Reconstruction of the People’s House in Sieklówka with thermomodernisation and use of renewable energy sources. (Q118677)

From EU Knowledge Graph
Revision as of 07:16, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif direct du projet est d’améliorer l’efficacité énergétique de la construction de la Maison du Peuple à Sieklówka au niveau des bâtiments économes en énergie, avec l’introduction simultanée du système de gestion de l’énergie. Les objectifs généraux sont d’améliorer les conditions d’utilisation de l’installation et d’éliminer l’inconfort thermique ressenti par les utilisateurs, de réduire le coût de l’approvisionnement en énergie du bâti...)
Jump to navigation Jump to search
Project Q118677 in Poland
Language Label Description Also known as
English
Reconstruction of the People’s House in Sieklówka with thermomodernisation and use of renewable energy sources.
Project Q118677 in Poland

    Statements

    0 references
    482,208.64 zloty
    0 references
    115,730.07 Euro
    13 January 2020
    0 references
    567,304.3 zloty
    0 references
    136,153.03 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 October 2015
    0 references
    29 December 2017
    0 references
    GMINA KOŁACZYCE
    0 references
    Bezpośrednim celem realizacji projektu jest poprawa efektywności energetycznej budynku Domu Ludowego w Sieklówce do poziomu budownictwa energooszczędnego z równoczesnym wprowadzaniem systemu zarządzania energią. Cele ogólne to poprawa warunków użytkowania obiektu i likwidacja dyskomfortu cieplnego odczuwanego przez użytkowników, redukcja kosztów zaopatrzenia budynku w energię oraz zmniejszenie zanieczyszczenia powietrza ze względu na ograniczenie emisyjności źródeł energii. Przedmiotem projektu jest przebudowa Domu Ludowego w Sieklówce z termomodernizacją i wykorzystaniem odnawialnych źródeł energii, obejmująca prace budowlane i instalacyjne. W wariancie inwestycyjnym zaprojektowano: • Modernizację przegrody - Strop ostatniej kondygnacji części nowszej i starszej, • Modernizację przegrody – ściana w gruncie fundamentowa, • Modernizację przegrody - Ściana zewnętrzna – Domu Ludowego i OSP, • Modernizację przegrody – stolarka okienna, • Modernizację przegrody – stolarka drzwiowa, • Modernizację instalacji grzewczej – wymiana źródła ciepła na kocioł kondensacyjny gazowy oraz instalacja pompy ciepła z wymiennikiem powietrznym z zasobnikiem buforowym jako główne źródło ogrzewania. • Montaż zestawu ogniw fotowoltaicznych o mocy 15,6 kW jako mikroźródło produkcji energii elektrycznej na potrzeby działalności obiektu. Zadania planowane do realizacji są ukierunkowane na wsparcie efektywności energetycznej i inteligentnego zarządzania energią oraz wykorzystywania odnawialnych źródeł energii. Produkty projektu: dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych: 0,0156 MWe, liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE: 1 szt., dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych: 0,031 MWt, liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE: 1 szt., liczba zmodernizowanych energetycznie budynków: 1 szt., powierzchnia użytkowa budynków poddanych termomodernizacji: 582,2 m2. (Polish)
    0 references
    The direct objective of the project is to improve the energy efficiency of the building of the People’s House in Sieklówka to the level of energy-efficient construction with the simultaneous introduction of the energy management system. The general objectives are to improve the conditions of use of the facility and to eliminate the heat discomfort felt by users, to reduce the cost of energy supply of the building and to reduce air pollution due to the reduction of energy emissibility. The subject of the project is the reconstruction of the People’s House in Sieklówka with thermal modernisation and the use of renewable energy sources, including construction and installation works. Under the Investment Option, the following are designed: • Modernisation of the partition – the floor of the last floor of the new and older parts, • Modernisation of the partition – the wall in the foundation, • Modernisation of the partition – the outer wall – the People’s House and the OSP, • Modernisation of the partition – window carpenter, • Modernisation of the partition – main carpenter, • Modernisation of heating system – exchange of heat source into a gas condensation boiler and installation of a heat pump with a ventilator. • Installation of a set of photovoltaic cells with a power of 15.6 kW as Micro source of electricity production for the purpose of the operation of the facility. The planned tasks are aimed at supporting energy efficiency, smart energy management and the use of renewable energy sources. Products of the project: additional capacity to generate electricity from renewable sources: 0,0156 MWe, number of built electricity generation units from RES: 1 units, additional capacity to generate heat from renewable sources: 0,031 MWt, number of built units of thermal energy from RES: 1 pieces, number of energy-efficient buildings: 1 units, usable surface of buildings undergoing thermal modernisation: 582,2 m². (English)
    20 October 2020
    0 references
    L’objectif direct du projet est d’améliorer l’efficacité énergétique de la construction de la Maison du Peuple à Sieklówka au niveau des bâtiments économes en énergie, avec l’introduction simultanée du système de gestion de l’énergie. Les objectifs généraux sont d’améliorer les conditions d’utilisation de l’installation et d’éliminer l’inconfort thermique ressenti par les utilisateurs, de réduire le coût de l’approvisionnement en énergie du bâtiment et de réduire la pollution de l’air due à la réduction des sources d’énergie. L’objet du projet est la reconstruction de la Maison du Peuple à Sieklówka avec thermomodernisation et l’utilisation de sources d’énergie renouvelables, y compris les travaux de construction et d’installation. L’option d’investissement a été conçue pour: • Modernisation de la cloison — Le plafond du dernier étage de la partie plus récente et ancienne, • Rénovation de la cloison — mur dans le sol de fondation, • Rénovation de la cloison — mur extérieur — Maison populaire et OSP, • Rénovation de la cloison — menuiserie des fenêtres, • Modernisation de la cloison — menuiserie de porte, • Modernisation du système de chauffage — remplacement de la source de chaleur pour une chaudière à condensation de gaz et installation d’une pompe à chaleur avec échangeur d’air avec réservoir tampon comme source principale de chauffage. • Installation d’un ensemble de cellules photovoltaïques de 15,6 kW en tant que micro source de production d’électricité pour l’exploitation de l’installation. Les tâches à accomplir visent à soutenir l’efficacité énergétique, la gestion intelligente de l’énergie et l’utilisation des sources d’énergie renouvelables. Produits du projet: capacité supplémentaire de production d’électricité à partir de sources renouvelables: 0,0156 MWe, nombre d’unités de production d’électricité SER construites: 1 PC, capacité supplémentaire de production de chaleur renouvelable: 0,031 MWt, nombre d’unités de production de chaleur SER construites: 1 poste, nombre de bâtiments modifiés par l’énergie: 1 pcs., zone utilisable des bâtiments ayant subi une thermomodernisation: 582,2 m². (French)
    2 December 2021
    0 references

    Identifiers

    RPPK.03.02.00-18-0043/16
    0 references