Thermal modernisation of the guard building of the OSP in Koniemłoty (Q127651)

From EU Knowledge Graph
Revision as of 11:17, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet est d’accroître l’efficacité énergétique des bâtiments publics. L’investissement fait partie de l’objectif spécifique de la mesure 3.3 Améliorer les résultats. Energ. avec l’utilisation de sources d’énergie renouvelables dans le secteur du publ. et des soufflets, Axe Priorité.3. Une énergie efficace et verte, où il est possible de cofinancer des projets visant à accroître l’impact. Énergie des bâtiments publics. Le...)
Jump to navigation Jump to search
Project Q127651 in Poland
Language Label Description Also known as
English
Thermal modernisation of the guard building of the OSP in Koniemłoty
Project Q127651 in Poland

    Statements

    0 references
    405,215.5 zloty
    0 references
    97,251.72 Euro
    13 January 2020
    0 references
    476,724.12 zloty
    0 references
    114,413.79 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    31 January 2018
    0 references
    30 June 2020
    0 references
    OCHOTNICZA STRAŻ POŻARNA W KONIEMŁOTACH
    0 references
    0 references
    Głównym celem proj. jest zwiększona efektywność energ. budynków użyteczności publicznej. Inwestycja wpisuje się w cel szczegółowy Działania 3.3 Poprawa efekty. Energ. z wykorzysta. odnawialnych źródeł energii w sektorze publ. i mieszk., Osi prioryt.3. Efektywna i zielona energia, gdzie przewidziano możliwość dofinan. przedsięwzięć mających na celu zwiększenie efekty. Energ. budynków użyteczności publicznej. Projekt realizowany będzie w okresie: I 2018 do VI 2020. Prace związane z projektem będą polegały m.in. na: modernizacji inst. CO; ociepleniu stropu; wymianie okien, wymianie drzwi zewnętrznych, ociepleniu ścian zewnęt. oraz ścian zewnęt. przy gruncie, wymianie oświetlenia, instalacji PV. Właścicielem obiektu, w którym zostaną przeprowadzone prace termomodernizacyjne jest OSP Koniemłoty. Efektywność dofinan. projektu wynosi 5387,33zł/MWh/rok. Stopień poprawy efektywności energetycznej wynosi 83,57%. Efekt ekologiczny 98,88%. Oszczędność energii ciepła o 83,38% z wykorzystaniem OZE. Ograniczenie emisji CO2 do powietrza 53,11MgCo2/rok. Jest to budynek użyteczności publicznej pełniący funkcje społeczne i ratownicze. Efekt energ. wynosi 27,98kWh/m2. Proj. posiada dokum. tech. oraz wymagane decyzje admin. Proj. realizowany będzie na obszarze PR. Wskaźniki: Ilość zaoszczędzonej energii elektr.:3,37MWh/rok; Il. zaoszczędzonej energii cieplnej:293,18GJ/rok; Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów: 355,56GJ/rok; Szacowany roczny spadek emisji gazów cieplarnianych:53,11 tony równoważnika CO2/rok; Liczba zmodernizo. Energ. budynków: 1szt; Powierz. użytkowa budynków poddanych termomoder.:562,9m2; Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych: 211525 kWh/rok; Liczba zmoder. źródeł ciepła:1szt. L. wybud. jedn. wytwarzania energii elektr. z OZE 1szt. OSP Koniemłoty dokona audytu energ. ex-post w terminie 14 m-cy od zak. inwestycji.FNPV/C=630395,60;FRR/C=10,52%. Nabywane środki trwałe będą nowe. (Polish)
    0 references
    The main objective of the project is to increase the energy efficiency of public buildings. The investment is in line with the specific objective of Measure 3.3 Improving effects. Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Efficient and green energy, where the possibility of dofinan. projects aimed at increasing results is foreseen. Energy. Public buildings. The project will be implemented during the period of: And 2018 to VI 2020. The work related to the project will include: retrofitting inst. WHAT IS IT; the warming of the ceiling; replacement of windows, replacement of external doors, warming of the walls of the interiors and the walls of the remembrance of the ground, replacement of lighting, PV installation. The owner of the facility in which the thermal modernisation works will be carried out is the OSP Koniemłoty. The efficiency of the project is 5387.33zł/MWh/year. The energy efficiency improvement rate is 83.57 %. The ecological effect is 98.88 %. Energy savings of 83.38 % with the use of RES. Limit CO2 emissions to air 53.11MgCo2/year. It is a public utility building with social and rescue functions. The energy effect is 27.98 kWh/m². Proj. has dokum. tech. and required admin decisions. Project will be implemented in the PR area. Indicators: Amount of electricity saved: 3,37 MWh/year; Amount of thermal energy saved: 293,18GJ/year; Reduction of final energy consumption as a result of projects: 355,56GJ/year; Estimated annual decrease in greenhouse gas emissions:53.11 tonnes of CO2/year; The number of modernises. Energy of buildings: 1pcs; Space. usable buildings subjected to thermomometers.:562,9 m²; Reducing annual primary energy consumption in public buildings: 211525 kWh/year; Number of heat sources: 1 pcs. L. build one electricity generation from RES 1pcs. The OSP Koniemłoty will carry out an ex-post audit within 14 months of the investment.FNPV/C=630395,60;FRR/C=10,52 %. The fixed assets acquired will be new. (English)
    21 October 2020
    0 references
    L’objectif principal du projet est d’accroître l’efficacité énergétique des bâtiments publics. L’investissement fait partie de l’objectif spécifique de la mesure 3.3 Améliorer les résultats. Energ. avec l’utilisation de sources d’énergie renouvelables dans le secteur du publ. et des soufflets, Axe Priorité.3. Une énergie efficace et verte, où il est possible de cofinancer des projets visant à accroître l’impact. Énergie des bâtiments publics. Le projet sera mis en œuvre au cours de la période de: Et de 2018 à VI 2020. Les travaux liés au projet comprendront: modernisation de l’Inst. QUOI; le réchauffement du plafond; remplacement des fenêtres, remplacement des portes extérieures, réchauffement des murs extérieurs et des murs extérieurs au sol, remplacement de l’éclairage, installations photovoltaïques. Le propriétaire de l’installation où des travaux de thermomodernisation seront réalisés est le GRT Koniemłoty. L’efficacité du projet est de 5387,33 PLN/MWh/an. Le taux d’amélioration de l’efficacité énergétique est de 83,57 %. Effet écologique 98,88 %. Économie d’énergie de la chaleur de 83,38 % à l’aide de SER. Réduction des émissions de CO2 dans l’air 53,11MgCo2/an. Il s’agit d’un bâtiment d’utilité publique doté de fonctions sociales et de sauvetage. L’effet énergétique est de 27,98 kWh/m². Proj. a un doc. tech. et les décisions requises par l’administrateur. Le projet sera mis en œuvre dans le domaine des relations publiques. Indicateurs: Quantité d’électricité économisée en énergie: 3,37 MWh/an; C’est-à-dire économie d’énergie cieplnej:293,18GJ/rok; Réduction de la consommation finale d’énergie grâce aux projets: 355,56GJ/an; Diminution annuelle estimée des émissions de gaz: tonnes d’équivalent CO2/an; Nombre de zmodernizos. Énergie des bâtiments: 1pc; Confiez les bâtiments utilisables soumis à Thermomoder: 562,9 m²; Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics: 211 525 kWh/an; Nombre de sources modernes ciepła:1szt. L. construction d’un électr. génération à partir de RES 1 pcs. Le GRT Koniemłoty réalisera un audit énergétique ex post dans un délai de 14 mois à compter de inwestycji.FNPV/C=630395,60;FRR/C=10,52 %. Les immobilisations achetées seront nouvelles. (French)
    2 December 2021
    0 references

    Identifiers

    RPSW.03.03.00-26-0046/17
    0 references