Improving energy efficiency in the company BONA PLUS SP. Z O.O. LIMITED PARTNERSHIP (Q132198)

From EU Knowledge Graph
Revision as of 12:20, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet a pour objet les travaux thermomodernes du bâtiment Kętrzyńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (avant la ventilation 123/87), 123/139 123/140 (avant la ventilation 123/86). Murs extérieurs (Styrop.-?=0,040W/m*K,1496,4 m²) — mur du sous-sol (Styrop-?=0,040W/m*K, 183,8 m²) — mur extérieur près du sol (Styrop.-?=0,040W/m*K, 523,6 m²) -stropodes (min. de laine,?=0,037W/m*K, 318,0 m², styropape avec pâte asflat, 0,040 W/m*K,1...)
Jump to navigation Jump to search
Project Q132198 in Poland
Language Label Description Also known as
English
Improving energy efficiency in the company BONA PLUS SP. Z O.O. LIMITED PARTNERSHIP
Project Q132198 in Poland

    Statements

    0 references
    723,638.35 zloty
    0 references
    173,673.20 Euro
    13 January 2020
    0 references
    890,303.09 zloty
    0 references
    213,672.74 Euro
    13 January 2020
    0 references
    81.28 percent
    0 references
    6 July 2015
    0 references
    30 September 2019
    0 references
    BONA PLUS SP Z O O SPÓŁKA KOMANDYTOWA
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu są prac termomod. w budynku-Kętrzyńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (przed podziałem 123/87), 123/139 123/140 (przed podziałem 123/86). zakres: -Ściany zewn.(płyty styrop.-?=0,040W/m*K,1496,4m2) -ściany zewn. piwnicy (płyty styrop.-?=0,040W/m*K, 183,8m2) - ściana zewn. przy gruncie (płyty styrop.-?=0,040W/m*K, 523,6m2) -stropodach (wełna min.,?=0,037W/m*K,318,0m2, styropapa z papą asflatową, 0,040W/m*K,1041,9m2, płyt styrop.) -Strop pod nieogrzewanym poddaszem (płyt wełny min., ?=0,037W/m*K,446,5m2) -Strop nad nieogrzewaną piwnicą (płyt styrop,0,040W/m*K,1342,7m2) -Częściowa wymiana okien na bardziej szczelne i energooszczędne (współczynnik przenikania ciepła U?0,90 [W/m2*K] (WT2021), 5,2m2)-5 szt. -Modernizacja systemu went. pośrednio realizowana poprzez wymianę stolarki okiennej i drzwiowej. -panele fotowoltaiczne (105 szt. paneli 310 W każdy) Szczegółowy opis i zakres zawarto w audycie energetycznym i dok techn. Etapy realizacji projektu: -złożenie wniosku -podpisanie umowy -wybór wykonawcy zgodnie z zasadą konk. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z harm. -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie Projekt w pełni wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększona efektywność energet. w przedsiębiorstwach. Przedmiotowa inwestycja zmierza do poprawy efekt. przedsiębiorstwa. Prace przewidziane w ramach inwestycji wpisują się w typy projektów przewidzianych do realizacji oraz realizują założone do realizacji wskaźniki. Efektywność energet. (EE) leży u podstaw europejskiej polityki energet. i jest jednym z głównych celów strategii „Europa 2020” na rzecz inteligentnego, zrównoważonego wzrostu sprzyjającego włączeniu społecznemu.Efektywne zużycie energii może znacząco przyczynić się do osiągnięcia celu w postaci gosp.i niskoemisyjnej i walki ze zmianami klimatycznymi. Inwestycja na rzecz efekt (Polish)
    0 references
    The subject of the project is the work of thermomoods in the building-Kętrzyńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (before division 123/87), 123/139 123/140 (before the division of 123/86). scope: (523 sq.m) (syrop-?=0.040W/m*K,1496,4 m²) – the outer wall of the cellar (syrop-?=0.040W/m*K, 183.8 m²) – the outer wall at the ground (syrop, 1342,0,037 ft) above,040W/m*K, 523.6 m²)-stropods (wool min.,?=0,037W/m) —Modernisation of the ventilation system. indirectly implemented through the replacement of window and door carpentry. — photovoltaic panels (105 panels 310 W each) Detailed description and scope are included in the energy audit and techn dock. Stages of project implementation: —submission of the application – signing of the contract – selection of the contractor in accordance with the principle of conclusion. —conclusion of contract with the contractor and commencement of work -implementation of works according to harm. —completing the project and signing the final protocol -final settlement The project fully fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased efficiency of energet. in enterprises. This investment aims to improve the effect of the company. The work planned in the framework of the investment fits into the types of projects planned for implementation and implements the indicators set for implementation. The efficiency of the energet. (EE) is at the heart of European energy policy and is one of the main objectives of the Europe 2020 strategy for smart, sustainable and inclusive growth.Efficient energy consumption can make a significant contribution to achieving the goal of gosp. and low carbon and combating climate change. Investment for effect (English)
    21 October 2020
    0 references
    Le projet a pour objet les travaux thermomodernes du bâtiment Kętrzyńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (avant la ventilation 123/87), 123/139 123/140 (avant la ventilation 123/86). Murs extérieurs (Styrop.-?=0,040W/m*K,1496,4 m²) — mur du sous-sol (Styrop-?=0,040W/m*K, 183,8 m²) — mur extérieur près du sol (Styrop.-?=0,040W/m*K, 523,6 m²) -stropodes (min. de laine,?=0,037W/m*K, 318,0 m², styropape avec pâte asflat, 0,040 W/m*K,1041,9 m², plaques en mousse de styromousse) -Arrêter sous un grenier non chauffé (plaque de laine min.,?=0,0 37 W/m*K, 446,5 m²) -Remplacement partiel des fenêtres par des fenêtres plus serrées et plus économes en énergie (coefficient de transfert de chaleur U?0,90 [W/m²*K] (WT2021), 5,2 m²)-5 pièces. —Modernisation du système de ventilation indirectement effectuée par remplacement de menuiseries de fenêtres et de portes. — panneaux photovoltaïques (105 panneaux 310 W chacun) Description détaillée et portée sont incluses dans l’audit énergétique et le quai technologique. Étapes de la mise en œuvre du projet: —présentation de la demande — signature du contrat -choix du contractant conformément au principe de conc. —conclusion du contrat avec l’entrepreneur et début des travaux — exécution des travaux en fonction du préjudice. — achèvement du projet et signature du rapport final -le règlement final Le projet est pleinement conforme aux hypothèses figurant dans le RPOW SzOOP aux fins: Amélioration de l’efficacité énergétique dans les entreprises. L’investissement en question vise à améliorer l’effet de l’entreprise. Les travaux prévus au titre de l’investissement font partie des types de projets à réaliser et mettent en œuvre les indicateurs fixés pour la mise en œuvre. Efficacité énergétique. (EE) est au cœur de la politique énergétique européenne et est l’un des principaux objectifs de la stratégie Europe 2020 pour une croissance intelligente, durable et inclusive.Une utilisation efficace de l’énergie peut contribuer de manière significative à la réalisation de l’objectif de réduction des émissions de carbone et de changement climatique. Investissement pour effet (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.02.00-28-0057/17