Increase the energy efficiency and expand the capacity to provide construction services to Comfort BG 2 EOOD through the implementation of new equipment and equipment. (Q3832978)
Jump to navigation
Jump to search
Project Q3832978 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase the energy efficiency and expand the capacity to provide construction services to Comfort BG 2 EOOD through the implementation of new equipment and equipment. |
Project Q3832978 in Bulgaria |
Statements
151,266.85 Bulgarian lev
0 references
251,290.0 Bulgarian lev
0 references
0.6 percent
0 references
29 January 2018
0 references
22 January 2019
0 references
Настоящото проектно предложение планира закупуване на нова техника и оборудване за предоставяне на строителни услуги, представени и описна като мерки за енергийна ефективност в енергийния одит към проекта, както следва: Мярка 1 - Комбиниран багер-товарач - 1 бр.; Мярка 2 - Мини челен товарач - 1 бр. и Мярка 3 - Автоматизирана система управление на енергопотреблението - 2 бр. Доставката и пускането в експлоатация на новата техника и оборудване по проекта ще доведе до енергийни спестявания в размер на 38,75%, фактор на енергийни спестявания 56,7% и разширяване капацитета за предоставяне на строителни услуги средно с 38%, съгласно Приложение Б - Енергиен одит. Това прави инвестицията рентабилна с норма на възвращаемост (IRR) 18,64% и срок на откупуване 5,19 години, съгласно Приложение Б1 по настоящата процедура за кандидатстване. В допълнение успешното реализиране на настоящия проект ще допринесе за опазване на околната среда и смекчаване на последиците от изменението на климата, в следствие на спестени 36 tСО2/год. и рециклиране на строителни отпадъци и суровини.Ползите и ефекта за всяка една от предвидените енергоспестяващи мерки са подробно описани в Приложение Б - Енергиен одит. (Bulgarian)
0 references
This project proposal plans the purchase of new equipment and equipment for the provision of construction services, presented and described as energy efficiency measures in the project’s energy audit, as follows: Measure 1 — Combined excavator — 1; Measure 2 — Mini-front loader — 1 and Measure 3 — Automated system management of energy consumption — 2 supplies and commissioning of new equipment and equipment under the project will result in energy savings of 38.75 %, energy savings factor 56.7 % and expansion of capacity for provision of construction services by an average of 38 %, according to Annex B — Energy audit. This makes the investment profitable with a rate of return (IRR) of 18.64 % and a redemption period of 5.19 years, in accordance with Annex B1 to this application procedure. In addition, the successful implementation of this project will contribute to environmental protection and climate change mitigation as a result of saved 36 tCO2/year and recycling of construction waste and raw materials. The benefits and effects of each of the envisaged energy saving measures are detailed in Annex B — Energy Audit. (English)
2 December 2021
0 references
Бургас
0 references
Identifiers
BG16RFOP002-3.001-0930
0 references