Construction of integration hubs Gdańsk Rębiechowo and Gdańsk Osowa with access routes (Q122331)

From EU Knowledge Graph
Revision as of 08:22, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet comprend la construction/reconstruction d’une communication infra pour améliorer les nœuds Rębiechowo et Osowa. Un parking a été construit à la jonction Osowa pour env. 40 voitures, route reliant la rue. Barniewicka d’ul. Station d’été à Gdańsk. Il est prévu de reconstruire la boucle de bus avec des routes d’accès à la gare PKP/PKM Gdańsk Osowa et le parking pour vélos pour environ. 100 sièges. A l’arrêt PKM Rębiechowo il y aura un par...)
Jump to navigation Jump to search
Project Q122331 in Poland
Language Label Description Also known as
English
Construction of integration hubs Gdańsk Rębiechowo and Gdańsk Osowa with access routes
Project Q122331 in Poland

    Statements

    0 references
    15,538,079.0 zloty
    0 references
    3,729,138.96 Euro
    13 January 2020
    0 references
    47,336,272.54 zloty
    0 references
    11,360,705.41 Euro
    13 January 2020
    0 references
    32.82 percent
    0 references
    1 June 2015
    0 references
    31 December 2020
    0 references
    GMINA MIASTA GDAŃSKA
    0 references
    0 references
    Projekt obejmuje budowę/przebudowę infr. komunikacyjnej służącej usprawnieniu węzłów Rębiechowo i Osowa. Przy węźle Osowa wybudowano parking na ok. 40 samochodów osob., drogę łączącą ul. Barniewicką z ul. Letniskową w Gdańsku. Przewidziano przebudowę pętli autobusowej z drogami dojazdowymi przy dworcu PKP/PKM Gdańsk Osowa i parkingu rowerowego na ok. 100 miejsc. Przy przystanku PKM Rębiechowo będzie parking na 387 miejsc, stojaki rowerowe, monitoring. Węzeł leży na granicy gmin M. Gdańska i Żukowo. Gmina Żukowo, partner projektu, wybuduje drogi dojazdowe dla transportu indywidualnego i zbiorowego zapewniające bezpośredni dojazd do węzła (ul. Akacjowa ok. 750 m, ul. Słoneczna ok. 2400 m, ul. Bysewska ok. 800 m) oraz drogi rowerowe z Banina, Pępowa, Chwaszczyna, Leźna, Lnisk (ok. 26 km). Przeprowadzone zostaną kampanie informacyjno – edukacyjne, spotkania z mieszkańcami promujące transport zbiorowy i niezmotoryzowany. (Polish)
    0 references
    The project includes the construction/reconstruction of communication infr. to improve Rębiechowo and Osowa nodes. A parking lot was built at the node of Osowa. 40 cars., road connecting ul. Barniewicka from St. It’s a summer resort in Gdańsk. It is planned to rebuild the bus loop with access roads at the railway station/PKM Gdańsk Osowa and the bicycle parking lot for approx. It’s 100 seats. At the stop PKM Rębiechowo there will be parking for 387 seats, bicycle stands, monitoring. The node lies on the border of the communes of M. Gdańska and Żukowo. Żukowo commune, partner of the project, will build access roads for individual and collective transport ensuring direct access to the junction (ul. Acacia’s fine. 750 m, ul. Sunny’s fine. 2400 m, ul. Bysewska’s okay. 800 m) and bicycle roads from Banina, Pępowa, Chwaszczyna, Leźna, Lnisk (approx. 26 km. Information and educational campaigns will be carried out, meetings with residents promoting collective transport and non-motorised transport. (English)
    21 October 2020
    0 references
    Le projet comprend la construction/reconstruction d’une communication infra pour améliorer les nœuds Rębiechowo et Osowa. Un parking a été construit à la jonction Osowa pour env. 40 voitures, route reliant la rue. Barniewicka d’ul. Station d’été à Gdańsk. Il est prévu de reconstruire la boucle de bus avec des routes d’accès à la gare PKP/PKM Gdańsk Osowa et le parking pour vélos pour environ. 100 sièges. A l’arrêt PKM Rębiechowo il y aura un parking pour 387 places, des stands de vélos, surveillance. Le carrefour se trouve à la frontière des municipalités de M. Gdańska et d’Ukowo. La municipalité de Uukowo, partenaire du projet, construirea des routes d’accès pour les transports individuels et collectifs assurant un accès direct à la jonction (ul. L’acacia va bien. 750 m, m. Ensoleillé env. 2 400 m, St. Bysewska env. 800 m) et pistes cyclables de Banina, Pępowo, Chwaszczyna, Leźna, Lnisk (env. 26 km). Des campagnes d’information et d’éducation seront menées, des rencontres avec les habitants promouvant les transports collectifs et non motorisés. (French)
    2 December 2021
    0 references

    Identifiers

    RPPM.09.01.01-22-0008/17
    0 references