Improving energy efficiency in the company D.C.M, Sp. z o.o. through the thermal modernisation of the upholstery hall and the administrative and social building and modernisation of the production and assembly of furniture bodies. (Q132199)

From EU Knowledge Graph
Revision as of 12:20, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la thermomodernisation du bâtiment d’ameublement avec les installations administratives et sociales (l’isolation des cloisons extérieures des pièces chauffées ainsi que le remplacement de la menuiserie des fenêtres et des portes des cloisons transparentes extérieures et la modernisation de l’éclairage intégré dans le bâtiment) et la modernisation du processus de production des carrosseries de meubles. L’investissement conce...)
Jump to navigation Jump to search
Project Q132199 in Poland
Language Label Description Also known as
English
Improving energy efficiency in the company D.C.M, Sp. z o.o. through the thermal modernisation of the upholstery hall and the administrative and social building and modernisation of the production and assembly of furniture bodies.
Project Q132199 in Poland

    Statements

    0 references
    1,677,513.47 zloty
    0 references
    402,603.23 Euro
    13 January 2020
    0 references
    2,309,670.2 zloty
    0 references
    554,320.85 Euro
    13 January 2020
    0 references
    72.63 percent
    0 references
    24 January 2018
    0 references
    31 December 2019
    0 references
    D.C.M. SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°44'57.1"N, 21°20'28.3"E
    0 references
    Przedmiotem projektu jest termomodernizacja budynku hali tapicerni wraz z zapleczem administracyjno-socjalnym (docieplenie przegród zewnętrznych części ogrzewanych wraz z wymianą stolarki okiennej i drzwiowej zewnętrznych przegród przezroczystych oraz modernizacja oświetlenia wbudowanego w budynku) oraz modernizacja procesu produkcji korpusów meblowych. Inwestycja dotyczy działek nr 174/2, 174/3 i 174/4 w miejscowości Piecki, pod adresem ul. Zwycięstwa 32/14. Niniejszy projekt wpisuje się w założenia określone w SzOOP RPO WiM dla Osi priorytetowej 4 Efektywność energetyczna dla działania 4.2. Inwestycja dotyczy głębokiej, kompleksowej modernizacji energetycznej budynku należącego do Wnioskodawcy wraz z modernizacją linii produkcyjnych produkcji korpusów meblowych wraz z wymianą istniejących energochłonnych urządzeń na nowe z wykorzystaniem pilarki optymalizującej oraz centrum wiertarskim o lepszych parametrach technicznych wraz ze ograniczeniem systemu zmianowego produkcji z: 2 zmian po 8 godzin do jednej zmiany 8 godzin pracy na hali produkcyjnej. Wnioskodawca należy do MŚP, przed przystąpieniem do złożenia wniosku zostały opracowane audyty energetyczne, w którym pokazany został zestaw działań w przedsiębiorstwie zwiększający jego efektywność energetyczną. Projekt będzie realizowany w okresie od I kw 2018 r do IV kw 2019 r. Dzięki realizacji inwestycji efektywność energetyczna w przedsiębiorstwie wzrośnie o 34,92 %, natomiast redukcja CO2 do atmosfery wyniesie 66,10%. Wnioskodawca posiada pełną zdolność realizacyjną do prawidłowej realizacji projektu zgodnie z zapisami kryteriów w tym zakresie. (Polish)
    0 references
    The subject of the project is the thermal modernisation of the building of the upholstery hall with administrative and social facilities (warming of the outer partitions heated together with the replacement of window and door carpentry of external transparent bulkheads and modernisation of built-in lighting in the building) and modernisation of the production process of furniture bodies. The investment concerns plots no. 174/2, 174/3 and 174/4 in Piecki, at ul. Wins 32/14. This project fits into the assumptions set out in the WiM ROP for Priority Axis 4 Energy Efficiency for Action 4.2. The investment concerns a deep, comprehensive energy modernisation of the building belonging to the Applicant together with the modernisation of the production lines of furniture body production, together with the replacement of existing energy-intensive equipment with the use of an optimisation saw and a drilling centre with better technical parameters, with the limitation of the changing system of production from: 2 changes after 8 hours to one shift 8 hours working in the production hall. The applicant belongs to SMEs, prior to the submission of the application, energy audits were developed, in which a set of activities in an undertaking increasing its energy efficiency was presented. The project will be implemented in the period from the first quarter of 2018 to the fourth quarter of 2019. Thanks to the investment, energy efficiency in the company will increase by 34.92 % and the reduction of CO2 to the atmosphere will amount to 66.10 %. The applicant shall have the full capacity to carry out the project correctly in accordance with the criteria in this respect. (English)
    21 October 2020
    0 references
    L’objet du projet est la thermomodernisation du bâtiment d’ameublement avec les installations administratives et sociales (l’isolation des cloisons extérieures des pièces chauffées ainsi que le remplacement de la menuiserie des fenêtres et des portes des cloisons transparentes extérieures et la modernisation de l’éclairage intégré dans le bâtiment) et la modernisation du processus de production des carrosseries de meubles. L’investissement concerne les parcelles nos 174/2, 174/3 et 174/4 à Piecki, à ul. Victoire 32/14. Ce projet est conforme aux hypothèses énoncées dans la norme SzOOP ROP WiM pour l’axe prioritaire 4 Efficacité énergétique pour la mesure 4.2. L’investissement concerne une modernisation énergétique approfondie et complète du bâtiment appartenant à la requérante, ainsi que la modernisation des lignes de production des carrosseries de meubles, ainsi que le remplacement des équipements à forte intensité énergétique par l’utilisation d’une scie d’optimisation et d’un centre de forage avec de meilleurs paramètres techniques, ainsi que la réduction du système de production en mutation: 2 quarts après 8 heures à un quart 8 heures de travail dans le hall de production. Le demandeur appartient à une PME et des audits énergétiques ont été réalisés avant la présentation de la demande, montrant un ensemble d’actions dans l’entreprise visant à améliorer son efficacité énergétique. Le projet sera mis en œuvre au cours de la période allant du premier trimestre 2018 au quatrième trimestre 2019. Grâce à l’investissement, l’efficacité énergétique de l’entreprise augmentera de 34,92 %, tandis que la réduction du CO2 dans l’atmosphère atteindra 66,10 %. Le demandeur doit avoir la pleine capacité de mettre en œuvre le projet correctement conformément aux critères à cet égard. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.02.00-28-0057/18
    0 references