Improving energy efficiency using renewable energy sources of facilities of the Health Care Team – District Hospital in Pińczów (Q127657)

From EU Knowledge Graph
Revision as of 11:17, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La mise en œuvre du projet implique d’améliorer l’efficacité de l’énerget. 5 bâtiments publics dans lesquels des activités médicales sont menées dans le cadre de l’équipe de soins de santé de Pińczów. L’intervention est conforme à l’objectif CT.4,axis3; priorité d’investissement 4c RPOWŚ 2014-2020.Les activités sont conformes au PGN Pińczów et aux municipalités. RELATIONS PUBLIQUES Revitalisation de la municipalité de Pińczów pour les années 201...)
Jump to navigation Jump to search
Project Q127657 in Poland
Language Label Description Also known as
English
Improving energy efficiency using renewable energy sources of facilities of the Health Care Team – District Hospital in Pińczów
Project Q127657 in Poland

    Statements

    0 references
    4,144,598.31 zloty
    0 references
    994,703.59 Euro
    13 January 2020
    0 references
    4,875,998.01 zloty
    0 references
    1,170,239.52 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    31 December 2021
    0 references
    POWIAT PIŃCZOWSKI
    0 references
    Realizacja projektu obejmuje poprawę efektywności energet. 5-ciu budynkach użyteczn. publicznej, w których prowadzona jest działalność lecznicza w ramach Zespołu Opieki Zdrowotnej w Pińczowie. Interwencja wpisuje się w cel CT.4,oś3 ; priorytet inwestycyjny 4c RPOWŚ 2014-2020.Działania są zgodne z PGN gm. Pińczów oraz Gmin. Pr. Rewitalizacji Gm. Pińczów na lata 2015-2022. Projekt obejmuje modernizację: instalacji: c.o., c.w.u, ocieplenie stropodachów, ścian zewn., wymianę stolarki okiennej i drzwiowej, modernizację instalacji wentylacji, wymianę oświetlenia, zastosowanie systemu zarządzania energią. W wyniku realizacji szacowany spadek emisji gazów cieplarnianych obiektów o powierz. 9782,40 m2, wyniesie 341,57 tony równoważnika CO2/rok a zmniejszenie zużycia energii pierwotnej w/w budynkach wyniesie 1577921,67 kWh/rok łącznie. Zmniejszenie zużycia energii końcowej 3859,40 GJ/rok łącznie. Elementem projektu jest instalacja fotowoltaiczna obejmująca 140 paneli zamontowanych na budynkach objętych projektem. Średnioroczna ilość wyprodukowanej energii z ogniw fotowoltaicznych–36,12 MWhe. Działania te spowodują osiągnięcie efektu ekonom. w postaci oszczędności w zakresie kosztów energii elektr. i cieplnej w wartości 124393,37 rocznie. W wyniku realizacji oszczędność energii elektr. wyniesie - 173,70 MWh/rok, a cieplnej - 3104,10 GJ/rok. W ramach projektu zrealizowano prace przygotowawcze (audyt energetyczny, program funkcjonalno-użytkowy, studium wykonalności (I kwartał 2018). Elementem są też: świadczenie usług inspektora nadzoru nad pracami budowlanymi oraz obowiązkowe działania inform. i promocyjne i wykonanie audytu ex-post. Wnioskodawca posiada prawo dysponowania nieruchomością na cele budowlane. Uzyskanie pozwolenia na budowę będzie obowiązkiem Wykonawcy, wybranego w przetargu nieograniczonym-realizacja prac budowl. w formule "zaprojektuj i wybuduj".Projekt zakłada montaż wyłącznie nowych, nieużywanych elementów. Zakończenie projektu: 31.12.2021. (Polish)
    0 references
    The implementation of the project includes improving the efficiency of the energet. 5 public buildings in which medical activities are carried out within the framework of the Health Care Team in Pińczów. The intervention shall be in line with objective CT.4, axis3; investment priority 4c RPOWŚ 2014-2020.The activities are compatible with PGN of Pińczów and Municipalities. It’s a PR. Revitalisation of the Pińczów Municipality for the years 2015-2022. The project includes the modernisation of: installation: C.O., hot water, warming of stropodache, external walls, replacement of window and door carpentry, modernisation of ventilation system, replacement of lighting, use of energy management system. As a result of the implementation, the estimated reduction in greenhouse gas emissions of the plants by entrustment. 