Revision as of 19:26, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La plantation suppose la construction d’une installation photovoltaïque pour la production d’électricité, ainsi que l’infrastructure technique nécessaire, sur une partie de la parcelle 73 de Surbajny. La puissance installée prévue de la centrale ne dépassera pas 0,5 MW. La superficie maximale du bâtiment ne doit pas dépasser 1 ha. En outre, le service de transport du site d’investissement sera effectué au moyen d’une sortie de la route municipal...)
Jump to navigation Jump to search
Project Q131832 in Poland
Language Label Description Also known as
English
Construction of Surbay photovoltaic terrestrial installations up to 0,5 MW
Project Q131832 in Poland

    Statements

    0 references
    1,354,227.78 zloty
    0 references
    325,014.67 Euro
    13 January 2020
    0 references
    1,692,784.73 zloty
    0 references
    406,268.34 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 March 2019
    0 references
    31 December 2019
    0 references
    FIRMA PRODUKCYJNO HANDLOWO USŁUGOWA CZYSZEK MIROSŁAW
    0 references
    0 references

    53°50'45.2"N, 19°36'22.0"E
    0 references
    Przedsiewzięcie zakłada wybudowania na części działki 73 obręb Surbajny, gm.Zalewo instalacji fotowoltaicznej do wytwarzania energii elektrycznej wraz z towarzyszącą niezbędną infrastrukturą techniczną. Planowana moc zainstalowana elektowni nie przekroczy 0,5 MW. Maksymalna powierzchnia zabudowy nie przekroczy 1 ha. Dodatkowo zostanie wykonana obsługa komunikacyjna terenu inwestycji, zrealizowana za pomocą zjazdu z drogi gminnej na działce nr 72, obręb Surbajny(wydatek niekwalifikowalny).Przedsięwzięcie realizowane będzie na dz. nr 72 i 73 w obrębie Surbajny,gm.Zalewo.Instalacja fotowoltaiczna zamontowana zostanie na gruncie należącym do Wnioskodawcy.(współwłasność)W skład danej instalacji będzie wchodzić 1612 szt. paneli o mocy 310W każy. Zadaniem projektowanej instalacji fotowoltaicznej jest wytworzenie energii elektrycznej o odpowiednich parametrach a następnie dostarczenie jej do istniejącej sieci elektroenergetycznej.Projekt przyczyni się do zwiększenia udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu poprzez budowę infrastruktury do wytwarzania i dystrybucji energii pochodzącej ze źródeł odnawialnych.Realizacja przebiegnie jednoetapowo w ciągu 1 roku od podpisania umowy o dofinansowanie.Pr.wpisuje się w założenia określ.w SzOOP RPO WiM 2014-20.Zg.z war.określonymi w SzOOP RPO WiM 2014-20 dofinans.mogą otrzymać pr.polegające na bud.,rozbud.oraz przebudowie infrastr.(w tym zakup niezbędnych urządzeń)mające na celu prod.energii elektr.i/lub cieplnej z OZE.Pr.przyczynia się do rozwiąz.wszystkich probl.kluczowych interesariuszy w obszarze obj.proj.Projekt umożliwi osiągniecie wielu pozytywnych aspektów środowiskowych zarówno w kategoriach lokalnych, regionalnych i krajowych oraz w wymiarze globalnym.Inwestor posiada pozwolenie na budowę (decyzja nr 363/2017 z dnia 20.06.2017r.)Projekt będzie wdrażany przez Wnioskodawcę i osoby z nim współpracujące. (Polish)
    0 references
    The project assumes the construction of the Surbajny region on the part of plot 73, the basin of photovoltaic installation for the production of electricity together with the necessary technical infrastructure. The planned installed power plant shall not exceed 0,5 MW. The maximum area of construction shall not exceed 1 hectares. In addition, the communication service of the investment area will be carried out by means of a exit from the communal road on plot No. 72, Surbajny area (ineligible expenditure).The undertaking will be carried out on the number 72 and 73 within Surbajny,gm.Left.The photovoltaic installation will be installed on the ground belonging to the Applicant.(co-ownership)In the composition of the given installation, 1612 pieces will be included. The project will contribute to increase the share of renewable energy in the overall energy balance of the region through the construction of infrastructure for the production and distribution of energy coming from renewable sources.The implementation will run one-stage within a period of 1 year from the signing of the contract for funding.Pr. is included in the assumption. in the budget of the RPOM 2014-20. (English)
    21 October 2020
    0 references
    La plantation suppose la construction d’une installation photovoltaïque pour la production d’électricité, ainsi que l’infrastructure technique nécessaire, sur une partie de la parcelle 73 de Surbajny. La puissance installée prévue de la centrale ne dépassera pas 0,5 MW. La superficie maximale du bâtiment ne doit pas dépasser 1 ha. En outre, le service de transport du site d’investissement sera effectué au moyen d’une sortie de la route municipale sur le terrain no 72, zone de Surbajny (dépenses non admissibles).Le projet sera réalisé à la jonction nos 72 et 73 à l’intérieur de Surbajna,gm.Zalewo.L’installation photovoltaïque sera installée sur le terrain appartenant à la requérante.(copropriété)L’installation sera composée de 1612 panneaux d’une puissance de 310 W chacun. La tâche de l’installation photovoltaïque prévue est de produire de l’électricité avec les paramètres appropriés et ensuite de la livrer au réseau électrique existant. Le projet contribuera à augmenter la part des sources d’énergie renouvelables dans le bilan énergétique global de la région par la construction d’infrastructures pour la production et la distribution d’énergie à partir de sources renouvelables.La mise en œuvre aura lieu en une étape dans un délai d’un an à compter de la signature de l’accord de cofinancement.Pr. est inclus dans les hypothèses spécifiées dans le SzOOP ROP WiM 2014-20.En relation avec la construction du projet, le projet travaillera dans la construction du projet et le développement d’infrastr. dans le but de l’acheter. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0211/17
    0 references