Investment in RES in MEBELMAX (Q132101)

From EU Knowledge Graph
Revision as of 12:20, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La requérante envisage de réaliser un investissement consistant en l’installation de panneaux photovoltaïques dans l’infrastructure de l’usine de production de Barcikowo, commune de Dobre Miasto. Il existe un système photovoltaïque d’une puissance nominale de 40 kWp (composé de 125 modules monocristallins d’une puissance unitaire de 320 W), relié au réseau de distribution directement à une installation électrique à basse tension triphasée. L’ens...)
Jump to navigation Jump to search
Project Q132101 in Poland
Language Label Description Also known as
English
Investment in RES in MEBELMAX
Project Q132101 in Poland

    Statements

    0 references
    181,330.57 zloty
    0 references
    43,519.34 Euro
    13 January 2020
    0 references
    213,330.08 zloty
    0 references
    51,199.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 September 2016
    0 references
    31 October 2018
    0 references
    MEBELMAX - MIECZYSŁAW JASIŃSKI
    0 references
    0 references

    53°59'12.8"N, 20°23'50.3"E
    0 references
    Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w infrastrukturze zakładu produkcyjnego w miejscowości Barcikowo gmina Dobre Miasto. Przewidziano system fotowoltaiczny o mocy znamionowej 40 kWp (składający się z 125 szt. modułów monokrystalicznych o mocy jednostkowej 320W), podłączony do sieci dystrybucyjnej bezpośrednio do trójfazowej instalacji elektr. niskiego napięcia. Całość instalacji będzie posadowiona na dachu budynku produkcyjnego i będzie stanowiła integralną część obiektu, określana jako instalacja nadachowa. Przyłączenie do sieci odbywa się na podstawie zgłoszenia do danego operatora sieci w tym przypadku Energa Operator. Zgodnie z ustawą przyłączenie mikro-instalacji fotowoltaicznej do mocy i włącznie 40 kWp do sieci jest w obowiązku każdego operatora i nie wymaga pozwolenia na budowę. Etapy realizacji projektu:  - złożenie wniosku o do?nansowanie  - podpisanie umowy o do?nansowanie  - wybór wykonawcy zgodnie z zasadą konkurencyjności  - zawarcie umowy z wykonawcą i rozpoczęcie prac  - realizacja prac zgodnie z założonym harmonogramem  - zakończenie projektu i podpisanie protokołu końcowego  - końcowe rozliczenie projektu  Sposób wdrażania: -postępowanie konk. i podpisanie umowy -montaż instalacji -odbiór instalacji -rozliczenie - f-ra końcowa, prot. potw. wskaźniki Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energet. regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane ze zużyciem energii. (Polish)
    0 references
    The applicant plans to carry out an investment involving installation of photovoltaic panels in the infrastructure of the production plant in Barcikowo commune Dobre Miasto. A photovoltaic system with rated power of 40 kWp (consisting of 125 units of monocrystalline modules with a unit power of 320 W), connected to a distribution network directly to a three-phase low voltage electrical system is provided. The entire installation will be planted on the roof of the production building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation:— submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project Method of implementation: —conclusion and contract signing -assembly of the installation -receipt of the installation – settlement – final f-ra, table of indicators The project is inscribed in the assumptions entered in the Polish SzOOP by fulfilling the objective of:Increased share of RES in the overall energy balance of the region.The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance.It’s a region.This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company.The cost of energy consumption will fall as a result of the investment. (English)
    21 October 2020
    0 references
    La requérante envisage de réaliser un investissement consistant en l’installation de panneaux photovoltaïques dans l’infrastructure de l’usine de production de Barcikowo, commune de Dobre Miasto. Il existe un système photovoltaïque d’une puissance nominale de 40 kWp (composé de 125 modules monocristallins d’une puissance unitaire de 320 W), relié au réseau de distribution directement à une installation électrique à basse tension triphasée. L’ensemble de l’installation sera situé sur le toit du bâtiment de production et fera partie intégrante de l’installation, appelée installation aérienne. La connexion au réseau est basée sur une notification à l’opérateur de réseau respectif dans le cas présent Energa Operator. En vertu de la loi, le raccordement d’installations micro-voltaïques jusqu’à 40 kWp au réseau est obligatoire pour chaque opérateur et ne nécessite pas de permis de construire. Étapes de la mise en œuvre du projet:  — Présentation d’une demande de financement — signature de la convention de subvention — sélection du contractant conformément au principe de compétitivité — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final du projet Méthode de mise en œuvre: —procédures et signature du contrat -installation -réception d’installations — établissement — final — f-ra., Prot. potw. Indicateurs Le projet s’inscrit dans les hypothèses inscrites dans le RPOW SzOOP aux fins: Augmentation de la part des SER dans le bilan énergétique global de la région. La mise en œuvre de la sous-mesure augmentera la part des énergies renouvelables dans le bilan de l’entreprise, ce qui augmentera la part des énergies renouvelables dans le bilan énergétique. La région. Cela permettra de réduire les émissions de gaz et de poussières nocifs dans l’atmosphère et d’accroître la compétitivité de l’utilisation des sources d’énergie renouvelables locales. À la suite de l’investissement, les coûts associés à la consommation d’énergie diminueront. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0563/16
    0 references