Merry kindergarten Academy in Public Local Government Kindergarten in Laski (Q136437)

From EU Knowledge Graph
Revision as of 20:15, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet (proj) vise à garantir des normes élevées en matière d’éducation préscolaire en augmentant la disponibilité d’un enseignement préscolaire de qualité en créant 25 nouveaux places, en achetant du matériel et du matériel pédagogiques, et en élargissant l’offre d’activités supplémentaires pour les enfants de 3 à 4 ans au cours de l’année scolaire 2019/20, du IX.19 au VI.20. Le personnel sera également recruté et les qualifications professi...)
Jump to navigation Jump to search
Project Q136437 in Poland
Language Label Description Also known as
English
Merry kindergarten Academy in Public Local Government Kindergarten in Laski
Project Q136437 in Poland

    Statements

    0 references
    134,289.37 zloty
    0 references
    32,229.45 Euro
    13 January 2020
    0 references
    157,987.5 zloty
    0 references
    37,917.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 August 2019
    0 references
    31 July 2020
    0 references
    GMINA TRZCINICA
    0 references
    0 references
    Projekt (proj) ma zapewnić wysokie standardy wychowania przedszkolnego (wp) przez zwiększenie dostępności do dobrej jakości edukacji przedszkolnej przez utworzenie 25 nowych miejsc, zakup pomocy dydaktycznych i wyposażenia oraz rozszerzenie oferty o zajęcia dodatkowe dla dzieci 3-4 letnich w roku szkolnym 2019/20 w okresie od IX.19r. do VI.20r. Zatrudniona zostanie też kadra i podwyższone zostaną kwalifikacje zawodowe nauczycieli/lek wp do dnia 30.VI.20r.GENEZANa terenie Gminy Trzcinica (GT) działa Zespół Szkół w Laskach (ZSL) z 2 oddziałami przedszkolnymi (op) i w Trzcinicy (ZST) z 4 op. Łącznie jest 6 op dla 145 dzieci w tym 1 niewymiarowy op w ZSL z 20 miejscami. Stołówka dla op w ZSL jest w innym budynku. Od 2017r zgodnie z przepisami GT ma zapewnić miejsca wp dla wszystkich dzieci 3-6 letnich. GT do 2019r planuje przebudować i rozbudować budynek przedszkola w ZSL z uwagi na zły stan techniczny, wymogi bhp, sanitarne i brak miejsc. Wg danych z USC w 2018r w GT będzie 216 dzieci 3-6letnich (115K i 101M). Przebudowa budynku ZSL i utworzenie dodatkowego 1op pozwoli zapewnić w 2019 miejsca dla 175 dzieci 3-6lat co stanowi 81%GT w latach 2013-15 realizowała proj Przedszkole marzeń (PM) z działania 9.1.1 z POKL w ramach którego utworzone były 2 nowe op-1 w ZST i 1 w ZSL. Wg danych z 2011r GT zajmowała 6 miejsce pod względem najniższego w regionie stopnia upowszechniania edukacji wp. Utworzone w ramach proj. PM 2 dodatkowe op dla dzieci 3-4 lat utrzymane zostaną w latach 2015/16 i 16/17 w podstawowej ofercie edukacyjnej-trwałość proj PM.Niniejszy proj ma stanowić kontynuację podjętych działań w zakresie wp w latach 2019/20 po planowanej przebudowie i rozbudowie budynku ZSL, zapewni utworzenie potrzebnych miejsc wp z bogatą ofertą wyrównującą szanse. GT aktualnie nie posiada możliwości lokalowych i nie jest w stanie zapewnić nowych miejsc bez rozbudowy bazy ZSL. GT nie jest w stanie zapewnić też rozbudowanej oferty wp z bezpłatnymi zajęciami z uwagi na niski dochód. (Polish)
    0 references
    The project (project) aims to ensure high standards of pre-school education (wp) by increasing accessibility to good quality preschool education by creating 25 new places, the purchase of teaching aid and equipment, and the extension of the offer to additional classes for 3-4 year old children in the school year 2019/20 in the period from IX.19 to VI.20. Staff will also be employed and the professional qualifications of teachers/medicines will be increased until 30.VI.20r.GENEZAIn the municipality of Trzcinica (GT) there is a School Team in Laski (ZSL) with 2 pre-school branches (op) and in Trzcinica (ZST) from 4 op. There is a total of 6 op for 145 children including 1 undersised op in ZSL with 20 seats. The canteen for op in ZSL is in another