Energy modernisation of the workshop building of vocational and social rehabilitation of persons with disabilities at the Department of Vocational Activity in Nowa Sarzyna (Q118668)
Jump to navigation
Jump to search
Project Q118668 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the workshop building of vocational and social rehabilitation of persons with disabilities at the Department of Vocational Activity in Nowa Sarzyna |
Project Q118668 in Poland |
Statements
796,126.6 zloty
0 references
936,619.54 zloty
0 references
85.0 percent
0 references
21 December 2015
0 references
21 December 2018
0 references
STOWARZYSZENIE "DOBRY DOM"
0 references
Głównym celem projektu jest zmniejszenie zużycia energii potrzebnej do funkcjonowania budynku warsztatów rehabilitacji zawodowej i społecznej. W przypadku przedmiotowego budynku projekt dotyczy ograniczenia zużycia energii cieplnej do ogrzewania budynku oraz zużycia energii elektrycznej na potrzeby oświetlenia budynku. Dodatkowym celem projektu jest zwiększenie udziału odnawialnych źródeł energii w produkcji energii elektrycznej poprzez wykonanie instalacji fotowoltaicznej na potrzeby własne budynku. W związku z realizacją zakresu rzeczowego projektu zostaną zmniejszone koszty za dostarczaną do budynku energię cieplną oraz elektryczną. Przedmiotowy budynek zlokalizowany jest w Nowej Sarzynie przy ulicy Łukasiewicza 3A, posiada powierzchnię ogrzewaną 792,44 m2. W obecnym stanie budynek wymaga modernizacji, gdyż przegrody budowlane oraz stolarka okienna i drzwiowa nie spełniają obowiązujących warunków technicznych co do izolacyjności cieplnej. Ponadto instalacja grzewcza jest skorodowana bez regulacji miejscowej, a wentylacja grawitacyjna nie spełnia swojej funkcji. Instalacja elektryczna i oświetlenie budynku wymagają wymiany. W ramach rzeczowej realizacji projektu planuje się wykonać szereg modernizacji polegających na: ociepleniu ścian zewnętrznych i fundamentowych budynku, ociepleniu stropodachów budynku, wymianę całej stolarki okiennej i drzwiowej (z bramą), wymianę instalacji centralnego ogrzewania oraz montaż wentylacji mechanicznej z odzyskiem ciepła. Dodatkowo planuje się wykonanie nowej instalacji elektrycznej oświetleniowej, a na stropodachach budynku montaż instalacji fotowoltaicznej PV o mocy zainstalowanej ok 40 kW. Wykonanie omówionych prac budowlanych i instalacyjnych przyniesie efekt w postaci zmodernizowanego energetycznie budynku, zmniejszenie zużycia energii finalnej o 166,81 MWh/rok, a tym samym ograniczenie emisji CO2 do atmosfery w ilości 74,03 ton /rok. Koszty za energię spadną o 45 127,44 zł rocznie. (Polish)
0 references
The main objective of the project is to reduce the energy consumption needed for the functioning of the workshop building for professional and social rehabilitation. In the case of the building in question, the project concerns the reduction of heat consumption for building heating and electricity consumption for building lighting. The additional objective of the project is to increase the share of renewable energy sources in the production of electricity by making a photovoltaic installation for the own needs of the building. In connection with the implementation of the material scope of the project, the costs for the heat and electricity supplied to the building will be reduced. This building is located in Nowa Sarzyna at ul. Łukasiewicza 3A, it has a heated area of 792.44 m². In the current state of the building, the building needs to be modernised, as the building partitions and the window and door carpentry do not meet the applicable technical requirements for thermal insulation. In addition, the heating system is corroded without local adjustment, and gravity ventilation does not perform its function. The electrical installation and lighting of the building require replacement. As part of the actual implementation of the project, a number of modernisations are planned, consisting of: insulation of the exterior and foundation walls of the building, warming of the building’s stropodache, replacement of the entire window and door carpentry (with gate), replacement of central heating system and installation of mechanical ventilation with heat recovery. In addition, a new electrical lighting system is planned, and on the stropods of the building the installation of a PV photovoltaic installation with an installed capacity of approx. 40 kW is planned. The performance of these construction and installation works will result in an energy-modernised building, a reduction in final energy consumption by 166.81 MWh/year, thus reducing CO2 emissions to the atmosphere in the amount of 74.03 tonnes/year. The costs for energy will fall by PLN 45 127.44 per year. (English)
20 October 2020
0 references
L’objectif principal du projet est de réduire la consommation d’énergie nécessaire au fonctionnement de la construction des ateliers de réadaptation professionnelle et sociale. Dans le cas de ce bâtiment, le projet concerne une réduction de l’utilisation de l’énergie thermique pour le chauffage du bâtiment et de la consommation d’électricité pour l’éclairage du bâtiment. Un autre objectif du projet est d’augmenter la part des sources d’énergie renouvelables dans la production d’électricité au moyen d’une installation photovoltaïque répondant aux besoins propres du bâtiment. En raison de la portée matérielle du projet, les coûts de chauffage et d’électricité fournis au bâtiment seront réduits. Le bâtiment est situé à Nowa Sarzyna au 3A rue Łukasiewicza, a une superficie chauffée de 792,44 m². Dans son état actuel, le bâtiment doit être modernisé, car les cloisons de bâtiment et les menuiseries de fenêtres et de portes ne satisfont pas aux conditions techniques applicables en matière d’isolation thermique. En outre, le système de chauffage est corrodé sans régulation locale et la ventilation par gravité ne remplit pas sa fonction. L’installation électrique et l’éclairage du bâtiment nécessitent un remplacement. Dans le cadre de la mise en œuvre matérielle du projet, un certain nombre de modernisations sont prévues, à savoir: isolation des murs extérieurs et de fondation du bâtiment, réchauffement des sols du bâtiment, remplacement de l’ensemble de la menuiserie des fenêtres et des portes (avec portail), remplacement du système de chauffage central et installation de ventilation mécanique avec récupération de chaleur. En outre, une nouvelle installation d’éclairage électrique est prévue et l’installation d’une installation photovoltaïque photovoltaïque d’une puissance installée d’environ 40 kW est prévue au sous-sol du bâtiment. Les travaux de construction et d’installation discutés auront un effet sous la forme d’un bâtiment à modification énergétique, une réduction de la consommation finale d’énergie de 166,81 MWh/an, réduisant ainsi les émissions de CO2 dans l’atmosphère de 74,03 tonnes/an. Les coûts énergétiques diminueront de 45 127,44 PLN par an. (French)
2 December 2021
0 references