Commissioning of hybrid wind turbines production (Q123381)

From EU Knowledge Graph
Revision as of 08:24, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet implique la mise en œuvre d’une série d’éoliennes hybrides en série avec un axe horizontal, translated_summary)
Jump to navigation Jump to search
Project Q123381 in Poland
Language Label Description Also known as
English
Commissioning of hybrid wind turbines production
Project Q123381 in Poland

    Statements

    0 references
    1,480,275.0 zloty
    0 references
    355,266.0 Euro
    13 January 2020
    0 references
    3,289,500.0 zloty
    0 references
    789,480.0 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    1 March 2017
    0 references
    31 March 2019
    0 references
    GATNER DARIUSZ FIRMA HANDLOWO-USŁUGOWA "DAREX"
    0 references
    0 references

    50°13'26.8"N, 18°43'37.6"E
    0 references
    Projekt zakłada wdrożenie do produkcji typoszeregu hybrydowych turbin wiatrowych w układzie szeregowym o osi poziomej (Polish)
    0 references
    The project assumes implementation for the production of hybrid wind turbines in serial system with horizontal axis (English)
    21 October 2020
    0 references
    Le projet implique la mise en œuvre d’une série d’éoliennes hybrides en série avec un axe horizontal (French)
    2 December 2021
    0 references

    Identifiers

    RPSL.03.02.00-24-0278/17
    0 references