Investments in RES in PHU Katarzyna Zięba (Q131842)

From EU Knowledge Graph
Revision as of 19:26, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): OBJET DU PROJET: Construction de deux installations photovoltaïques sur les terrains de la requérante, dans les lieux d’activités commerciales (11-300 Biskupiec, région d’Olsztyn, voïvodie de Warmińsko-Mazurskie), à savoir: 1. Évêque, Adamowo 5, dz. 133/3 (numéro d’enregistrement des terres: 281402_5.0027.133/3) 2. Évêque, St. 1er mai, 19b, c’est-à-dire: 65/8 (numéro d’enregistrement du sol: 281402_4.0004.65/8) Caractéristiques des deux installa...)
Jump to navigation Jump to search
Project Q131842 in Poland
Language Label Description Also known as
English
Investments in RES in PHU Katarzyna Zięba
Project Q131842 in Poland

    Statements

    0 references
    166,413.42 zloty
    0 references
    39,939.22 Euro
    13 January 2020
    0 references
    195,780.49 zloty
    0 references
    46,987.32 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    6 April 2017
    0 references
    30 September 2020
    0 references
    KATARZYNA ZIĘBA FIRMA PRODUKCYJNO-­HANDLOWO-­USŁUGOWA
    0 references
    0 references

    53°52'7.7"N, 20°57'18.7"E
    0 references
    PRZEDMIOT PROJEKTU: Budowa 2 instalacji fotowoltaicznych na działkach Wnioskodawcy, w lokalizacjach prowadzenia działalności gospodarczej (11-300 Biskupiec, pow. olsztyński, woj. warmińsko-mazurskie), tj.: 1. Biskupiec, Adamowo 5, dz. 133/3 (nr ewidencyjny działki: 281402_5.0027.133/3) 2. Biskupiec, ul. 1-go Maja 19b, dz.: 65/8 (nr ewidencyjny działki: 281402_4.0004.65/8) Charakterystyka obu instalacji: - instalacja fotowoltaiczna o mocy 19,8 kW posadowiona na dachu budynku - panele PV monokrystaliczne 300W w liczbie 66 szt. - instalacja osadzona na konstrukcji stalowej połączonej ze stelażem pod panele PV Zadaniem projektowanych instalacji fotowoltaicznych jest wytworzenie energii elektrycznej o parametrach sieci elektroenergetycznej, a następnie zagospodarowanie jej w wewnętrznej instalacji elektrycznej przez odbiorcę. ETAPY REALIZACJI PROJEKTU: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu SPOSÓB WDRAŻANIA PROJEKTU: - wybór wykonawcy zgodnie z zasadą konkurencyjności - podpisanie umowy z wykonawcą - montaż instalacji - zakończenie projektu, podpisanie protokołu końcowego, płatność końcowa Projekt wpisuje się w założenia wpisane w SzOOP RPO WiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. wnioskodawcy, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność regionu. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
    0 references
    SUBJECT MATTER OF THE PROJECT: Construction of 2 photovoltaic installations on the Applicant’s plots, in locations of conducting business activity (11-300 Biskupiec, Olsztyn, Warmia-Mazurskie voivodship), i.e.: 1. Bishop, Adamowo 5, dz. 133/3 (Evidence No of the plot: 281402_5.0027.133/3) 2. Bishop, ul. May 1st 19b, Dz.: 65/8 (Evidence No of the plot: 281402_4.0004.65/8) Characteristics of both installations: — 19.8 kW photovoltaic installation located on the roof of a building – PV monocrystalline panels 300 W in the number of 66 pieces. — installation embedded on a steel structure connected to a frame for PV panels The task of the designed photovoltaic installations is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. STAGES OF PROJECT IMPLEMENTATION: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of the work according to the planned timetable – completion of the project and signing of the final protocol – final settlement of the project REPORT OF PROJECT: — selection of the contractor in accordance with the principle of competitiveness – signing of the contract with the contractor – installation installation – completion of the project, signing of the final protocol, final payment The project fits into the assumptions entered in the SzOOP RPO WiM fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the applicant’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase regional competitiveness. As a result of the investment, energy consumption costs will fall (English)
    21 October 2020
    0 references
    OBJET DU PROJET: Construction de deux installations photovoltaïques sur les terrains de la requérante, dans les lieux d’activités commerciales (11-300 Biskupiec, région d’Olsztyn, voïvodie de Warmińsko-Mazurskie), à savoir: 1. Évêque, Adamowo 5, dz. 133/3 (numéro d’enregistrement des terres: 281402_5.0027.133/3) 2. Évêque, St. 1er mai, 19b, c’est-à-dire: 65/8 (numéro d’enregistrement du sol: 281402_4.0004.65/8) Caractéristiques des deux installations: — installation photovoltaïque d’une puissance de 19,8 kW sur le toit du bâtiment — panneaux PV monocristallin 300 W dans le nombre de 66 pièces. — installation encastrée sur une structure en acier reliée à un cadre pour panneaux photovoltaïques La tâche des installations photovoltaïques prévues est de produire de l’électricité avec les paramètres du réseau électrique, puis de l’installer dans l’installation électrique interne par le client. ÉTAPES DE LA MISE EN ŒUVRE DU PROJET: — présentation d’une demande de financement — signature de la convention de subvention — sélection du contractant selon le principe de compétitivité — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final du projet PROJECT PROVISIONS: — sélection du contractant selon le principe de compétitivité — signature d’un contrat avec le contractant — installation d’installation — achèvement du projet, signature du protocole final, paiement final Le projet est conforme aux hypothèses figurant dans le SzOOP ROP WiM afin d’atteindre l’objectif de: Augmentation de la part des SER dans le bilan énergétique global de la région. La mise en œuvre de la sous-mesure augmentera la part des énergies renouvelables dans le bilan énergétique du candidat, ce qui augmentera la part des énergies renouvelables dans le bilan énergétique. La région. Cela permettra de réduire les émissions de gaz et de poussières nocifs dans l’atmosphère et d’accroître la compétitivité de la région grâce à l’utilisation de sources d’énergie renouvelables locales. À la suite de l’investissement, les coûts associés à la consommation d’énergie diminueront (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0226/17
    0 references