Construction of sanitary sewage system of Lwówek commune, village Zębowo (Q135058)
Jump to navigation
Jump to search
Project Q135058 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of sanitary sewage system of Lwówek commune, village Zębowo |
Project Q135058 in Poland |
Statements
819,081.66 zloty
0 references
963,625.49 zloty
0 references
85.0 percent
0 references
6 May 2016
0 references
30 December 2016
0 references
ZAKŁAD GOSPODARKI KOMUNALNEJ W LWÓWKU SP. Z O.O.
0 references
Przedmiotem wnioskowanego Przedsięwzięcia jest budowa kanalizacji sanitarnej w Aglomeracji Lwówek uwzględnionej w IV AKPOŚK 2015 rok oraz w Master Planie pod Numerem PLWL090.W ramach Przedsięwzięcia realizowanego w miejscowości Zębowo planuje się wykonać budowę łącznie 2,51798 km sieci kanalizacji sanitarnej (1909,5+608,48 = 2517,98) wraz z pompownią. Szczegółowy zakres inwestycji przedstawiono poniżej: 1/ budowa sieci grawitacyjnej z rur pcv fi 200mm o dg.: 1909,50m (w tym 504,00m na działkach gminnych i 1405,50m na działkach powiatowych):- od studni S51 do studni S68 (ul. Długa i ul. Pl. Św. Jana);- od studni S68 do studni S86 (ulica Lipowa);- od studni S68 do studni S99 (wjazd przy OSP, pl. Św. Jana);- od studni S68 do przepompowni PS2 (ul. Parkowa).2/ budowę przykanalików grawitacyjnych z rur pcv fi 160mm o łącznej długości 608,48m w ilości 77szt (w tym gminne 304,98m – 36szt., oraz powiatowe 303,50m – 41szt.)3/ budowę pompowni PS2 (Qhmax.=20,1m3/h, H=26,0mH20).Odbiorcą przedsięwzięcia będą nie tylko mieszkańcy miejscowości Zębowo, która obecnie nie posiada funkcjonującej kanalizacji sanitarnej ale również mieszkańcy gminy Lwówek oraz Powiatu Nowotomyskiego, którzy dzięki inwestycji w infrastrukturę kanalizacyjną będą mogli cieszyć się czystszym środowiskiem. Beneficjent posiada wszystkie wymagane prawem decyzje / uzgodnienia umożliwiające realizację Przedsięwzięcia oraz zapewniające jego prawną, organizacyjną i finansową wykonalność. Beneficjentami bezpośrednimi Przedsięwzięcia będą mieszkańcy miejscowości Zębowo, którzy dzięki efektom związanym z budową kanalizacji będą mogli cieszyć się czystym i bezpiecznym środowiskiem naturalnym, co jednocześnie wpisuje się w ideę zrównoważonego rozwoju.Produkty projektu to:Długość wybudowanej kanalizacji sanitarnej – 2,51798 km (Polish)
0 references
The subject of the proposed undertaking is the construction of sanitary sewage system in the Lviv Agglomeration included in the IV ACPOŚK 2015 and in the Master Plan under PLWL090.As part of the project carried out in Zębowo, it is planned to build a total of 2.51798 km of sanitary sewage system (1909,5 + 608.48 = 2517.98) together with the pumping room. The detailed scope of the investment is set out below: 1/construction of gravitational net made of 200 mm pcv pipes dg.: 1909.50 m (including 504.00 m on municipal plots and 1405.50 m on district plots):- from well S51 to well S68 (ul. Long and hive. PL It’s St. John. Jan);- from well S68 to well S86 (Leipov street);- from well S68 to well S99 (entry at the OSP, pl. It’s St. John. Jan);- from the well S68 to the PS2 pumping station (ul. 2.The construction of gravitational canals made of 160 mm pcv pipes with a total length of 608.48 m in the amount of 77pcs (including communal 304.98 m – 36pcs, and district 303.50 m – 41pcs.)3/construction of the pumping plant PS2 (Qhmax.=20,1 m³/h, H=26.0mH20). The beneficiary shall have all the decisions/agreements required by law to implement the Undertaking and ensure its legal, organisational and financial feasibility. Direct beneficiaries of the project will be residents of Zębowo, who, thanks to the effects connected with the construction of sewage systems, will be able to enjoy a clean and safe environment, which at the same time fits into the idea of sustainable development.The products of the project are:Length of built sanitary sewage system – 2.51798 km (English)
21 October 2020
0 references
Le projet proposé a pour objet la construction d’un réseau d’assainissement sanitaire dans l’agglomération de Lwówek incluse dans le IV ACP-WWWK 2015 et dans le plan directeur sous le numéro PLWL090.Dans le cadre du projet mis en œuvre à Zębowo, un total de 2,51798 km de réseau d’assainissement sanitaire (1909.5 + 608,48 = 2517,98) est prévu en même temps que la station de pompage. Le champ d’application détaillé de l’investissement est exposé ci-dessous: 1/Construit de réseau de gravitation avec des tuyaux pvc 200 mm à dg.: 1 909,50 m (dont 504,00 m sur les parcelles municipales et 1 405,50 m sur les parcelles de district):- du puits S51 au puits S68 (ul. Longue et longue. PL Jour de la Saint-Jean Jana);- du puits S68 au puits S86 (rue Lipowa);- du puits S68 au puits S99 (entrée à OSP, pl. Jour de la Saint-Jean Jana);- du puits S68 à la station de pompage PS2 (ul. Parkowa).2/construction de canaux gravitationnels à partir de tuyaux en PVC de 160 mm d’une longueur totale de 608,48 m d’une quantité de 77 pcs (y compris communal 304,98 m — 36pcs, et district 303,50 m — 41pcs)3/construction de la station de pompage PS2 (Qhmax.=20,1 m³/h, H=26,0mH20).Le projet sera reçu non seulement par les résidents de Zębowo, qui ne dispose actuellement pas d’un système d’assainissement en état de marche, mais aussi des résidents de la municipalité de Lwówek et du district de Nowytomyski, qui pourront profiter d’un environnement plus propre grâce à l’investissement dans les infrastructures d’égouts. Le bénéficiaire dispose de toutes les décisions/arrangements juridiquement requis permettant la mise en œuvre de l’entreprise et garantissant sa faisabilité juridique, organisationnelle et financière. Les bénéficiaires directs du projet seront les résidents de Zębowo, qui pourront profiter d’un environnement naturel propre et sûr grâce aux effets associés à la construction du réseau d’égouts, qui s’inscrit dans le même temps dans l’idée de développement durable.Produits de la to:Długość du système d’assainissement construit — 2,51798 km (French)
2 December 2021
0 references
Identifiers
RPWP.04.03.01-30-0040/16
0 references