Revision as of 08:24, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet consiste en l’extension de la route voïvodie no 515 sur la section du km 1 + 950 à Malbork jusqu’au site de l’extension antérieure de la route, en km environ 7 + 930 dans le village de Grzymała, d’environ 5,9 km de long. La route se déroulera principalement sur la voie précédente, la chaussée aura deux voies d’une largeur de 3,00 à 3,50 m chacune. L’objectif du projet est d’améliorer les paramètres techniques de la route vers la classe...)
Jump to navigation Jump to search
Project Q122364 in Poland
Language Label Description Also known as
English
Extension of Voivodeship Road No. 515 from Malbork to Mt. Grzymała.
Project Q122364 in Poland

    Statements

    0 references
    23,800,982.96 zloty
    0 references
    5,712,235.91 Euro
    13 January 2020
    0 references
    28,001,156.43 zloty
    0 references
    6,720,277.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2018
    0 references
    31 March 2020
    0 references
    WOJEWÓDZTWO POMORSKIE
    0 references
    0 references
    Projekt polega na rozbudowie drogi woj. nr 515 na odcinku od km 1+950 w Malborku do miejsca wykonanej wcześniej rozbudowy drogi, w km około 7+930 w miejscowości Grzymała o długości około 5,9 km. Droga będzie przebiegać głównie po dotychczasowym śladzie, jezdnia będzie posiadać dwa pasy ruchu o szerokości od 3,00 do 3,50 m każdy. Założeniem projektu jest poprawa parametrów technicznych drogi do klasy G oraz zwiększenie nośności drogi do 115 kN/oś. Przebudowane zostaną wszystkie skrzyżowania z drogami poprzecznymi, nastąpi korekta nienormatywnych łuków i spadków jezdni. Zostaną wybudowane chodniki, ścieżki rowerowe, przejścia dla pieszych wraz z azylami, zatoki autobusowe oraz pobocza gruntowe. Zostanie wykonane prawidłowe odwodnienie drogi poprzez rowy drogowe oraz budowę i przebudowę kanalizacji deszczowej na terenach zabudowanych. W miejscowościach zostanie wybudowane lub przebudowane oświetlenie uliczne wraz z kolidującą infrastrukturą sieciową uzbrojenia technicznego. (Polish)
    0 references
    The project consists of the extension of Voivodeship No. 515 on the section from km 1 + 950 in Malbork to the site of the previous extension of the road, in km about 7+ 930 in the town of Grzymała, about 5.9 km long. The road will run mainly on the trail, the roadway will have two lanes ranging from 3.00 to 3.50 m each. The aim of the project is to improve the technical parameters of the road to class G and increase the load capacity of the road to 115 kN/axis. All intersections with cross roads will be reconstructed, the unnormative arcs and slopes of the road will be corrected. Pavements, bicycle paths, pedestrian crossings with asylums, bus bays and ground roads will be built. Proper dehydration of the road through ditches and the construction and reconstruction of rainwater drainage in built-up areas will be performed. In the villages, street lighting will be built or rebuilt together with a conflicting network infrastructure of technical weapons. (English)
    21 October 2020
    0 references
    Le projet consiste en l’extension de la route voïvodie no 515 sur la section du km 1 + 950 à Malbork jusqu’au site de l’extension antérieure de la route, en km environ 7 + 930 dans le village de Grzymała, d’environ 5,9 km de long. La route se déroulera principalement sur la voie précédente, la chaussée aura deux voies d’une largeur de 3,00 à 3,50 m chacune. L’objectif du projet est d’améliorer les paramètres techniques de la route vers la classe G et d’augmenter la capacité de charge de la route à 115 kN/essieu. Toutes les intersections avec des carrefours seront reconstruites, les arcs non standard et les déclins routiers seront corrigés. Des trottoirs, des pistes cyclables, des passages pour piétons avec des asiles, des baies de bus et des terrains seront construits. Un drainage adéquat de la route à travers les fossés routiers ainsi que la construction et la reconstruction de l’eau de pluie dans les zones bâties seront effectués. Dans les villages, l’éclairage des rues sera construit ou reconstruit en même temps que l’infrastructure de réseau conflictuelle d’armements techniques. (French)
    2 December 2021
    0 references

    Identifiers

    RPPM.09.03.00-22-0002/18