Photovoltaic installation at HMT (Q131822)

From EU Knowledge Graph
Revision as of 19:25, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Demandeur HMT — Abrasive MATERIALS S.C. Czerwiński Rudnicki prévoit un projet intitulé. Installation photovoltaïque chez HMT. Il s’agit d’une micro-installation d’une capacité de 39,9 kWp. L’énergie que le système produira au cours de l’année est de 37,91 MWh. Les émissions de CO2 évitées seront de 13,18 tonnes/an. Localisation du projet — Mrągowo, ul. Industriel 8 dz. 9/49, 11-700 Mrągowo No Terrain: 281001_1.0007.9/49 Le projet prévu vise à ré...)
Jump to navigation Jump to search
Project Q131822 in Poland
Language Label Description Also known as
English
Photovoltaic installation at HMT
Project Q131822 in Poland

    Statements

    0 references
    168,045.0 zloty
    0 references
    40,330.80 Euro
    13 January 2020
    0 references
    197,700.0 zloty
    0 references
    47,448.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 May 2017
    0 references
    30 June 2020
    0 references
    HMT - MATERIAŁY ŚCIERNE S.C. CZERWIŃSKI RUDNICKI
    0 references
    0 references

    53°52'7.0"N, 21°18'18.7"E
    0 references
    Wnioskodawca HMT - MATERIAŁY ŚCIERNE S.C. Czerwiński Rudnicki planuje przedsięwzięcie pt. Instalacja fotowoltaiczna w firmie HMT . Jest to mikro instalacja o mocy 39,9 kWp. Energia jaką wyprodukuje system w ciągu roku to 37,91 MWh. Emisja CO2 jakiej uda się uniknąć wyniesie 13,18 ton/rok. Lokalizacja przedsięwzięcia - Mrągowo, ul. Przemysłowa 8 dz. 9/49, 11-700 Mrągowo Nr ewid. działki: 281001_1.0007.9/49 Planowane przedsięwzięcie ma na celu obniżenie kosztów funkcjonowania obiektu przez zakup i montaż instalacji fotowoltaicznej. W celu wykorzystania en. słonecznej do wytwarzania en. elektrycznej, przewiduje się budowę instalacji fotowoltaicznej na dachu. Charakterystyka urządzeń które zostaną zamontowane: - Panele PV monokrystaliczne 300W w ilości 133 szt. - Instalacja zostanie osadzona na konstr. stalowej połączoną ze stelażem pod panele PV na dachu budynku. Biznes plan do inwestycji został wykonany w II iIII kwartale 2017 r. Natomiast zakup urządzeń oraz montaż instalacji przewidziany jest na I i II kwartał 2020 r. Projekt w pełni przyczyni się do realizacji celu głównego i celów szczegółowych RPO WiM Osi priorytetowej 4 działania 4.1: zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu. W wyniku inwestycji powstanie instalacja fotowoltaiczna o mocy 39,9 kWp, która poprzez zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym Wnioskodawcy, zwiększy udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu. (Polish)
    0 references
    Applicant HMT – Abrasive MATERIAŁY S.C. Czerwiński Rudnicki plans a project titled. Photovoltaic installation at HMT. It is a micro installation with a power of 39.9 kWp. The energy that the system will produce in a year is 37.91 MWh. The avoidable CO2 emissions will be 13.18 tonnes/year. Location of the project – Mrągowo, ul. Industrial 8 dz. 9/49, 11-700 Mrągowo Nr. plots: 281001_1.0007.9/49 The planned project aims to reduce the costs of operation of the facility by purchasing and installing a photovoltaic installation. In order to use the solar en. for electricity generation, the construction of a photovoltaic plant on the roof is envisaged. Characteristics of devices to be installed: — PV monocrystalline panels 300 W in the amount of 133 pieces. — The installation will be placed on a steel constraint connected to the frame under PV panels on the roof of the building. The business plan for the investment was carried out in the second and third quarters of 2017. However, the purchase of equipment and installation is planned for the first and second quarters of 2020. The project will fully contribute to the achievement of the main objective and specific objectives of the WiM priority axis 4 action 4.1: increased share of renewable energy sources in the overall energy balance of the region. The investment will result in a photovoltaic installation with a capacity of 39.9 kWp, which, through an increased share of renewable energy sources in the overall energy balance of the Applicant, will increase the share of renewable energy sources in the overall energy balance of the region. (English)
    21 October 2020
    0 references
    Demandeur HMT — Abrasive MATERIALS S.C. Czerwiński Rudnicki prévoit un projet intitulé. Installation photovoltaïque chez HMT. Il s’agit d’une micro-installation d’une capacité de 39,9 kWp. L’énergie que le système produira au cours de l’année est de 37,91 MWh. Les émissions de CO2 évitées seront de 13,18 tonnes/an. Localisation du projet — Mrągowo, ul. Industriel 8 dz. 9/49, 11-700 Mrągowo No Terrain: 281001_1.0007.9/49 Le projet prévu vise à réduire les coûts d’exploitation de l’installation en achetant et en installant une installation photovoltaïque. Afin d’utiliser l’ensemble solaire pour la production d’un ensemble électrique, la construction d’une installation photovoltaïque sur le toit est envisagée. Caractéristiques des dispositifs à monter: — Panneaux photovoltaïques monocristallins 300 W dans la quantité de 133 pcs. — L’installation sera montée sur un profil en acier relié à un cadre pour panneaux PV sur le toit du bâtiment. Le plan d’entreprise pour l’investissement a été mis en œuvre au cours des 2e et 3e trimestres de 2017. Toutefois, l’achat d’équipements et l’installation de l’installation sont prévus pour le premier et le deuxième trimestres 2020. Le projet contribuera pleinement à la réalisation de l’objectif principal et des objectifs spécifiques de l’axe prioritaire 4 du ROP WiM de l’action 4.1: augmentation de la part des sources d’énergie renouvelables dans le bilan énergétique global de la région. L’investissement se traduira par une installation photovoltaïque de 39,9 kWp qui, en augmentant la part des sources d’énergie renouvelables dans le bilan énergétique global de la requérante, augmentera la part des sources d’énergie renouvelables dans le bilan énergétique global de la région. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0192/17
    0 references