych lub złączki grzejnikowej - szt. 84 , wymianę rur przyłącznych - szt. 84, wymianę opraw świetlówkowych z blachy stalowej z kloszem z tworzyw sztucznych lub z rastrem metalowym na LED-y - sztuk 252, wymianę opraw żarowych bez specjalnych zabezpieczeń lub sufitowych na betonie na LED - sztuk 35montaż instalacji fotowoltaicznej o mocy 4,95 kW z bateriami montowanymi na dachu budynku.Produktami inwestycji będzie (2017 r.):Liczba zmodernizowanych energetycznie budynków – 1 szt. Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych, – 0,00495 MWeLiczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE, – 1 szt.Powierzchnia użytkowa budynków poddanych termomodernizacji - 1639 m2 (Polish)
    0 references
    The subject of the project is comprehensive thermal modernisation of the Zesp building. Schools in Ptaszków, which houses primary school and junior high school. Total number of direct recipients approx. 270 people.The building was built in 1992. As part of the task, the following range of works are planned: insulation of the walls with styrop. of thickness of 13 cm (lambda 0.04 W/mK), insulation of styrop. of thickness of 14 cm, warming of the ceilings of the interior part of the building with a foam window of a thickness of 22 cm, making a new roof covering with a thermostorm., performance of the interior heats. 84, replacement of connecting pipes – pc. 84, replacement of luminaires made of steel sheet with plastic cover or metal raster for LEDs – pieces 252, replacement of incandescent luminaires without special protections or ceilings on LED concrete – pieces 35assembly of photovoltaic installation with 4.95 kW power with batteries mounted on the roof of the building.The investment products will be (2017):Number of energy upgraded buildings – 1 pieces. Additional capacity to generate electricity from renewable sources, – 0.00495 MWeNumber of built electricity generation units from RES, – 1 units Used surface of buildings undergoing thermal modernisation – 1639 m² (English)
    21 October 2020
    0 references
    Le sujet du projet est la thermomodernisation complète du bâtiment zesp. Écoles d’oiseaux, qui abrite l’école primaire et le gymnase. Nombre total de destinataires directs env. 270 personnes.Le bâtiment a été construit en 1992. A ce jour, aucun travail de thermomodernisation n’a été réalisé.Dans le cadre de la tâche, la gamme suivante est prévue: les murs sont prévus en styrophage. d’une épaisseur de 13 cm (lambda 0,04 W/mK), le réchauffement de l’édifice de la Styrofoam. 14 cm d’épaisseur. cheminées, gouttières et tuyaux de vidange, système de foudre, travaux d’accompagnement (traitement des mâts et des antennes, mesures du système de foudre).Remplacement de la menuiserie de fenêtre endommagée et fuite dans les nouvelles fenêtres en PVC avec coefficient de transfert de chaleur U=1.100 W/m2K par des diffuseurs hygrostériables (pour une bonne ventilation) et porte, coefficient de transfert de chaleur externe U=1,500 W/m2K. Dans le cadre de la tâche, il est également prévu de remplacer les vannes de radiateur ou les raccords de radiateur — pcs. 84, remplacement des tuyaux de raccordement — pcs. 84, remplacement des luminaires fluorescents en tôle d’acier avec lentille en plastique ou avec raster métallique pour LED — 252, remplacement des luminaires à incandescence sans protection spéciale ou plafond sur béton à LED — 35montage d’une installation photovoltaïque d’une puissance de 4,95 kW avec batteries montées sur le toit du bâtiment.Les produits d’investissement seront (2017): Nombre de bâtiments modifiés par énergie — 1 pcs. Capacité supplémentaire de production d’électricité à partir de sources renouvelables, — 0,00495 MWeNombre d’unités construites pour la production d’électricité à partir de sources d’énergie renouvelables, — 1 pcs. Superficie utilisée des bâtiments soumis à la modernisation thermique — 1 639 m² (French)
    2 December 2021
    0 references

    Identifiers

    RPWP.03.02.01-30-0009/15
    0 references