Thermal modernisation of educational buildings: ZS No 3 in Nisko and gymnasium building at PSP No. 4 in Nisko (Q118700)

From EU Knowledge Graph
Revision as of 07:16, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q118700 in Poland
Language Label Description Also known as
English
Thermal modernisation of educational buildings: ZS No 3 in Nisko and gymnasium building at PSP No. 4 in Nisko
Project Q118700 in Poland

    Statements

    0 references
    1,112,003.69 zloty
    0 references
    266,880.89 Euro
    13 January 2020
    0 references
    1,308,239.66 zloty
    0 references
    313,977.52 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 September 2016
    0 references
    29 December 2017
    0 references
    GMINA I MIASTO NISKO
    0 references
    0 references
    Przedmiotem realizowanego projektu jest głęboka termomodernizacja dwóch budynków oświatowych należących do Gminy i Miasta Nisko. Zakres prac został ustalony na podstawie wcześniej przygotowanych audytów energetycznych. Projekt stanowi element podejścia strategicznego gminy do działania w ramach opracowanego Planu Gospodarki Niskoemisyjnej dla Gminy i Miasta Nisko.Przedmiotem projektu jest głęboka termomodernizacja budynku sali gimnastycznej przy Publicznej Szkole Podstawowej Nr 4 w Nisku – Podwolinie oraz budynku Zespołu Szkół Nr 3 w Nisku. Zakres termomodernizacji obejmuje:Budynek Sali gimnastycznej przy PSP Nr 4: wymianę stolarki okiennej i drzwiowej; docieplenie ścian powyżej gruntu; docieplenie stropu granulatem; docieplenie dachu; opracowanie audytu powykonawczego; modernizację instalacji sanitarnej, w tym: roboty demontażowe c.o., montaż grzejników, izolacji, rurociągów z rur stalowych, roboty budowlane i montaż instalacji solarnej.Budynek ZS Nr 3 w Nisku: wymianę stolarki okiennej i drzwiowej; docieplenie ścian poniżej i powyżej gruntu; docieplenie ścian cokołu szkoły; docieplenie stropu nad ostatnią kondygnacją budynku szkoły; docieplenie dachu sali gimnastycznej; remont instalacji odgromowej; opracowanie audytu powykonawczego; modernizację instalacji sanitarnej, w tym: roboty demontażowe c.o., montaż grzejników, izolacji, rurociągów z rur stalowych, roboty budowlane i montaż instalacji solarnej.Celem nadrzędnym projektu jest podniesienie efektywności energetycznej dwóch budynków oświatowych, budynku sali gimnastycznej przy PSP Nr 4w Nisku – Podwolinie oraz budynku ZS Nr 3 w Nisku. Do celów bezpośrednich projektu należy:- zmniejszenie zapotrzebowania budynków na energię;- ograniczenie zużycia energii cieplnej;- ograniczenie emisji CO2;- wzrost produkcji energii cieplnej w oparciu o instalacje OZE (kolektory słoneczne);- obniżenie kosztów ogrzewania budynków;- rozwój gospodarki niskoemisyjnej na terenie gminy i miasta Nisko. (Polish)
    0 references
    The subject of the project is a deep thermal modernisation of two educational buildings belonging to the Municipality and the City of Nisko. The scope of the work was established on the basis of pre-prepared energy audits. The project is an element of the municipality’s strategic approach to the operation of the Low-Emission Economy Plan developed for the municipality and the Low Town.The subject of the project is a deep thermal modernisation of the gym building at the Public Primary School No. 4 in Nisko – Podwolin and the School Complex No. 3 in Nisko. The scope of the thermal modernisation includes:The gymnasium building at PSP No. 4: replacement of window and door carpentry; warming of walls above the ground; granulate warming of the ceiling; roof warming; the development of post-executive audits; modernisation of sanitary installations, including: central heating disassembly works, installation of radiators, insulation, pipelines made of steel pipes, construction works and installation of solar installations. replacement of window and door carpentry; warming of walls below and above the ground; warming the walls of the school pedestal; warming the ceiling over the last floor of the school building; warming of the roof of the gym; overhaul of the lightning protection system; the development of post-executive audits; modernisation of sanitary installations, including: the main objective of the project is to increase the energy efficiency of two educational buildings, the gymnasium building at PSP No.4 in Nisko – Podwolin and the ZS No. 3 building in Nisko. For the purposes of the direct project include:- reducing the demand of buildings for energy;- reducing the consumption of thermal energy;- reducing CO2 emissions;- an increase in the production of heat based on RES installations (solar collectors);- lower heating costs of buildings;- the development of low-carbon economy in the municipality and the town of Nisko. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0070/16
    0 references