ADAPTATION AND EQUIPMENT OF THE FARM BUILDING FOR THE POTTER’S WORKSHOP (Q132736)

From EU Knowledge Graph
Revision as of 20:02, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Adapatation DU BUILDING ÉCONOMIQUE POUR le studio d’un potier Emplacement de l’investissement: la zone de l’école primaire no 3 à Gołdapi (Gołdap, ul. Kosciuszko 25) Le caractère prévu du bâtiment: 1 étage, surface du bâtiment: 58,17 m², surface utilisable: 43,98 m² Atelier équipé d’une salle d’atelier, WC accès aux besoins des personnes sous-parleurs, vestiaire, entrepôt Atelier pour le développement de l’éducation non formelle, l’activation et...)
Jump to navigation Jump to search
Project Q132736 in Poland
Language Label Description Also known as
English
ADAPTATION AND EQUIPMENT OF THE FARM BUILDING FOR THE POTTER’S WORKSHOP
Project Q132736 in Poland

    Statements

    0 references
    0 references
    177,713.5 zloty
    0 references
    42,651.24 Euro
    13 January 2020
    0 references
    242,907.42 zloty
    0 references
    58,297.78 Euro
    13 January 2020
    0 references
    73.16 percent
    0 references
    19 May 2017
    0 references
    30 August 2018
    0 references
    GMINA GOŁDAP
    0 references
    0 references

