Expansion and reconstruction of the system of collection, discharge and cleaning of rain and melt waters together with the construction of reservoirs in Sierakowice (Q122512)

From EU Knowledge Graph
Revision as of 07:37, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet sera mis en œuvre à Sierakowice, dans le comté de Kartusa, dans la voïvodie de Poméranie. Portée des investissements dans les rues suivantes: Lęborska, Légions, Dworcowa, P. B. Łosiński (la zone de l’autel pontifical) comprend la reconstruction et la construction d’un réseau de canaux de pluie de longueur totale. 2 029,30 m avec armement: colons de centrifugeuses à une chambre (2kpl.) et séparateur coalésescent dans la chambre (2kpl.),...)
Jump to navigation Jump to search
Project Q122512 in Poland
Language Label Description Also known as
English
Expansion and reconstruction of the system of collection, discharge and cleaning of rain and melt waters together with the construction of reservoirs in Sierakowice
Project Q122512 in Poland

    Statements

    0 references
    4,413,406.23 zloty
    0 references
    1,059,217.50 Euro
    13 January 2020
    0 references
    6,304,866.04 zloty
    0 references
    1,513,167.85 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    8 January 2018
    0 references
    30 September 2019
    0 references
    GMINA SIERAKOWICE
    0 references
    Projekt będzie realizowany w m. Sierakowice (gm. Sierakowice), w powiecie kartuskim, woj. pomorskim. Zakres inwestycji w obrębie ul.: Lęborskiej, Legionów, Dworcowej, Ks. B. Łosińskiego (teren Ołtarza Papieskiego) obejmuje przebudowę i budowę sieci kan. deszczowej o łącznej dł. 2 029,30 m z uzbrojeniem: osadniki wirowe jednokomorowe (2kpl.) oraz separator koalescencyjny w komorze (2kpl.), 2 zbiorniki retencyjne o poj.: 3 300 m3 i 9 100 m3, a także budowę i przebudowę kolektora kan. deszczowej w obszarze kolejowym i gruncie Skarbu Państwa o łącznej dł. 183,5 m. Retencyjność kolektora na terenie Ołtarza Papieskiego - 788 m3. Celem projektu jest wzmocnienie odporności Sierakowic na zagrożenia naturalne, takie jak powódź, czy susze. Wskaźniki produktu: Poj. obiektów małej retencji - 13 188m3 Dł. wybudowanej sieci kan. deszczowej - 0,72km Dł. przebudowanej sieci kan. deszczowej - 1,48km Wskaźnik rezultatu: Liczba ludności odnoszącej korzyści ze środków ochrony przeciwpowodziowej - 2 227os. (Polish)
    0 references
    The project will be implemented in Sierakowice (gm. Sierakowice), in Kartuskie County, Pomerania Voivodeship. Scope of investments within ul.: Łęborska, Legionów, Dworcowa, Fr. B. Łosiński (the area of the Papal Altar) includes the reconstruction and construction of a rain canal network with total length. 2029,30 m with armament: single-chamber centrifugal settlers (2 kpl.) and a coal-scene separator in the chamber (2 kpl.), 2 retention tanks with: 3300 m³ and 9100 m³, as well as construction and reconstruction of the rain canal collector in the railway area and the State Treasury land with a total length. 183.5 m. Retency of the collector in the Papal Altar – 788 m³. The aim of the project is to strengthen Sierakowice’s resistance to natural hazards such as floods or droughts. Output indicators: Capacity of small retention facilities – 13188 m³ Dł. of built rain canal – 0.72 km Long. of remodeled rain canal network – 1.48 km Results indicator: Population benefiting from flood protection measures – 2,227 people. (English)
    21 October 2020
    0 references
    Le projet sera mis en œuvre à Sierakowice, dans le comté de Kartusa, dans la voïvodie de Poméranie. Portée des investissements dans les rues suivantes: Lęborska, Légions, Dworcowa, P. B. Łosiński (la zone de l’autel pontifical) comprend la reconstruction et la construction d’un réseau de canaux de pluie de longueur totale. 2 029,30 m avec armement: colons de centrifugeuses à une chambre (2kpl.) et séparateur coalésescent dans la chambre (2kpl.), 2 réservoirs de rétention d’une capacité: 3 300 m³ et 9 100 m³, ainsi que la construction et la reconstruction d’un collecteur de canaux de pluie dans la zone ferroviaire et le terrain du Trésor public d’une longueur totale. 183,5 m. rétention du collecteur sur le territoire de l’autel pontifical — 788 m³. L’objectif du projet est de renforcer la résistance de Sierakowice aux aléas naturels tels que les inondations ou les sécheresses. Indicateurs de réalisation: Capacité des petites installations de rétention — 13 188 m³ Longueur du réseau de canaux de pluie construits — 0,72 km Réseau de canaux de pluie reconstruit long — 1,48 km Indicateur de résultat: Population bénéficiant de mesures de protection contre les inondations — 2 227 personnes. (French)
    2 December 2021
    0 references

    Identifiers

    RPPM.11.01.00-22-0012/16
    0 references