Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage OOD, Pernik (Q3834373)

From EU Knowledge Graph
Revision as of 11:47, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Scope of the works for construction and reconstruction of the WSS infrastructure: agglomeration Pernik Reconstruction and construction of water supply lines — 14.3 kmPexabilitation of 1 PS; Construction of 3 new water bodies; Rehabilitation and construction of sewerage network — 29.870 km and 1 816 SCOs; Reconstruction of WWTP BatanovtsiAgglomeration Radomir: Transit water pipeline for low zone — 2.2 km;Construction of distribution network — 9.9...)
Jump to navigation Jump to search
Project Q3834373 in Bulgaria
Language Label Description Also known as
English
Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage OOD, Pernik
Project Q3834373 in Bulgaria

    Statements

    0 references
    64,246,981.3 Bulgarian lev
    0 references
    32,765,960.46 Euro
    1 December 2021
    0 references
    84,085,753.57 Bulgarian lev
    0 references
    42,883,734.32 Euro
    1 December 2021
    0 references
    0.76 percent
    0 references
    5 September 2019
    0 references
    5 March 2024
    0 references
    0 references
    0 references
    Обхват на дейностите за изграждане и реконструкция на ВиК инфраструктурата:Агломерация ПерникРеконструкция и изграждане на довеждащи водопроводи – 14,3 kmРехабилитация на 1 бр. ПС;Изграждане на 3 бр. нови водоеми;Рехабилитация и изграждане на канализационна мрежа – 29, 870 km и 1 816 бр. СКО;Реконструкция на ПСОВ БатановциАгломерация Радомир:Транзитен водопровод за ниска зона - 2,2 km;Изграждане на разпределителна мрежа – 9,96 km и 624 бр. СВО;Рехабилитация и изграждане на канализационна мрежа – 6,77 km и 411 бр. СКО;Изграждане на КПС1 кв. „Върба“ и КПС2 гр. Радомир;Изграждане на тласкател от КПС1, кв. „Върба“ до КПС2 гр.Радомир;Изграждане на тласкател от КПС2 до ПСОВ Батановци.По данни от РПИП в резултат от инвестициите във водоснабдителните мрежи на агломерации Перник и Радомир загубите на вода ще намалеят с 2 775 914 м3 (892 224 м3 за Радомир и 1 883 690 м3 за Перник). Ще се осигури непрекъснатост на водоподаването. Предвидено е рехабилитация на 21,79 километра водопроводна мрежа и изграждане на 3,08 километра нова. Старата водопроводна мрежа на ВиК ООД – гр.Перник е с дължина 1459 километра, като след проекта ще стане 1462 километра.Предвидено е рехабилитация на 8,065 километра канализационна мрежа и изграждане на 27,905 километра нова. Изградената канализационна мрежа е с дължина 301 километра и след проекта ще достигне дължина 329 километра. В резултат на инвестицията към канализационната мрежа ще се присъединят нови 8 009 човека за 2023 година от агломерации Перник и Радомир, като свързаността ще достигне 99,4% и 99,6%.В резултат на проекта към услугата „пречистване на отпадъчни води“ ще се присъединят към 2023 година 17 876 човека от агломерации Перник и Радомир. Предвижда се изграждане на тласкател и нова помпена станция, като свързаността ще достигне съответно 99,4% и 99,6% за двете агломерации. С цел постигане на съответствие с Директивата за отпадъчни води, ще се изградят съоръжения за пречистване на азот и фосфор. (Bulgarian)
    0 references
    Scope of the works for construction and reconstruction of the WSS infrastructure: agglomeration Pernik Reconstruction and construction of water supply lines — 14.3 kmPexabilitation of 1 PS; Construction of 3 new water bodies; Rehabilitation and construction of sewerage network — 29.870 km and 1 816 SCOs; Reconstruction of WWTP BatanovtsiAgglomeration Radomir: Transit water pipeline for low zone — 2.2 km;Construction of distribution network — 9.96 km and 624 SVO; Rehabilitation and construction of sewerage network — 6.77 km and 411 SCOs; Construction of KPS1 sq. “Verba” and KPS2 Radomir;Building a pusher from KPS1, sq. Construction of a pusher from KPS2 to Batanovtsi WWTP. According to data from the LIPP as a result of investments in the water supply networks of the agglomerations of Pernik and Radomir water losses will decrease by 2 775 914 m³ (892 224 m³ for Radomir and 1 883 690 m³ for Pernik). Continuity of the water supply will be ensured. The rehabilitation of 21.79 km of water supply network and the construction of 3.08 km of new ones are planned. The old water supply network of WSS Ltd. — Pernik has a length of 1 459 km and after the project will become 1 462 km. Rehabilitation of 8.065 km of sewerage network and construction of 27.905 km of new ones is foreseen. The built sewerage network is 301 km long and after the project will reach a length of 329 kilometers. As a result of the investment, 8 009 new people will join the sewerage network for 2023 from the agglomerations Pernik and Radomir, as connectivity will reach 99.4 % and 99.6 %. As a result of the project, the “waste water treatment” service will join in 2023 year 17 876 people from the agglomerations of Pernik and Radomir. The construction of a pusher and a new pumping station is foreseen, with connectivity reaching 99.4 % and 99.6 % respectively for both agglomerations. In order to comply with the Waste Water Directive, nitrogen and phosphorus treatment plants will be built. (English)
    2 December 2021
    0 references
    Перник
    0 references

    Identifiers

    BG16M1OP002-1.016-0004
    0 references