Project Q3151418 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Sustainable Urban Mobility Plan and Implementation of Improvement Actions |
Project Q3151418 in Spain |
Statements
466,666.66 Euro
0 references
583,333.33 Euro
0 references
80.0 percent
0 references
25 September 2018
0 references
31 December 2021
0 references
AYUNTAMIENTO DE AVILES
0 references
33004
0 references
En el marco de esta operación se propone la elaboración del Plan de movilidad urbana sostenible y ejecución de medidas de mejora señaladas como necesarias en las zonas del ámbito de la estrategia DUSI, entre las que cabe señalar las siguientes actuaciones recogidas en la_x000D_ tabla. Estas operaciones están incluidas en el borrador del PMUS para su ejecución, aunque por la situación ocurrida desde que se decretó el estado de alarma, no se ha realizado información ni proceso de participación ciudadana previo a su aprobación inicial. Se prevé que al PMUS le queda aún un año de tramitación, lo que no impide que se sigan ejecutando ya las medidas que_x000D_ contiene, algunas ya realizadas en otros ámbitos al concluir el periodo de confinamiento para favorecer el transporte público, y el tránsito peatonal y de vehículos no contaminantes frente a los vehículos privados. _x000D_ MEDIDAS ESTRATÉGICAS: _x000D_ _RESTRICCIONES DE CIRCULACIÓN (nuevas vías peatonales) _MEDIDAS DE CALMADO DE TRÁFICO _x000D_ _ADECUACIÓN DE ITINERARIOS PEATONALES _x000D_ _MEJORA DE SEGURIDAD VIAL EN CRUCES _x000D_ _DESARROLLO DE LA INFRAESTRUCTURA CICLISTA _x000D_ _ACCESIBILIDAD _x000D_ _INSTALACIÓN DE NUEVOS PUNTOS DE PRÉSTAMO Y APARCAMIENTO DE BICICLETAS _x000D_ _ACTUACIONES EN EL TRANSPORTE PÚBLICO _x000D_ _MEDIDAS DE DESCONGESTIÓN (entre otras) (Spanish)
0 references
Within the framework of this operation, it is proposed to draw up the Sustainable Urban Mobility Plan and to implement improvement measures identified as necessary in the areas covered by the DUSI strategy, including the following actions set out in the_x000D_ table. These operations are included in the draft SUMP for implementation, although due to the situation since the state of alarm was decreed, no information or citizen participation process has been carried out prior to its initial approval. It is expected that the SUMP will still have one year of processing, which does not prevent the continuation of the measures that_x000D_ contains, some already carried out in other areas at the end of the confinement period to favour public transport, and the transit of pedestrians and clean vehicles over private vehicles. _x000D_ STRATEGIC measures: _x000D_ _CIRCULATION RESTRICTIONS (new pedestrian pathways) _Traffic calming measures _x000D_ _PEathon ITINERARY ADECUATION _x000D_ _VIAL SECURITY MEASURE IN CRUCTS _x000D_ _CICLIST INFRASTRUCTURE DEVELOPMENT _x000D_ _ACCESSIBILITY _x000D_ _INSTALATION OF NEW PRESS POINTS AND BICICLET APPLICATION _x000D_ _ACTUATIONS IN THE PUBLIC TRANSPORT _x000D_ _Decongestion measures (among others) (English)
12 October 2021
0 references
Dans le cadre de cette opération, il est proposé d’élaborer le plan de mobilité urbaine durable et de mettre en œuvre les mesures d’amélioration jugées nécessaires dans les domaines couverts par la stratégie DUSI, y compris les actions suivantes figurant dans le tableau_x000D_. Ces opérations sont incluses dans le projet de PMUD pour mise en œuvre, bien qu’en raison de la situation depuis que l’état d’alarme a été décrété, aucun processus d’information ou de participation citoyenne n’a été mené avant son approbation initiale. On s’attend à ce que le PMUD dispose encore d’un an de traitement, ce qui n’empêche pas la poursuite des mesures que contient_x000D_, certaines déjà réalisées dans d’autres zones à la fin de la période de confinement pour favoriser les transports publics, et le transit des piétons et des véhicules propres par rapport aux véhicules privés. _x000D_mesures stratégiques: _x000D_ _Restrictions de la CIRCULATION (nouveaux sentiers piétonniers) _mesures d’apaisement de la circulation _x000D_ _ADÉCATION ITINERAIRE PÉathon _x000D_ _MEASURE DE SÉCURITÉ VIALE EN CRUCTS _x000D_ _DÉVELOPPEMENT D’INFRASTRUCTURE CICLISTE _x000D_ _ACCESSIBILITÉ _x000D_ _INSTALATION de NOUVELLES POINTS DE PRESSE ET D’APPLICATION DE BICICLET _x000D_ _ACTUATIONS DANS LE TRANSPORT PUBLIQUE _x000D_ _Mesures de décongestion (entre autres) (French)
2 December 2021
0 references
Avilés
0 references
Identifiers
FCL01AS0218
0 references