Implementation of measures to improve reliability, awareness and implementation of the balance and optimisation of operation in the ENERGO KD local distribution system (Q18632)

From EU Knowledge Graph
Revision as of 11:21, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q18632 in Czech Republic
Language Label Description Also known as
English
Implementation of measures to improve reliability, awareness and implementation of the balance and optimisation of operation in the ENERGO KD local distribution system
Project Q18632 in Czech Republic

    Statements

    0 references
    4,178,851.44 Czech koruna
    0 references
    167,154.06 Euro
    10 January 2020
    0 references
    10,447,128.6 Czech koruna
    0 references
    417,885.14 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    30 September 2017
    0 references
    15 June 2021
    0 references
    ENERGO KD s.r.o.
    0 references
    0 references

    49°56'3.62"N, 14°1'33.82"E
    0 references
    26701
    0 references
    V rámci projektu bude implementován celý komplex opatření implementace inteligentních prvků v lokální distribuční soustavě ENERGO KD. Hlavními oblastmi implementace jsou vybudování nového datového bilančního centra navázaného na inteligentní systém měření s doplněním o mnoho dalších technologických funkcionalit. Druhou významnou oblastí je modernizace dispečerského a operativního řízení soustavy, které je doplněno o nové dálkově řízené spínací a monitorovací prvky. a. (Czech)
    0 references
    Within the project, the entire complex of measures to implement intelligent elements in the local ENERGO KD distribution system will be implemented. The main areas of implementation are the construction of a new data balance centre linked to an intelligent measuring system, supplementing many other technological functionalities. The second important area is modernisation of dispatch and operational system management, which is complemented by new remote controlled switching and monitoring elements. a. (English)
    22 October 2020
    0 references
    Dans le cadre du projet, l’ensemble des mesures pour la mise en œuvre d’éléments intelligents dans le système de distribution local ENERGO KD sera mis en œuvre. Les principaux domaines de mise en œuvre sont la construction d’un nouveau centre de bilan de données relié à un système de mesure intelligent, complété par de nombreuses autres fonctionnalités technologiques. Le deuxième domaine important est la modernisation de l’expédition et de la gestion opérationnelle du système, complétée par de nouveaux éléments de commutation et de surveillance télécommandés. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.01.3.12/0.0/0.0/16_062/0011432
    0 references