COMPREHENSIVE THERMOMODERNISATION OF THE BUILDING OF THE SCHOOL COMPLEX WITH ADDITIONAL BELARUSIAN LANGUAGE EDUCATION IN HAJNÓWKA (Q116991)

From EU Knowledge Graph
Revision as of 06:33, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): En raison des très faibles paramètres d’isolation thermique et donc de l’efficacité énergétique extrêmement faible du bâtiment, le projet prévoit les travaux de construction suivants: * réchauffement des murs de fondation dans le sol avec polystyrène extrudé de 12 cm, * réchauffement des murs avec fondation en polystyrène à la hauteur de 12 cm, * isolation des murs extérieurs au niveau du plancher avec 15 cm d’épaisseur styrofoam avec plâtre sil...)
Jump to navigation Jump to search
Project Q116991 in Poland
Language Label Description Also known as
English
COMPREHENSIVE THERMOMODERNISATION OF THE BUILDING OF THE SCHOOL COMPLEX WITH ADDITIONAL BELARUSIAN LANGUAGE EDUCATION IN HAJNÓWKA
Project Q116991 in Poland

    Statements

    0 references
    1,305,448.2 zloty
    0 references
    313,307.57 Euro
    13 January 2020
    0 references
    1,864,926.0 zloty
    0 references
    447,582.24 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    27 July 2017
    0 references
    13 September 2018
    0 references
    POWIAT HAJNOWSKI
    0 references

    52°43'54.1"N, 23°34'16.3"E
    0 references
    Projekt ze względu na bardzo złe parametry izolacyjności termicznej, a co za tym idzie wyjątkowo niską efektywność energetyczną budynku przewiduje wykonanie następujących prac budowlanych: * ocieplenie ścian fundamentowych w gruncie polistyrenem ekstrudowanym o gr. 12 cm, * wykonanie docieplenia ścian cokołów styropianem fundamentowym o gr. 12 cm, * ocieplenie ścian zewnętrznych na poziomie kondygnacji styropianem fasadowym o gr. 15 cm z wykończeniem tynkiem krzemianowo-silikonowym lub silikonowym w uziarnieniu „baranek”, * ocieplenie stropów wentylowanych nad parterowymi przybudówkami, łącznikiem dwukondygnacyjnym z salą gimnastyczną oraz aulą granulatem wełny mineralnej gr. 30 cm metodą „wdmuchiwania ciepła”, * izolację stropu poddasza nieużytkowego styropianem, * izolację stropu nad klatką schodową styropianem o gr. 10 cm, * docieplenie stropodachów niewentylowanych wełną mineralną o gr. 10 cm wraz z wykonaniem pokrycia dachowego papą termozgrzewalną, * wymianę części oświetlenia wbudowanego na energooszczędne typu LED, * zastąpienie dwóch układów wentylacji mechanicznej kuchni i jadalni 2 centralami wentylacyjnymi nawiewno-wywiewnymi z wymiennikiem obrotowym oraz odzyskiem ciepła z powietrza wywiewanego, * wymianę węzła cieplnego, * instalację paneli fotowoltaicznych o łącznej mocy 15 kWp. Zgodnie z szacunkami zawartymi w audycie energetycznym każdego roku na ogrzewanie budynku i przygotowanie ciepłej wody oraz oświetlenie zużywanych jest 6245 GJ energii końcowej. Przeprowadzenie wymienionych wyżej robót pozwoli na jej ograniczenie o około 52%. Wiązać się to będzie ze zmniejszeniem emisji CO2 rzędu 294 ton. (Polish)
    0 references
    The project due to very poor thermal insulation parameters, and thus the extremely low energy efficiency of the building, envisages the following construction works: * with the warming of the foundation walls in the ground with extruded polystyrene, * in warming of the walls of the cocoa of Styrofoam in 12 cm, * warming of the outer walls at the level of styrofoam with a 15 cm frosting of the frosted ventilated vents, and a two-half-silicon warming of the ventilated ventral ventilators. According to estimates contained in the energy audit each year, 6245 GJ of final energy is used for heating the building and preparing hot water and lighting. Carrying out the above-mentioned works will allow it to be reduced by about 52 %. This will entail a reduction in CO2 emissions of 294 tonnes. (English)
    20 October 2020
    0 references
    En raison des très faibles paramètres d’isolation thermique et donc de l’efficacité énergétique extrêmement faible du bâtiment, le projet prévoit les travaux de construction suivants: * réchauffement des murs de fondation dans le sol avec polystyrène extrudé de 12 cm, * réchauffement des murs avec fondation en polystyrène à la hauteur de 12 cm, * isolation des murs extérieurs au niveau du plancher avec 15 cm d’épaisseur styrofoam avec plâtre silicate-silicone ou plâtre de silicone dans le grain «baranas», * réchauffement des plafonds ventilés sur les enceintes du rez-de-chaussée, un connecteur de deux étages avec salle de gymnastique et aulaine minérale granulaire de 30 cm par «soufflage de chaleur», * isolant le plafond avec de la mousse non utilisée, * l’isolation du plafond au-dessus de l’escalier avec styrofoam, 10 cm, * chauffage des plantes non ventilées avec de la laine minérale de 10 cm avec toiture thermoscellée, * remplacement de la partie d’éclairage intégrée par le type LED écoénergétique, * remplacement de deux systèmes de ventilation mécanique de la cuisine et de la salle à manger par 2 unités de ventilation avec des unités de ventilation et de ventilation avec échangeur rotatif et récupération de chaleur de l’air d’échappement, * remplacement du nœud thermique, * installation de panneaux photovoltaïques d’une puissance totale de 15 kWp. Selon les estimations incluses dans l’audit énergétique, 6245 GJ d’énergie finale sont consommés chaque année pour le chauffage des bâtiments et la préparation et l’éclairage de l’eau chaude. La réalisation des travaux susmentionnés permettra une réduction d’environ 52 %. Cela entraînera une réduction des émissions de CO2 de 294 tonnes. (French)
    2 December 2021
    0 references

    Identifiers

    RPPD.05.03.01-20-0094/16
    0 references