Mobile MOF Steel Wola (Q119086)

From EU Knowledge Graph
Revision as of 07:01, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif stratégique du projet «Mobilny MOF Stalowa Wola» est de réduire l’impact du système de transport sur l’environnement et le climat et d’améliorer l’accessibilité et la qualité des transports publics dans la zone du MOF Stalowa Wola. Portée matérielle du projet: Municipalité de Stalowa Wola: Achat de 10 autobus électriques (zéro émission) et 9 autobus à faibles émissions (EURO VI), achat d’informations dynamiques pour les passagers, y c...)
Jump to navigation Jump to search
Project Q119086 in Poland
Language Label Description Also known as
English
Mobile MOF Steel Wola
Project Q119086 in Poland

    Statements

    0 references
    32,253,545.48 zloty
    0 references
    7,740,850.92 Euro
    13 January 2020
    0 references
    37,945,347.75 zloty
    0 references
    9,106,883.46 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 May 2017
    0 references
    30 August 2019
    0 references
    GMINA STALOWA WOLA
    0 references
    0 references
    Celem strategicznym projektu „Mobilny MOF Stalowej Woli” jest zmniejszenie oddziaływania systemu transportowego na środowisko i klimat oraz poprawa dostępności i jakości transportu publ. na terenie MOF Stalowej Woli. Zakres rzeczowy projektu: Gmina Stalowa Wola: Zakup 10 szt. autobusów elektrycznych (bezemisyjnych) i 9 szt. autobusów niskoemisyjnych (EURO VI), zakup dynamicznej Informacji pasażerskiej, obejmujący m.in. bilet elektroniczny, biletomaty stacjonarne z monitoringiem, tablice inform. zlokalizowane przy przystankach autobusowych, przebudowa infrastr. drogowej w celu poprawy jakości funkcjon. systemu transportu publicznego - budowa ronda turbinowego na skrzyżowaniu ul. Solidarności z ul. Energetyków, utworzenie nowych oraz wydłuż. 2 linii komunikacyjnych, zwiększenie częstotl. kursów autobusów. Gmina Pysznica: Budowa zatoki autobusowej wraz z wiatą i peronem w msc. Kłyżów, budowa dwóch zatok wraz z przejściem dla pieszych w msc. Pysznica, budowa pętli autobusowej wraz z chodnikami i peronem w msc. Brandwica Gmina Zaleszany: Budowa parkingów „Park & Ride” oraz „Bike & Ride”, wykonanie 12 sztuk wiat przystankowych ze znakami D-15 i koszami na śmieci, stojak. dla rowerów. Gmina i Miasto Nisko: Budowa Centrum przesiadk. z zadaszonym Miejscem Obsługi Rowerzystów, z elem. małej architektury , budowa ścieżek rower. komunik. osiedle Podwolina i Osiedle Warchoły z Centrum przesiadkowym zlokalizowanym u zbiegu ulic Wolności i 11-Listopada, Produkty projektu: 19 zakupionych autobusów (bezemisyjnych lub z normą EuroVI) 907 miejsc dla pasażerów w zakupionym taborze 4 wybudowane obiekty „parkuj i jedź” 36 miejsc postojowych w wybudowanych obiektach „parkuj i jedź” 4 miejsca postojowe dla osób niepełnosprawnych w wybudowanych obiektach „parkuj i jedź” 5 wybudowanych obiektów „Bike&Ride” 68 stanowisk postojowych w wybudowanych obiektach „Bike&Ride” 1 wybudowany zintegrowany węzeł przesiadkowy 1zainstalowany inteligentny system transportowy 5,7 km wybudowanych dr (Polish)
    0 references
    The strategic goal of the project “Mobile MOF Steel Wola” is to reduce the impact of the transport system on the environment and climate, and to improve the accessibility and quality of transport publ. in the area of the MOF Steel Wola. In-kind scope of the project: Municipality of Stalowa Wola: Purchase of 10 units of electric (non-emission) buses and 9 low-emission buses (EURO VI), purchase of dynamic passenger information, including e-tickets, stationary ticket machines with monitoring, information boards located at bus stops, reconstruction of road infrastr. in order to improve the functionality of the public transport system – construction of a turbine roundabout at the intersection of ul. Solidarity with ul. Energetics, creation of new and extended. 2 lines of communication, increasing the frequency of buses. Municipality of Pysznica: Construction of a bus bay with a light and platform in the city. Klyżów, construction of two bays along with pedestrian crossing in vengeance. Pysznica, construction of a bus loop along with sidewalks and platform in vengeance. Brandwica Town of Leasane: Construction of car parks "Park & Ride“and”Bike & Ride", making 12 stop worlds with D-15 marks and garbage bins, stand for bicycles. Municipality and City of Nisko: Construction of the centre of change. with covered Rover Service Centre, with small architecture, construction of bicycle paths. komunik. housing estate Podwolina and Osiedle Warchoły with a transfer centre located at the junction of Wolności and 11-November streets, Project products: 19 buses purchased (non-emission or EuroVI standard) 907 seats for passengers in the purchased rolling stock 4 built "park and drive" facilities 36 parking spaces in built "park and drive" facilities 4 parking spaces for disabled persons in built buildings "park and drive" 5 built buildings "Bike&Ride“68 parking stations in built buildings”Bike&Ride" 1 built-in integrated (English)
    20 October 2020
    0 references
    L’objectif stratégique du projet «Mobilny MOF Stalowa Wola» est de réduire l’impact du système de transport sur l’environnement et le climat et d’améliorer l’accessibilité et la qualité des transports publics dans la zone du MOF Stalowa Wola. Portée matérielle du projet: Municipalité de Stalowa Wola: Achat de 10 autobus électriques (zéro émission) et 9 autobus à faibles émissions (EURO VI), achat d’informations dynamiques pour les passagers, y compris billets électroniques, guichets fixes avec surveillance, panneaux d’information situés aux arrêts d’autobus, reconstruction des infrastructures routières pour améliorer la qualité du système de transport public — construction d’un rond-point à turbine à l’intersection de l’ul. Solidarité avec St. Production d’électricité, création de nouvelles et allongement. 2 lignes de transport, augmentation des départs fréquents de bus. Commune de pysznica: Construction d’une baie de bus avec abri et plate-forme en masc. Kłyżów, construction de deux baies avec un passage pour piétons en masc. Pysznica, construction d’une boucle de bus avec trottoirs et plate-forme en msc. Brandwica Municipalité de Zaleszany: Construction de parkings «Park & Ride» et «Bike & Ride», exécution de 12 pièces du monde s’arrêtant avec des panneaux D-15 et des poubelles, support pour vélos. Municipalité et ville de Nisko: Construction du Centre pour les changements. avec installation de service cyclable couverte, avec une petite architecture el., construction de pistes cyclables. communication. Domaines Podwolina et Osiedle Warchoły avec un centre de changement situé à l’intersection des rues de la Liberté et 11-novembre, Produits du projet: 19 autobus achetés (zéro émission ou norme EuroVI) 907 sièges passagers dans le matériel roulant acheté 4 objets construits «parc et conduite» 36 places de stationnement dans des installations «parc et conduite» construites 4 places de stationnement pour personnes handicapées dans des installations construites «parc et conduite» 5 construits «Bike&Ride» 68 stations de stationnement construites «Bike&Ride» 1 nœud d’échange intégré construit 1 système de transport intelligent installé 5,7 km construits dr (French)
    2 December 2021
    0 references

    Identifiers

    RPPK.05.04.00-18-0004/16
    0 references