Construction of the Regional Road Racibórz-Pszczyna on the section from the incorporation into DK No. 45 in Rudnik commune to the border of the town on the rights of Rybnik district – stage 4 and stage 5 of the Eastern Raciborza Circuit (Q124486)

From EU Knowledge Graph
Revision as of 08:38, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q124486 in Poland
Language Label Description Also known as
English
Construction of the Regional Road Racibórz-Pszczyna on the section from the incorporation into DK No. 45 in Rudnik commune to the border of the town on the rights of Rybnik district – stage 4 and stage 5 of the Eastern Raciborza Circuit
Project Q124486 in Poland

    Statements

    0 references
    0 references
    0 references
    146,000,000.0 zloty
    0 references
    35,040,000.0 Euro
    13 January 2020
    0 references
    171,764,705.9 zloty
    0 references
    41,223,529.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2018
    0 references
    31 December 2020
    0 references
    WOJEWÓDZTWO ŚLĄSKIE
    0 references

    50°5'25.4"N, 18°12'54.4"E
    0 references

    50°9'15.8"N, 18°10'13.8"E
    0 references
    Przedmiotem projektu jest budowa nowego odcinka drogi o długości 7,83 km, który stanowić będzie nowy przebieg drogi wojewódzkiej nr 935 od DK 45 w gminie Rudnik do ul. Piaskowej w Raciborzu. Zaprojektowano drogę jednojezdniową, na odcinkach szczególnie obciążonych ruchem poszerzoną do dwóch jezdni. W ramach inwestycji planowana jest realizacja następujących zadań: -budowa nowego przebiegu drogi wojewódzkiej nr 935, -budowa punktów węzłowych, -budowa obiektów inżynierskich, -budowa sieci, w tym: budowa odwodnienia drogi, przebudowa sieci wodociągowych, przebudowa sieci gazowych, sanitarnych, -przebudowa sieci elektroenergetycznych, -budowa oświetlenia ulicznego, -budowa sieci teletechnicznych, Rzeczową realizację projektu zaplanowano na lata 2018-2020. Odcinek objęty opracowaniem stanowi obwodnicę Raciborza i jest realizacją budowy drogi Regionalnej w nowym śladzie biegnącej ze wschodu na zachód od DK 1 w Pszczynie do DK 45 w m. Rudnik. (Polish)
    0 references
    The subject of the project is the construction of a new section of the road with a length of 7.83 km, which will constitute a new course of the Voivodeship Road No. 935 from DK 45 in the commune Rudnik to ul. Sandstone in Raciborz. A single-road road was designed, on sections that were particularly loaded with traffic extended to two carriageways. As part of the investment, the following tasks are planned: —construction of the new course of the voivodship road No. 935, – construction of nodes, -construction of engineering facilities, -construction of the network, including: construction of road drainage, reconstruction of water supply networks, reconstruction of gas, sanitary networks, -construction of electricity grids, -street lighting construction, – construction of teletechnical networks, real implementation of the project is planned for the years 2018-2020. The section covered by the study is the Raciborz bypass and is the construction of the Regional Road in a new trail running from the east to the west from DK 1 in Pszczyna to DK 45 in Rudnik. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.06.01.00-24-09G0/16
    0 references