Construction of biodegradable waste treatment facilities at Stage II – equipment and specialised machinery (Q132477)
Jump to navigation
Jump to search
Project Q132477 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of biodegradable waste treatment facilities at Stage II – equipment and specialised machinery |
Project Q132477 in Poland |
Statements
2,206,422.76 zloty
0 references
3,152,032.52 zloty
0 references
70.0 percent
0 references
30 April 2018
0 references
31 December 2019
0 references
DBAJ MARTA PRYCHODKO
0 references
Planowane przedsięw. dot. odzysku i recyklingu odpad. biodegradowalnych w region. instalacji do przetw. odpadów komunalnych w Świętajnie w Reg. Centr. wg podziału w WPGO. Inwestycja zlokal.jest na działce ewid.oznacz. o nr 77/1, obr.0014 Świętajno. Na jej terenie znajdują się już obiekty związane z działal. Wnioskodawcy. Planowane przedsięw. polegać będzie na zakupie specjalist. sprzętu do prowadzenia efektywnej gospodarki odpadami w zakresie odzysku i recyklingu odpad. biodegradowalnych. Przetwarz. odpad. prowadz. będzie w instalacji do kompost. komunal. osadów ściekow. oraz bioodpadów, w której wytwarzany będzie produkt w postaci granulatu o właściwościach nawozowych, prowadzonej w technologii VAL’ID, wyposażona w zamknięty system odprowadz. odcieków. Projekt zakł. wyłącznie zakup specjalist. urządzeń niezbęd. do prowadz. działal. podstaw. Ma więc charak. nieinfrastrukturalny. W ramach przedsięw. przewiduje się: zakup środk.trw.-maszyn i urządzeń do prowadz. i optymaliz. procesów odzysku i recyklingu odpad. bio, w separator frakcji organicznej, ciągnik rolniczy, przerzucarka ciągnikowa. Będzie możliwe: efektywniejsze przetwarz. bioodpadów. W efekcie nastąpi poprawa jakości kompostu i zwiększenie możliwości przetwarz. różnych rodzajów bioodpadów. Do przetwarz. będą wykorzyst. bioodpady w ilości do 1.000Mg/rok. Projekt wpisuje się w cel temat. 6 Zach. i ochr. środow. przyrodn. oraz wspier. efektyw. gospod. zasobami, Prior inwest. 6a - Inwest.w sektor gosp. odpad. celem wypełn. zobowiązań określ.w dorobku praw.Unii w zakresie środ. oraz zaspok. wykraczaj. poza te zobowiąz. potrzeb inwest., określ. przez państ. członk. SzOOP RPO WiM Dz.5.1 Gosp. odpad. Wskaźniki: rezult.: Moc przer. zakł. zagospod. odpadów [Mg/rok] - 1000Mg/rok; prod: Licz. wspartych zakł. zagospod. odpadów [szt.]-1szt. (Polish)
0 references
Planned waste recovery and recycling. biodegradable in the region. municipal waste processing installations at Christmas in Reg. Centers by division in WPGO. The investment from the local.is on the plot of the register of the number no. 77/1, r.0014 Swiejno. There are already facilities related to the operation in its territory. The applicants. The planned project will consist of the purchase of specialist equipment for efficient waste management in the field of recovery and recycling of waste. biodegradable. Process waste. guide. will be in the installation for compost. communal sludges and bio-waste, in which the product will be produced in the form of granules with fertilising properties, carried out in VAL’ID technology, equipped with a closed drainage system. The project was exclusively purchased by specialists. equipment needed to lead. operation. basics. So it has a charak. non-infrastructure. Within the framework of the undertaking, the following shall be envisaged: purchase of middle.tw.-machinery and equipment to guide. and optimise. waste recovery and recycling processes. bio, organic fraction separator, agricultural tractor, tractor flipper. It will be possible: more efficient processing of bio-waste. As a result, the quality of compost will be improved and the possibility of processing of different types of bio-waste will be increased. Bio-waste up to 1.000Mg/year will be used for processing. The project fits in with the objective of the subject. 6 Zach. and Ochr. on Wednesday. nature and support for resource efficiency, Prior Investment. 6a – Invest.in the waste sector. in order to complete the commitments set out in the acquis of the Union in the field of Wednesday and the fulfilment go beyond those obligations of investment needs, as defined by the member. SzOOP RPO WiM OJ 5.1 Gosp. waste. Indicators: the result.: Work power back on waste [Mg/year] – 1000Mg/year; prod: Number of supported wastes [pc.]-1pcs. (English)
21 October 2020
0 references
Projet de valorisation et de recyclage des déchets biodégradables dans la région. station municipale de traitement des déchets à Świętajno w Reg. Centr. par division au sein du WPGO. L’investissement est situé sur un terrain numéro 77/1, r.0014 Noël. Sur son territoire, il y a déjà des objets associés à l’opération. Demandeurs. Le projet envisagé consistera en l’achat d’un équipement spécialisé pour une gestion efficace des déchets dans le domaine de la valorisation et du recyclage des déchets. biodégradable. Le traitement des déchets. le guide sera dans l’usine de compostage municipal. boues d’épuration et biodéchets, dans lesquels le produit sous forme de granulés avec propriétés fertilisantes, réalisé selon la technologie VAL’ID, sera produit, équipé d’un système de drainage fermé. Le projet n’implique que l’achat d’un spécialiste. dispositifs nécessaires pour guider. travaillés. bases. Donc, ce n’est pas infrastructurel. Le projet prévoit: achat de moyens.trw.-machine et équipement pour guides. et optimisation. processus de récupération et de recyclage des déchets. bio, dans séparateur de fraction organique, tracteur agricole, tracteur. Il sera possible de: traitement plus efficace des biodéchets. En conséquence, la qualité du compost sera améliorée et les possibilités de traitement de divers types de biodéchets seront améliorées. Les biodéchets jusqu’à 1000Mg/an seront utilisés pour le traitement. Le projet s’inscrit dans l’objectif du sujet. 6 Zach. et mercredi, ainsi que le soutien aux effets des ressources, Investissements préalables. 6 bis — Investir dans le secteur des déchets. Afin de remplir les obligations qui lui incombent en vertu de l’acquis.L’Union dans le domaine du centre et de la disposition va au-delà de ces obligations d’investissement, telles que définies par le membre. SZOOP RPO WiM Dz.5.1 Déchets de Gosp. Indicateurs: résultat: Production de déchets [Mg/an] — 1000Mg/an; prod: Nombre d’articles pris en charge de déchets [pcs.]-1 pcs. (French)
2 December 2021
0 references
Identifiers
RPWM.05.01.00-28-0013/18
0 references