Revision as of 15:43, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project activities are aimed at the realisation of investments to expand the capacity of an existing business facility and increase the energy efficiency in Euroquwarz — MV OOD, Pleven. In accordance with the recommendations of the energy efficiency audit, 2 measures are planned for implementation, which will be implemented on the site operated by the Candidate — ballastier located in Cherkovitsa village, municipality. Nikopol:- Measure 1: R...)
Jump to navigation Jump to search
Project Q3856888 in Bulgaria
Language Label Description Also known as
English
Implementation of energy efficiency measures in Euroquarts — MV Ltd., Pleven
Project Q3856888 in Bulgaria

    Statements

    0 references
    514,523.18 Bulgarian lev
    0 references
    262,406.82 Euro
    1 December 2021
    0 references
    857,887.68 Bulgarian lev
    0 references
    437,522.72 Euro
    1 December 2021
    0 references
    0.6 percent
    0 references
    21 August 2017
    0 references
    19 September 2018
    0 references
    0 references
    Дейностите по проекта са насочени към реализирането на инвестиции за разширяване на капацитета на съществуващ стопански обект и повишаване на енергийната ефективност в Еврокварц – МВ ООД, гр. Плевен. В съответствие с препоръките от извършеното обследване за енергийна ефективност, се предвиждат за изпълнение 2 мерки, които ще се реализират на обекта, експлоатиран от Кандидата - баластиера, находяща се в с. Черковица, общ. Никопол:- Мярка 1: Подмяна на челен товарач - Мярка 2: Подмяна на верижен булдозерПряк резултат от реализираните дейности по проекта ще бъде редуциране обема на разходената енергия за производствени нужди с 654614 kWh/год. и постигнат фактор на енергийни спестявания (ESR) 71,36%. За осигуряване на устойчивост в постигнатите високи резултати по отношение редуциране разхода на енергия за производствени нужди, компанията планира да въведе система за енергиен мениджмънт, съгласно стандарт БДС EN ISO 50001.Основните резултати от изпълнението на посочените дейности са свързани с намаляване на консумацията на енергия, потребявана за производствената дейност на Еврокварц – МВ ООД, гр. Плевен. В количествено изражение резултатите от изпълнението на енергоспетяващите мерки включват:- Спестяване емисии на CO2: 174,78 т/год;- Постигнат фактор на енергийни спестявания (ESR) общо: 71,36%- Планирани енергийни спестявания за предприятието в резултат от изпълнението на проекта (ПЕС): 24,34 %;- Годишни спестявания на енергия от препоръчания в енергийния одит пакет мерки (ГС): 654614 kWh/год. (Bulgarian)
    0 references
    The project activities are aimed at the realisation of investments to expand the capacity of an existing business facility and increase the energy efficiency in Euroquwarz — MV OOD, Pleven. In accordance with the recommendations of the energy efficiency audit, 2 measures are planned for implementation, which will be implemented on the site operated by the Candidate — ballastier located in Cherkovitsa village, municipality. Nikopol:- Measure 1: Replacement of front loader — Measure 2: The result of the project activities will be to reduce the volume of energy consumed for production by 654 614 kWh/year and achieve an energy savings factor (ESR) of 71.36 %. In order to ensure sustainability in the achieved high results in terms of reducing energy consumption for production needs, the company plans to introduce an energy management system according to standard BDS EN ISO 50001.The main results of the implementation of these activities are related to the reduction of the energy consumption consumed for the production activity of Eurokwartz — MV Ltd., Pleven. In quantitative terms, the results of the implementation of energy-saving measures include:- Saving CO2 emissions: 174.78 t/year;- Energy savings factor (ESR) achieved in total: 71.36 %- Planned energy savings for the enterprise as a result of the implementation of the project (PES): 24.34 %;- Annual energy savings from the measures recommended in the energy audit package (SG): 654 614 kWh/year (English)