9782.40 m², will be 341.57 tonnes of CO2 equivalent per year and the primary energy consumption of these buildings will be 1577921.67 kWh/year in total. Reduction of final energy consumption of 3859,40 GJ/year in total. Part of the project is a photovoltaic installation comprising 140 panels mounted on the buildings covered by the project. Average annual amount of energy produced from photovoltaic cells-36.12 MWhe. These measures will result in an economising effect in the form of savings in electricity and heat costs of 124393.37 per year. As a result, electricity savings will be – 173.70 MWh/year and heat – 3104.10 GJ/year. The project carried out preparatory work (energy audit, functional-use programme, feasibility study (I quarter 2018). The following elements are also: provision of the services of the inspector of the supervision of construction works as well as mandatory information and promotional activities and ex-post auditing. The applicant has the right to dispose of the property for construction purposes. Obtaining a construction permit will be the duty of the Contractor, selected in the tender, unlimited-implementation of construction works.In the formula “design and build”.The project assumes the assembly of only new, unused elements. Completion of the project: 31.12.2021. (English)
    21 October 2020
    0 references
    La mise en œuvre du projet implique d’améliorer l’efficacité de l’énerget. 5 bâtiments publics dans lesquels des activités médicales sont menées dans le cadre de l’équipe de soins de santé de Pińczów. L’intervention est conforme à l’objectif CT.4,axis3; priorité d’investissement 4c RPOWŚ 2014-2020.Les activités sont conformes au PGN Pińczów et aux municipalités. RELATIONS PUBLIQUES Revitalisation de la municipalité de Pińczów pour les années 2015-2022. Le projet comprend la modernisation de: installation: c.o., c.w., réchauffement des planchers, murs extérieurs, remplacement de la menuiserie des fenêtres et des portes, modernisation des systèmes de ventilation, remplacement de l’éclairage, application d’un système de gestion de l’énergie. À la suite de la mise en œuvre, la baisse estimée des émissions de gaz à effet de serre des installations confiées à l’entreprise. 9 782,40 m², soit 341,57 tonnes d’équivalent CO2/an et la réduction de la consommation d’énergie primaire dans les bâtiments sera de 1 577 921,67 kWh/an au total. Réduction de la consommation finale d’énergie 3859,40 GJ/an combiné. Le projet consiste en une installation photovoltaïque comprenant 140 panneaux installés sur les bâtiments couverts par le projet. Quantité annuelle moyenne d’énergie produite à partir de cellules photovoltaïques — 36,12 MWhe. Ces mesures permettront de réaliser des économies de 124393,37 par an en termes de coût de l’électricité et de l’énergie thermique. Grâce à la mise en œuvre, les économies d’énergie de l’électricité seront de — 173,70 MWh/an, et les économies d’énergie thermique seront de 3104,10 GJ/an. Le projet a réalisé des travaux préparatoires (audit énergétique, programme d’utilisation fonctionnelle, étude de faisabilité (1er trimestre 2018). Les éléments suivants sont également inclus: la fourniture des services de l’inspecteur pour la supervision des travaux de construction, les activités obligatoires d’information et de promotion et l’audit ex post. Le demandeur a le droit de disposer du bien à des fins de construction. L’obtention d’un permis de construire relève de la responsabilité de l’entrepreneur, sélectionné dans le cadre d’un appel d’offres sans restriction pour la mise en œuvre des travaux de construction selon la formule «conception et construction». Le projet n’assume que l’assemblage d’éléments nouveaux et inutilisés. Achèvement du projet: 31.12.2021. (French)
    2 December 2021
    0 references

    Identifiers

    RPSW.03.03.00-26-0051/17
    0 references