Installation of renewable energy sources – photovoltaics and heat pumps for supporting water heating on multi-housing buildings, production and public buildings. (Q118588)

From EU Knowledge Graph
Revision as of 07:17, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q118588 in Poland
Language Label Description Also known as
English
Installation of renewable energy sources – photovoltaics and heat pumps for supporting water heating on multi-housing buildings, production and public buildings.
Project Q118588 in Poland

    Statements

    0 references
    889,597.25 zloty
    0 references
    213,503.34 Euro
    13 January 2020
    0 references
    1,046,585.0 zloty
    0 references
    251,180.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    13 June 2017
    0 references
    31 December 2019
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA LOKATORSKO-WŁASNOŚCIOWA "PAX-NAFTOBUDOWA"
    0 references
    0 references
    Głównym celem projektu jest zwiększenie udziału produkcji energii elektrycznej i cieplnej przy pomocy odnawialnych źródeł energii w obiektach wielomieszkaniowych, produkcyjnych i budynkach użyteczności publicznej na obszarze Jasła i gminy Tarnowiec. Przedmiotem projektu jest budowa nowych instalacji wykorzystujących odnawialne źródła energii w budynku wielomieszkaniowym Spółdzielni Mieszkaniowej Lokatorsko-Własnościowej Pax-Naftobudowa, w obiekcie użyteczności publicznej (warsztaty terapii zajęciowej) użytkowanym przez Polskie Stowarzyszenie na Rzecz Osób z Niepełnosprawnością Intelektualną Koło w Jaśle oraz w dwóch obiektach produkcyjnych firmy Tubus Stanisław Hajkuś w Czeluśnicy i Tarnowcu. Listę planowanych do budowy instalacji wskazano poniżej:- instalacja fotowoltaiczna o mocy 27,5 kW na budynku Spółdzielni Mieszkaniowej Lokatorsko-Własnościowej PAX-Naftobudowa w Jaśle, blok mieszkalny Jasło ul. Kochanowskiego 6.- dwie instalacje fotowoltaiczne o mocy 19,25 kW na budynku Spółdzielni Mieszkaniowej Lokatorsko-Własnościowej PAX-Naftobudowa w Jaśle, blok mieszkalny Jasło ul. Kochanowskiego 6, - Instalacja fotowoltaiczna o mocy 39,875 kW na budynku produkcyjnym firmy TUBUS Stanisław Hajkuś w Czeluśnicy 176. - Instalacja fotowoltaiczna o mocy 39,875 kW na budynku produkcyjnym firmy TUBUS Stanisław Hajkuś w Tarnowcu. - Instalacja fotowoltaiczna o mocy 13,475 kW na budynku użyteczności publicznej (warsztaty terapii zajęciowej) użytkowanego przez Polskie Stowarzyszenie na Rzecz Osób z Niepełnosprawnością Intelektualną Koło w Jaśle, ul. Floriańska 170. Instalacja zostanie wykonana ze 49 paneli polikrystalicznych o mocy 275 W.- Pompa ciepła powietrze-woda o mocy 39 kW ( 3X13 kW) z zastosowaniem do wspomagania podgrzewu c.w.u. w budynku Spółdzielni Mieszkaniowej Lokatorsko-Własnościowej PAX-Naftobudowa w Jaśle, blok mieszkalny Jasło ul. Kochanowskiego 6. Kaskada pomp inwerterowych typu SPLIT 3 x 13 kW. (Polish)
    0 references
    The main objective of the project is to increase the share of the production of electricity and heat using renewable energy sources in multi-housing, production and public buildings in the area of Jasła and the municipality of Tarnowiec. The subject of the project is the construction of new installations using renewable energy sources in the multi-housing building of the Pax-Nafto housing Housing Cooperative, in a public utility facility (employment therapy workshop) used by the Polish Association for Persons with Intellectual Disability Koło in Jas³aw and in two production facilities of the tubus company Stanisław Hajkuś in Czeluśnica and Tarnowiec. The list of planned installations is listed below:- a 27.5 kW photovoltaic installation on the building of the Housing Cooperative PAX-Naftobudowa in Jasło, residential block Jasło Street. Kochanowskiego 6.- two photovoltaic installations with a capacity of 19.25 kW on the building of the Housing Cooperative PAX-Nafto housing in Jasło, residential block Jasło Street. Kochanowskiego 6, – Photovoltaic installation of 39.875 kW on the production building of the tube company Stanisław Hajkuś in Czeluśnica 176. — Photovoltaic installation with a power of 39.875 kW on the production building of the Stanisław Hajkuś tube company in Tarnowc. — Photovoltaic installation with a power of 13.475 kW on a public utility building (workshops of occupational therapy) used by the Polish Association for Persons with Intellectual Disability Koło w Jaśle, ul. Florianska 170. The installation will be made of 49 polycrystalline panels with a capacity of 275 W.- Air-water heat pump with a power of 39 kW (3X13 kW) with the use to support heating hot water in the building of the Housing Cooperative PAX-Naftobudowa in Jasło, residential block Jasło Street. Kochanowski 6. Cascade of inverter pumps SPLIT type 3 x 13 kW. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.01.00-18-0475/17
    0 references