Construction of sanitary sewage system in Smatowo Border – Centrum (Q122582)

From EU Knowledge Graph
Revision as of 07:38, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la construction d’un système d’assainissement sanitaire avec raccordement dans la ville de Smytowo Graniczne — Centrum. Le projet prévoit d’effectuer des travaux de construction liés à la construction d’un système d’assainissement par gravité et de décharge ainsi qu’une usine de compression des eaux usées. La longueur totale du réseau d’assainissement sanitaire gravitationnel prévu avec les puits est de 2 293,5 m. L’objecti...)
Jump to navigation Jump to search
Project Q122582 in Poland
Language Label Description Also known as
English
Construction of sanitary sewage system in Smatowo Border – Centrum
Project Q122582 in Poland

    Statements

    0 references
    2,349,246.09 zloty
    0 references
    563,819.06 Euro
    13 January 2020
    0 references
    2,763,818.95 zloty
    0 references
    663,316.55 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    6 October 2016
    0 references
    30 April 2018
    0 references
    GMINA SMĘTOWO GRANICZNE
    0 references
    Przedmiotem projektu jest budowa kanalizacji sanitarnej wraz z przyłączami w miejscowości Smętowo Graniczne – Centrum. W ramach projektu planuje się przeprowadzenie robót budowlanych związanych z budową kanalizacji sanitarnej grawitacyjnej i tłocznej wraz z tłocznią ścieków. Łączna długość projektowanej sieci kanalizacji sanitarnej grawitacyjnej wraz z kinetami studni wynosi 2 293,5 m. Głównym celem projektu jest zwiększenie dostępności zbiorczego systemu kanalizacji sanitarnej oraz spełnienie zobowiązań akcesyjnych w zakresie oczyszczania ścieków w aglomeracjach od 2 do 10 tys. RLM. Aglomeracja Smętowo Graniczne z oczyszczalnią ścieków w Kopytkowie, na obszarze której będzie realizowany projekt, należy do aglomeracji z tego przedziału RLM. W wyniku realizacji projektu zwiększy się zasięg zbiorczego systemu kanalizacji sanitarnej w gminie Smętowo Graniczne – do projektowanej sieci zostanie podłączonych 392 mieszkańców, tym samym zwiększy się stopień skanalizowania gminy. (Polish)
    0 references
    The subject of the project is the construction of sanitary sewage system with connections in the town of Smętowo Bordericzne – Centrum. As part of the project, construction works related to the construction of gravity and pressing sanitary sewers together with a sewage pressing plant are planned. The total length of the project’s gravitational sanitary sewage system and the well cinemas is 2293.5 m. The main aim of the project is to increase the availability of the collective sanitary system and fulfil the accession obligations in the area of sewage treatment in agglomerations from 2 to 10 thousand. IT’S AN RLM. Agglomeration Smotowo Border with a sewage treatment plant in Kopytkowo, where the project will be implemented, belongs to the agglomeration of this RLM range. As a result of the project, the scope of the collective sanitary system in the commune of Smatowo Bordericzne will be increased – 392 inhabitants will be connected to the planned network, thus increasing the level of drainage of the commune. (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’un système d’assainissement sanitaire avec raccordement dans la ville de Smytowo Graniczne — Centrum. Le projet prévoit d’effectuer des travaux de construction liés à la construction d’un système d’assainissement par gravité et de décharge ainsi qu’une usine de compression des eaux usées. La longueur totale du réseau d’assainissement sanitaire gravitationnel prévu avec les puits est de 2 293,5 m. L’objectif principal du projet est d’augmenter la disponibilité du système collectif d’assainissement sanitaire et de respecter les engagements d’adhésion pour le traitement des eaux usées dans les agglomérations de 2 à 10 000. P.E. L’agglomération de Smortowo Graniczne avec la station d’épuration des eaux usées de Kopytkowo, où le projet sera réalisé, appartient à l’agglomération de cette gamme d’EH. Grâce au projet, le réseau d’assainissement collectif de la commune de Smytowo Graniczne sera augmenté — 392 habitants seront raccordés au réseau prévu, augmentant ainsi le niveau d’assainissement de la commune. (French)
    2 December 2021
    0 references

    Identifiers

    RPPM.11.03.00-22-0023/16
    0 references