Refurbishment of Water Treatment Station in Butryn, Municipality Purda (Q132495)

From EU Knowledge Graph
Revision as of 19:41, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la rénovation de l’usine de traitement de l’eau de Butrynach, Purda. (parcelles: 134/3, 133/3, 131/5, 132/2, 132/4) gamme d’investissements: Cette intention d’investissement consistera en: rénovation du bâtiment technologique existant de la station de traitement de l’eau, rénovation (remplacement) des équipements technologiques de traitement de l’eau (ensemble de pompes, filtres, canalisations, compresseurs, ventilateurs, c...)
Jump to navigation Jump to search
Project Q132495 in Poland
Language Label Description Also known as
English
Refurbishment of Water Treatment Station in Butryn, Municipality Purda
Project Q132495 in Poland

    Statements

    0 references
    0 references
    0 references
    1,377,131.53 zloty
    0 references
    330,511.57 Euro
    13 January 2020
    0 references
    1,620,154.74 zloty
    0 references
    388,837.14 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 February 2018
    0 references
    31 March 2020
    0 references
    GMINA PURDA
    0 references
    0 references

    53°42'31.0"N, 20°42'12.2"E
    0 references
    Przedmiotem projektu jest remont stacji uzdatniana wody w Butrynach, g. Purda. (działki: 134/3, 133/3, 131/5, 132/2, 132/4) zakres inwestycji: Niniejsze zamierzenie inwestycyjne polegać będzie na: remoncie istniejącego budynku technologicznego Stacji Uzdatniania Wody, remoncie (wymianie) urządzeń technologicznych uzdatniających wodę (zestawu pomp, filtrów, rurociągów, sprężarki, dmuchawy, rurociągów, armatury, itd.), remoncie (wymianie) urządzeń i instalacji wod-kan, wentylacji i ogrzewania, remoncie (wymianie) sieci i instalacji elektrycznej, sterowania i automatyki, remoncie (wymianie) obudów studni głębinowych, wraz z orurowaniem i wymianą pomp, remoncie odstojnika popłuczyn, remoncie rurociągów międzyobiektowych technologicznych, remoncie ogrodzenia, utwardzenia działki budowlanej. Etapy realizacji projektu: - złożenie wniosku o dofinansowanie - podpisanie umowy o dofinansowanie - wybór wykonawcy zgodnie z PZP - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: -podpisanie umowy -realizacja prac/wdrożenia -odbiór końcowy i podpisanie prot. Proj. wpisuje się w założenia wpisane w RPO WIM: Oś priorytetowa 5 Środowisko przyrodnicze i racjonalne wykorzystanie zasobów, Działanie 5.2 Gospodarka wodno-ściekowa Cel tematyczny 6 – Zachowanie i ochrona środowiska przyrodniczego oraz wspieranie efektywnego gospodarowania zasobami Priorytet inwestycyjny 6b – Inwestowanie w sektor gospodarki wodnej celem wypełnienia zobowiązań określonych w dorobku prawnym Unii w zakresie środowiska oraz zaspokojenie wykraczających poza te zobowiązania potrzeb inwestycyjnych, określonych przez państwa członkowskie. (Polish)
    0 references
    The subject of the project is the renovation of the water treatment station in Butryn, g. Purda. (Mondays: 134/3, 133/3, 131/5, 132/2, 132/4) range of investments: This investment plan will consist of: renovation of the existing technology building of the Water Treatment Station, renovation (replacement) of technological equipment for water treatment (a set of pumps, filters, pipelines, compressors, blowers, pipes, fittings, etc.), refurbishment (replacement) of appliances and installations of water-channel, ventilation and heating, repair (replacement) of electrical networks and installations, control and automation, repairing of equipment and repairs Stages of project implementation: — submission of the application for funding – signing of the grant agreement – selection of the contractor in accordance with the PZP – conclusion of an agreement with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: —conclusion of the contract -implementation of works/implementation -final reception and signing of the protocol. The project fits into the assumptions entered in the WIM ROP: Priority axis 5 Environment and rational use of resources, Measure 5.2 Water and waste water management Thematic objective 6 – Conservation and protection of the natural environment and the promotion of resource efficiency Investment priority 6b – Investing in the water sector in order to meet the obligations set out in the Union’s environmental acquis and to meet investment needs beyond these commitments, as defined by the Member States. (English)
    21 October 2020
    0 references
    L’objet du projet est la rénovation de l’usine de traitement de l’eau de Butrynach, Purda. (parcelles: 134/3, 133/3, 131/5, 132/2, 132/4) gamme d’investissements: Cette intention d’investissement consistera en: rénovation du bâtiment technologique existant de la station de traitement de l’eau, rénovation (remplacement) des équipements technologiques de traitement de l’eau (ensemble de pompes, filtres, canalisations, compresseurs, ventilateurs, canalisations, raccords, etc.), rénovation (remplacement) des équipements et installations des canaux d’eau, ventilation et chauffage, rénovation (remplacement) du réseau électrique et installation, contrôle et automatisation, rénovation (remplacement) des logements de puits submersibles, y compris tuyauterie et remplacement des pompes, réparation du détachement des lavages, rénovation des pipelines technologiques intersites, rénovation de la clôture, durcissement du terrain. Étapes de la mise en œuvre du projet: — présentation de la demande de financement — signature de la convention de subvention — sélection du contractant conformément au PHP — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final de la méthode de mise en œuvre du projet: —signer le contrat — exécution des travaux/exécution — réception finale et signature de la Proj. est conforme aux hypothèses figurant dans le ROP WIM: Axe prioritaire 5 Environnement et utilisation efficace des ressources, mesure 5.2 Gestion de l’eau et des eaux usées Objectif thématique 6 — Préserver et protéger l’environnement et promouvoir l’utilisation efficace des ressources Priorité 6b — Investir dans le secteur de l’eau afin de satisfaire aux obligations énoncées dans l’acquis environnemental de l’Union et de répondre aux besoins d’investissement au-delà de ces engagements, tels que définis par les États membres. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.05.02.00-28-0017/18
    0 references