Preparation of infrastructure to locate and conduct business in degraded and post-industrial areas in Piekary Śląskie (Q122885)

From EU Knowledge Graph
Revision as of 07:56, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q122885 in Poland
Language Label Description Also known as
English
Preparation of infrastructure to locate and conduct business in degraded and post-industrial areas in Piekary Śląskie
Project Q122885 in Poland

    Statements

    0 references
    2,267,182.49 zloty
    0 references
    544,123.80 Euro
    13 January 2020
    0 references
    2,667,273.52 zloty
    0 references
    640,145.64 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 May 2017
    0 references
    30 May 2018
    0 references
    GMINA PIEKARY ŚLĄSKIE
    0 references

    50°22'32.9"N, 18°56'16.4"E
    0 references
    Projekt polega na kompleksowym przygotowaniu terenów inwestycyjnych typu brownfield w rejonie ul. Podmiejskiej, DW 911 i ul. Pod Lipami w Piekarach Śląskich, w celu nadania im nowych funkcji gospodarczych wraz z możliwością ich promocji. Przedmiotem projektu jest odwodnienie poprzez budowę sieci kanalizacji deszczowej i budowa drogi, w efekcie czego uzbrojonych zostanie 13,38 ha terenów inwestycyjnych. Elementem projektu jest również promocja inwestycyjna uzbrojonego obszaru. Projekt realizowany będzie w okresie od dnia 25.05.2017 r. do dnia 30.05.2018 r. (Polish)
    0 references
    The project consists of a comprehensive preparation of brownfield investment areas in the area of ul. Suburban, DW 911 and ul. Under Lipa in Piekary Śląskie, in order to give them new economic functions, together with the possibility of promoting them. The object of the project is dehydration through the construction of a rainwater sewerage network and the construction of a road, as a result of which 13.38 ha of investment areas will be armed. Investment promotion of the armed area is also an element of the project. The project will be implemented in the period from 25.05.2017 to 30.05.2018. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.03.01.01-24-01F3/16
    0 references