Energy efficiency at CENTRAL BOLKAN RSYKING EOOD (Q3834263)

From EU Knowledge Graph
Revision as of 11:55, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): “Central BOLKAN RSYKING” Ltd. is a private company with main activity recycling of all types of waste cables (copper, aluminum and composite). The project envisages the purchase of modern equipment characterised by significantly lower energy consumption per unit of output and higher productivity than currently existing. Thus, the implementation of the project will directly contribute to achieving high energy efficiency by the company, its sustai...)
Jump to navigation Jump to search
Project Q3834263 in Bulgaria
Language Label Description Also known as
English
Energy efficiency at CENTRAL BOLKAN RSYKING EOOD
Project Q3834263 in Bulgaria

    Statements

    0 references
    240,426.75 Bulgarian lev
    0 references
    122,617.64 Euro
    1 December 2021
    0 references
    394,950.0 Bulgarian lev
    0 references
    201,424.5 Euro
    1 December 2021
    0 references
    0.61 percent
    0 references
    9 August 2017
    0 references
    18 April 2019
    0 references
    0 references
    “ЦЕНТРАЛ БОЛКАН РИСАЙКЛИНГ“ ЕООД е частна компания с основен предмет на дейност рециклиране на всички видове отпадъчни кабели (медни, алуминиеви и композитни). Проектът предвижда закупуване на съвременно оборудване, което се характеризира със значително по-ниско енергийно потребление за единица продукция и по-голяма производителност в сравнение със съществуващото в момента. По този начин, реализацията на проекта пряко ще допринесе за постигане на висока енергийна ефективност от дружеството, нейното устойчиво възходящо развитие и повишена конкурентоспособност. Също така, ще доведе до значително понижение на енергопотреблението и намаляване на оперативните експлоатационни разходи на производствената база.Прилагането на енергоспестяващи производствени технологии ще допринесе и за устойчиво екологично развитие и намаляване на негативното въздействие върху околната среда.Тъй като рециклирането се извършва с неефективна инсталация, потребяваща значителна електроенергия, стратегическа цел на настоящия проект е постигане на оптимално енергийно потребление чрез изпълнение на следните дейности:1. Извършване на енергийно обследване;2. Оптимизиране енергийното потребление на цялото производство чрез внедряване и сертифициране по БДС EN ISO 50 001 за енергиен мениджмънт;3. Модернизация на производствените мощности за повишаване производствения капацитет и намаляване на производствените разходи чрез внедряване на високо-технологично и енергоефективно оборудване за производство за рециклиране на кабели, чрез закупуване на ново оборудване.Всички дейности по този проект ще доведат до намаляване на потреблението на електроенергия за произвеждането на единица продукция, както и на вредните емисии на СО2. Реализацията на дейностите по проекта ще повишат конкурентоспособността и ефективността на производството и ще направят възможно разширяването на производствения капацитет на фирмата, без да се променя из основи базисния производствен процес. (Bulgarian)
    0 references
    “Central BOLKAN RSYKING” Ltd. is a private company with main activity recycling of all types of waste cables (copper, aluminum and composite). The project envisages the purchase of modern equipment characterised by significantly lower energy consumption per unit of output and higher productivity than currently existing. Thus, the implementation of the project will directly contribute to achieving high energy efficiency by the company, its sustainable upward development and increased competitiveness. It will also lead to a significant reduction in energy consumption and a reduction in the operating costs of the production base. The application of energy-saving production technologies will also contribute to sustainable environmental development and reduce the negative impact on the environment. Since recycling is carried out with an inefficient installation consuming significant electricity, a strategic goal of this project is to achieve optimal energy consumption through the implementation of the following activities:1. Carrying out an energy audit;2. Optimisation of the energy consumption of all production through implementation and certification according to BDS EN ISO 50 001 for energy management;3. Modernisation of production capacity to increase production capacity and reduce production costs by introducing high-tech and energy efficient equipment for cable recycling, by purchasing new equipment.All activities under this project will lead to a reduction in the electricity consumption for the production of a unit of production, as well as the harmful CO2 emissions. The realisation of the project activities will increase the competitiveness and efficiency of the production and will make it possible to expand the production capacity of the company without fundamentally changing the basic production process. (English)
    2 December 2021
    0 references
    Троян
    0 references

    Identifiers

    BG16RFOP002-3.001-0938