Pure energy in the photovoltaic installation in the ML System. (Q118595)

From EU Knowledge Graph
Revision as of 07:17, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le principal objectif (stratégique) du projet est de protéger l’environnement en augmentant le niveau de production d’énergie à partir de sources d’énergie renouvelables dans le système ML d’environ. 193 MWhe par an.La réalisation de l’objectif global sera possible par la réalisation d’objectifs spécifiques:- réduire la quantité de gaz à effet de serre et d’autres substances nocives émises dans l’atmosphère, y compris une réduction de l’équivale...)
Jump to navigation Jump to search
Project Q118595 in Poland
Language Label Description Also known as
English
Pure energy in the photovoltaic installation in the ML System.
Project Q118595 in Poland

    Statements

    0 references
    436,700.0 zloty
    0 references
    104,808.0 Euro
    13 January 2020
    0 references
    794,000.0 zloty
    0 references
    190,560.0 Euro
    13 January 2020
    0 references
    55.0 percent
    0 references
    1 January 2018
    0 references
    31 May 2019
    0 references
    ML SYSTEM S.A.
    0 references
    0 references
    Celem głównym (strategicznym) projektu jest ochrona środowiska naturalnego poprzez zwiększenie poziomu produkcji energii z odnawialnych źródeł energii w ML System o ok. 193 MWhe rocznie.Osiągnięcie celu głównego możliwe będzie dzięki realizacji celów szczegółowych:- ograniczenie ilości gazów cieplarnianych oraz innych substancji szkodliwych emitowanych do atmosfery, w tym redukcja ekwiwalentu CO2 ok. 159,22 Mg rocznie,- zwiększenie wykorzystania odnawialnych źródeł energii w ML System poprzez uruchomienie instalacji fotowoltaicznej (1 szt.) o mocy ok. 0,19 MWe- zmniejszenie kosztów wytwarzania energii elektrycznej dzięki instalacji dodatkowego źródła energii,- podniesienie walorów przyrodniczych gminy poprzez ograniczenie emisji zanieczyszczeń oraz promowanie postaw proekologicznych.Przedmiot projektu obejmuje instalację 666 sztuk modułów fotowoltaicznych o mocy 0,19 MWe (199,8 kW), wykonanych w technologii polikrystalicznej z minimum 4 busbarami, usytuowanych pod kątem ok. 25% do płaszczyzny poziomej, na południe. Wysokość instalacji maks. 222,0 m n.p.m. Moduły fotowoltaiczne będą służyć produkcji prądu elektrycznego. Całość wytworzonej energii zostanie wykorzystana na potrzeby własne budynku ML System (bez wprowadzenia do sieci elektroenergetycznej).Instalacja zlokalizowana będzie na dachu istniejącej hali produkcyjnej (obiekt jednokondygnacyjny) ML System w Zaczerniu 190 G, gmina Trzebownisko (działka nr 1/35), na profilach solarnych i przykręcona do nich przy użyciu aluminiowych zacisków. Moduły połączone będą przy użyciu kabli solarnych tworząc sekcje połączone z falownikami (połączone poprzez rozdzielnice z wewnętrzną instalacją niskiego napięcia). Instalacja wyposażona w niezbędne zabezpieczenia i automatykę uniemożliwiające podanie napięcia na sieć dystrybucyjną. Instalacje wewnętrzne prowadzone po trasach wewnątrz budynku. System pomiarowy zgodny z wymogami Zakł.Energet. Miejsce przyłączenia sieci odbiorczej: stacja transformatorowa w istniejącej hali ML. (Polish)
    0 references
    The main (strategic) goal of the project is to protect the environment by increasing the level of energy production from renewable energy sources in the ML System by approx. 193 MWhe per year.The achievement of the main objective will be possible through specific objectives:- To reduce the amount of greenhouse gases and other harmful substances emitted into the atmosphere, including a reduction of CO2 equivalent approx. 159.22 Mg per year,- increase the use of renewable energy sources in ML System by launching a photovoltaic installation (1 pcs.) with a capacity of approx. 0.19 MWe – reduce the cost of electricity generation thanks to the installation of additional energy sources,- raising the natural values of the municipality by reducing pollutant emissions and promoting environmental behaviour.The project subject includes the installation of 666 units of photovoltaic modules with a capacity of 0.19 MWe (199.8 kW), made in polycrystalline technology with a minimum of 4 busbars, located at an angle of approx. 25 % to the horizontal plane, south. Installation height max. 222.0 m above sea level photovoltaic modules will be used to produce electric current. The installation will be located on the roof of the existing production hall (one-storey object) ML System in Zaczerno 190 G, the municipality of Trzebownisko (a plot No 1/35), on solar profiles and bolted to them using aluminium terminals. Modules will be connected using solar cables to form sections connected to inverters (connected via switchgears with an internal low-voltage installation). Installation equipped with the necessary safeguards and automation to prevent the supply of voltage to the distribution network. Internal installations carried out on routes inside the building. Measurement system compliant with the requirements of Zak.Energet. Place of connection of the receiving network: transformer station in the existing ML hall. (English)
    20 October 2020
    0 references
    Le principal objectif (stratégique) du projet est de protéger l’environnement en augmentant le niveau de production d’énergie à partir de sources d’énergie renouvelables dans le système ML d’environ. 193 MWhe par an.La réalisation de l’objectif global sera possible par la réalisation d’objectifs spécifiques:- réduire la quantité de gaz à effet de serre et d’autres substances nocives émises dans l’atmosphère, y compris une réduction de l’équivalent CO2 d’environ. 159,22 Mg par an,- augmenter l’utilisation des sources d’énergie renouvelables dans le système ML en lançant une installation photovoltaïque (1 pièce) d’une capacité d’environ. 0,19 MWe- réduction des coûts de production d’électricité par l’installation d’une source d’énergie supplémentaire,- augmentation des valeurs naturelles de la commune en réduisant les émissions de polluants et en favorisant les attitudes environnementales. Le projet comprend l’installation de 666 unités de modules photovoltaïques d’une capacité de 0,19 MWe (199,8 kW), réalisés en technologie polycristalline avec un minimum de 4 barres de bus, situées à un angle d’env. 25 % à l’horizontale, au sud. Hauteur d’installation max. Des modules photovoltaïques de 222,0 m au-dessus du niveau de la mer seront utilisés pour produire du courant électrique. L’ensemble de l’énergie produite sera utilisée pour répondre aux besoins propres du bâtiment du système ML (sans entrer dans le réseau électrique).L’installation sera située sur le toit de la salle de production existante (installation d’un étage) Système ML à Zaczerń 190 G, la municipalité de Trzebownisko (portail no 1/35), sur des profilés solaires et boulonnés à l’aide de pinces en aluminium. Les modules seront raccordés à l’aide de câbles solaires pour former des sections reliées aux onduleurs (connectés par des appareils de commutation avec installation interne basse tension). Installation équipée de la sécurité et de l’automatisation nécessaires pour empêcher l’application de la tension sur le réseau de distribution. Installations internes réalisées sur des voies internes. Système de mesure conforme aux exigences de l’annexe.Energet. Localisation du raccordement du réseau de demande: poste de transformateur dans le hall ML existant. (French)
    2 December 2021
    0 references

    Identifiers

    RPPK.03.01.00-18-0492/17
    0 references