building. Since 2017, according to GT regulations, it is intended to provide places for all 3-6 year old children. GT until 2019 plans to rebuild and expand the kindergarten building in ZSL due to poor technical condition, health and safety requirements, sanitary and lack of space. According to data from USC in 2018, there will be 216 children 3-6 years old (115K and 101M). The reconstruction of the ZSL building and the creation of an additional 1op will provide space in 2019 for 175 children 3-6 years old, which represents 81 % of the GT in the years 2013-15 carried out a project of Dream Preschool (PM) with action 9.1.1 with POKL, in which 2 new op-1 were created in ZST and 1 in the ZSL. According to data from 2011, GT ranked 6th in terms of the lowest level of dissemination of education in the region. Created as part of the project. Pm 2 additional ops for children 3-4 years will be maintained in 2015/16 and 16/17 in the basic educational offer – durability of PM project.This project is intended to be a continuation of the activities undertaken in the field of 2019/20 after the planned reconstruction and expansion of the ZSL building, will ensure the creation of necessary sites with a wide range of equal opportunities. GT currently does not have the capacity of the premises and is unable to provide new places without expansion of the ZSL base. GT is also unable to provide an extensive offer of free classes due to low income. (English)
    21 October 2020
    0 references
    Le projet (proj) vise à garantir des normes élevées en matière d’éducation préscolaire en augmentant la disponibilité d’un enseignement préscolaire de qualité en créant 25 nouveaux places, en achetant du matériel et du matériel pédagogiques, et en élargissant l’offre d’activités supplémentaires pour les enfants de 3 à 4 ans au cours de l’année scolaire 2019/20, du IX.19 au VI.20. Le personnel sera également recruté et les qualifications professionnelles des enseignants seront augmentées jusqu’au 30.VI.20r.GENEZADans la zone de la municipalité de Trzcinica (GT), le complexe scolaire de Laski (ZSL) fonctionne avec 2 départements préscolaires (op) et à Trzcinica (ZST) de 4 op. Un total de 6 ops pour 145 enfants dont 1 op sous-dimensionné en ZSL avec 20 sièges. La cantine pour l’opération en ZSL est dans un autre bâtiment. À partir de 2017, selon les règlements GT, il est destiné à fournir un espace wp pour tous les enfants de 3-6 ans. GT d’ici 2019 prévoit de reconstruire et d’agrandir le bâtiment de la maternelle à ZSL en raison d’un mauvais état technique, des exigences en matière de santé et de sécurité et du manque d’espace. Selon les données USC en 2018, dans GT, il y aura 216 enfants de 3 à 6 ans (115K et 101M). La reconstruction du bâtiment ZSL et la création d’une 1op supplémentaire permettront de fournir en 2019 un espace pour 175 enfants de 3 à 6 ans, ce qui représente 81 % du GT dans les années 2013-15 mis en œuvre le projet de la maternelle des rêves (PM) à partir de la mesure 9.1.1 du POKL, qui a créé 2 nouveaux op-1 dans le ZST et 1 dans le ZSL. D’après les données de 2011, GT se classait 6e en ce qui concerne le niveau de diffusion de l’éducation le plus bas de la région. Créé dans le cadre du projet. PM 2 op supplémentaire pour les enfants 3-4 ans sera maintenu en 2015/16 et 16/17 dans l’offre éducative de base-proj PM durabilité.Ce projet est destiné à poursuivre les mesures prises en 2019/20 après le projet de réaménagement et d’agrandissement du bâtiment ZSL, assurera la création des places nécessaires en plus d’une offre riche qui égalise les chances. GT ne dispose actuellement pas de la capacité des locaux et n’est pas en mesure de fournir de nouveaux locaux sans l’agrandissement de la base ZSL. GT n’est pas non plus en mesure de fournir une offre étendue de classes gratuites en raison du faible revenu. (French)
    2 December 2021
    0 references

    Identifiers

    RPWP.08.01.01-30-0009/16
    0 references