Increase the energy efficiency of the building in Bartoszyce by the company Construction Materials Hurt-Detail Arkadiusz Gołombiewski together with the use of renewable energy sources. (Q132162)

From EU Knowledge Graph
Revision as of 12:17, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’investissement couvert par ce projet consiste en une thermomodernisation complète du bâtiment ainsi que le remplacement d’une source de chaleur pour une pompe à chaleur air-eau et la mise en place d’une installation photovoltaïque pour la production d’électricité à Bartoszyce, ul. Przemysłowa 22, sur le terrain no 104/25, zone 008. Le projet vise à améliorer l’état du bâtiment dans le cadre suivant: —Échange d’éclairage existant dans le bâtime...)
Jump to navigation Jump to search
Project Q132162 in Poland
Language Label Description Also known as
English
Increase the energy efficiency of the building in Bartoszyce by the company Construction Materials Hurt-Detail Arkadiusz Gołombiewski together with the use of renewable energy sources.
Project Q132162 in Poland

    Statements

    0 references
    539,860.5 zloty
    0 references
    129,566.52 Euro
    13 January 2020
    0 references
    635,130.0 zloty
    0 references
    152,431.2 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 June 2018
    0 references
    31 December 2019
    0 references
    MATERIAŁY BUDOWLANE HURT-DETAL ARKADIUSZ GOŁOMBIEWSKI
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Inwestycja objęta niniejszym projektem polega na kompleksowej termomodernizacji budynku wraz z wymianą źródła ciepła na pompę ciepła typu powietrze-woda i wdrożeniem instalacji fotowoltaicznej do produkcji energii elektrycznej w miejscowości Bartoszyce przy ulicy Przemysłowej 22,na działce nr 104/25 obręb 008. W ramach przedsięwzięcia zakłada się usprawnienie stanu budynku w następującym zakresie: -Wymiana istniejącego oświetlenia w budynku na nowe w energooszczędnej technologii LED, -Ocieplenie dachu nad częścią magazynową bryły B, -Wymiana wszystkich istniejących drzwi zewnętrznych i bram,pomieszczeń handlowych bryły A oraz Bryły B na nowe częściowo przeszklone, -Wymiana źródła ciepła na pompę ciepła typu powietrze-woda o mocy 58,5 kW, która będzie źródłem wiodącym. W istniejącej kotłowni zamontować nowy kocioł elektryczny o mocy 72 kW jako źródło szczytowe, bufor ciepła oraz automatykę sterującą pracą, dodatkowo należy wymienić instalację grzewczą, grzejniki, piony w instalacji c.o. Układ wyposażyć w liczniki energii z pomp ciepła i całego systemu grzewczego, -Ocieplenie stropu poddasza nad częścią handlową bryły A, -Wymiana istniejących okien i witryn, -Ocieplenie ścian podłużnych i szczytowych S6 i S9 bryły A i B, -Docieplenie ściany wewnętrznej oznaczonej, jako SW1 oddzielającej budynek magazynowy od budynku przyległego nieobjętego projektem od strony zachodniej, -Wyposażenie budynku w instalację fotowoltaiczną o mocy 39,44 kWp umieszczoną na dachu budynku. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP oraz wpisuje się w założenia SzOOP poprzez realizację działań zmierzających do poprawy bezpieczeństwa energetycznego województwa w-m. Dzięki inwestycji Przedsiębiorstwo przejdzie na gospodarkę niskoemisyjną, co jest celem tematycznym 4 działania oraz zwiększy efektywność energetyczną budynku-cel szczegółowy działania. Wykonana termomodernizacja zabezpieczy budynek przed utratą ciepła, zmniejszy zapotrzebowanie na energię i jej zużycie. (Polish)
    0 references
    The investment covered by this project consists of a comprehensive thermomodernisation of the building together with the replacement of the heat source with an air-water heat pump and the implementation of a photovoltaic installation for the production of electricity in Bartoszyce, ul. Przemysłowa 22, on plot No. 104/25 of area 008. The project envisages improving the condition of the building in the following scope: —Exchange of existing lighting in the building for new ones in energy-saving LED technology, -Roof warming over the warehouse part B, – Replacement of all existing external doors and gates, commercial spaces of lump A and B for new partially glazed, -Replacement of heat source to air-water heat pump with a power of 58.5 kW, which will be the leading source. In the existing boiler room, mount a new electric boiler with a power of 72 kW as a peak source, heat buffer and automation of work, in addition the heating system, radiators, verticals in the central installation.The system is equipped with energy meters from the heat pumps and the entire heating system, -The interior wall of the building is enclosed in the attic ceiling of the building above the commercial part of the building, -Replacement of existing windows and windows, -House of longitudinal walls and panels. The project meets all the shore conditions specified in the SzOOP and fits into the assumptions of the SzOOP through the implementation of actions aimed at improving energy security of the voivodship. Thanks to the investment, the company will move to a low carbon economy, which is the thematic objective of 4 actions and will increase the energy efficiency of the building-a detailed objective of the operation. The thermal modernisation will protect the building against heat loss, reduce energy demand and consumption. (English)
    21 October 2020
    0 references
    L’investissement couvert par ce projet consiste en une thermomodernisation complète du bâtiment ainsi que le remplacement d’une source de chaleur pour une pompe à chaleur air-eau et la mise en place d’une installation photovoltaïque pour la production d’électricité à Bartoszyce, ul. Przemysłowa 22, sur le terrain no 104/25, zone 008. Le projet vise à améliorer l’état du bâtiment dans le cadre suivant: —Échange d’éclairage existant dans le bâtiment avec une nouvelle technologie LED économe en énergie, -Réchauffage de toit sur la partie de stockage de la carrosserie B, -Remplacement de toutes les portes et portails extérieurs existants, espaces commerciaux des solides A et Srills B avec de nouveaux vitrages partiellement vitrés, -Remplacement de la source de chaleur pour pompe à chaleur air-eau d’une puissance de 58,5 kW, qui sera la première source. Dans la chaufferie existante installer une nouvelle chaudière électrique d’une puissance de 72 kW comme source de pointe, tampon de chaleur et contrôle automatique de fonctionnement, en outre, remplacer le système de chauffage, radiateurs, plomberie dans le système de chauffage central. Le système équipe les compteurs d’énergie des pompes à chaleur et de l’ensemble du système de chauffage, -armer le grenier de plafond au-dessus de la partie commerciale de la carrosserie A, -Remplacement des fenêtres et fenêtres existantes, -réchauffement des parois longitudinales et des pics des caisses S6 et S9 A et B, -L’isolation du mur intérieur désigné comme SW1 séparant le bâtiment de l’entrepôt du bâtiment adjacent non couvert par le projet du côté ouest, -Équipement du bâtiment avec une installation photovoltaïque de 39,44 kWp installée sur le toit du bâtiment. Le projet répond à toutes les conditions limites fixées dans SzOOP et est conforme aux hypothèses du SzOOP en mettant en œuvre des actions visant à améliorer la sécurité énergétique de la région. Grâce à l’investissement, l’entreprise passera à une économie à faible intensité de carbone, qui est un objectif thématique de 4 actions et augmentera l’efficacité énergétique du bâtiment — l’objectif spécifique de l’action. La thermomodernisation protégera le bâtiment contre les pertes de chaleur, réduira la demande et la consommation d’énergie. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.02.00-28-0028/18
    0 references