    54°18'28.8"N, 22°18'6.8"E
    0 references
    ADAPATCJA BUDYNKU GOSPODARCZEGO NA PRACOWNIĘ GARNCARSKĄ Lokalizacja inwestycji: teren Szkoły Podstawowej nr 3 w Gołdapi (Gołdap, ul. Kościuszki 25) Planowana charakt. budynku: 1-kondygnacyjny, pow. zabudowy: 58,17m2, pow. użytkowa: 43,98m2 Pracownia wyposażona w salę warsztatową, WC przyst. do potrzeb osób niepełnospr., szatnię, magazyn Pracownia do rozwoju edukacji poza formalnej, aktywizacji i integracji społecznej -Roboty budowlane: 1) instalacja elektryczna 2) instalacja sanitarna: wodociagowa, kanalizacyjna, co i cw, wentylacji grawitacyjnej 3) prace budowlane: rozbiórkowe, ziemne, murarskie, izolacje fundamentów, strop drewniany, tynki wewn., posadzki i malowanie, dach, stolarka okienna i drzwiowa, elewacja, elementy zewn. (opaska betonowa wokół budynku, podbudowa pod opaskę i podest) -Wyposażenie: 1) elektr. piec do wypalania wyrobów z gliny 2) koło garncarskie z napędem elektr. 3) warsztatowe: stoły, siedziska, toczki stalowe, wałki dla ceramików, stojaki do wypalania, narzędzia do modelowania, itd. Skala Projektu optymalna pod względem techn.–technologicznym, ekonom. i środowiskowym Etapy, sposób wdrażania proj: 1.Oprac. programu inwestycji, dokumentacji techn. i studium wykonalności 2.Złożenie wniosku, umowa o dofinans. 3.Wybór wykonawców wg PZP– roboty budowlane, dostawa wyposażenia, nadzór inwestorski, promocja 4.Realizacja prac wg harmonogramu rzecz.-finans. 5.Odbiór prac (protokoły) 6.Zakończenie proj. 7.Finans. rozliczenie proj. Proj. zgodny z: -Ponadlokalnym programem rewitalizacji sieci miast Cittaslow Woj. Warm.-Maz. -SzOOP RPO WiM– cel temat.9 Promowanie wyłączenia społecznego, walka z ubóstwem i wszelką dyskryminacją, priorytet inwest.9b: Wspieranie rewitalizacji fizycznej, gosp. i społecznej (...)”, celem szczegółowym: Lepsza jakość życia społeczności (...); Zakres proj. zg. z typem wspieranych proj., przyjętych wskaźn.: liczba wspartych obiektów infrastr. zlokalizowanych na rewitalizowanych obszarach (Polish)
    0 references
    Investment ADAPACTIA FOR the pottery workshop Location of the investment: primary School No. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Planned charactt. of the building: 1-storey, overhead: 58,17 m², usable area: 43,98 m² Laboratory equipped with a workshop room, toilet for the needs of the disabled, locker room, magazine Laboratory for the development of non-formal education, activation and social inclusion -Construction works: 1) Electrical installation 2) sanitary installation: water supply, sewage, as well as cw, gravity ventilation 3) construction work: demolition, earth, masonry, foundation insulation, wooden ceiling, interior plaster, flooring and painting, roof, window and door carpentry, facade, external elements. (concrete band around the building, armband and platform) -Equipment: 1) electr. furnace for firing clay products 2) electric potter wheel. 3) workshop: tables, seats, steel rollers, ceramic rollers, firing racks, modeling tools, etc. Project scale optimal in terms of technology-technological, economising and environmental Phases, method of project implementation: 1.Development of the investment programme, technical documentation and feasibility study 2. Submission of application, grant agreement. 3.Selection of contractors according to PZP- construction works, equipment delivery, investor supervision, promotion 4. 5.Receiving works (protocols) 6.Finishing project. 7.Finance. billing project. Project. compatible with: —over-local programme of revitalising the Cittaslow city network Woj. It’s Warm.-Maz. —The SzOOP of the RPO WiM – Objective.9 Promoting social exclusion, combating poverty and all discrimination, investment priority.9b: Support for physical, private and social revitalisation (...)', with a specific objective: A better quality of life for the community (...); Scope of project according to the type of supported project, accepted indications: number of supported infrastr. objects located in revitalised areas (English)
    21 October 2020
    0 references
    Adapatation DU BUILDING ÉCONOMIQUE POUR le studio d’un potier Emplacement de l’investissement: la zone de l’école primaire no 3 à Gołdapi (Gołdap, ul. Kosciuszko 25) Le caractère prévu du bâtiment: 1 étage, surface du bâtiment: 58,17 m², surface utilisable: 43,98 m² Atelier équipé d’une salle d’atelier, WC accès aux besoins des personnes sous-parleurs, vestiaire, entrepôt Atelier pour le développement de l’éducation non formelle, l’activation et l’intégration sociale — Travaux de construction: 1) Installation électrique 2) Installation sanitaire: eau, égouts, co et cw, ventilation gravitationnelle 3) travaux de construction: démolition, sol, maçonnerie, isolation de fondations, plafond en bois, plâtre intérieur, revêtement de sol et peinture, toit, menuiserie de fenêtre et de porte, façade, éléments extérieurs. (cadre en béton autour du bâtiment, sous-couche et plate-forme) -Équipement: 1) four électrique pour la cuisson des produits d’argile 2) roue de poterie avec entraînement électrique. 3) Atelier: tables, sièges, tournages en acier, rouleaux en céramique, grilles de cuisson, outils de modélisation, etc. L’échelle du projet est optimale en termes d’étapes technologiques-technologiques, économiques et environnementales, comment mettre en œuvre le projet: 1.Développement du programme d’investissement, documentation technique et étude de faisabilité 2. Présentation de la demande, accord de financement. 3.Choice des entrepreneurs selon PZP- travaux de construction, fourniture d’équipement, supervision des investisseurs, promotion 4. Mise en œuvre des travaux selon le calendrier des choses.-financement. 5.Réception des travaux (protocoles) 6.L’achèvement du projet. 7. Financier. proj règlement. Projection selon: —Un programme super-local pour la revitalisation du réseau de la ville de Cittaslow Woj. Maz chaud. —SZOOP ROP WiM — thème objectif.9 Promouvoir l’exclusion sociale, lutter contre la pauvreté et toute discrimination, investissements prioritaires.9b: Soutenir la régénération physique, environnementale et sociale (...)", l’objectif spécifique: Une meilleure qualité de vie pour la communauté (...); Portée du projet en fonction du type de projet soutenu, indications adoptées: nombre d ‘infrastructures bénéficiant d’ un appui dans les zones revitalisées (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.08.01.00-28-0010/17
    0 references