Development of tourist and recreation area in the town of Tołowo. (Q117490)

From EU Knowledge Graph
Revision as of 20:37, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est d’accroître la disponibilité d’infrastructures touristiques et de loisirs afin d’améliorer la qualité de vie dans la région de Toczowo. Dans le cadre de la tâche, l’activité no 58 d’une superficie de 2 383,5 m², située dans le village de Toczyowo, sera revitalisée. Cette parcelle sera gérée comme suit: Monde 1.Tourist avec des sièges et une table; 2. les gardes d’eau et les conteneurs de système pour les déchets; 3.table...)
Jump to navigation Jump to search
Project Q117490 in Poland
Language Label Description Also known as
English
Development of tourist and recreation area in the town of Tołowo.
Project Q117490 in Poland

    Statements

    0 references
    182,025.38 zloty
    0 references
    43,686.09 Euro
    13 January 2020
    0 references
    221,982.2 zloty
    0 references
    53,275.73 Euro
    13 January 2020
    0 references
    82.0 percent
    0 references
    12 September 2016
    0 references
    2 November 2017
    0 references
    GMINA GRAJEWO
    0 references
    0 references
    Celem projektu jest zwiększenie dostępności infrastruktury turystyczno - wypoczynkowej służącej poprawie jakości życia na obszarze m. Toczyłowo. W ramach zadania zostanie zrewitalizowana działaka nr 58 o powierzchni 2383,5 m2 położona w miejscowości Toczyłowo. Przedmiotowa działka zostanie zagospodarowana w następujący sposób: 1.wiata turystyczna z siedziskami i stołem; 2.osłony toalet oraz kontenerów systemowych na odpady; 3.stoły z siedziskami; 4.palenisko z przeznaczeniem na ognisko, 5.zestawy do zabaw dla dzieci: huśtawka podwójna, huśtawka wagowa, sprężynowiec, zestaw zabawowy, karuzela, 6.zestawy do ćwiczeń: orbitek, wioślarz, twister/wahadło, prasa nożna+wyciskanie siedząc; biegacz, 7.ławka parkowa, kosze na śmieci,8.ogrodzenie panelowe wysokości 1,50m, 9.boisko do piłki plażowej, 10.liczne nasadzenia i prace terenowe (Polish)
    0 references
    The aim of the project is to increase the availability of tourist and leisure infrastructure aimed at improving the quality of life in the area of the city. The project will revitalise the plot No. 58 with an area of 2383.5 m² located in the town of To³yowo. The plot will be managed as follows: 1.Tourist world with seats and table; 2. covers of toilets and system containers for waste; 3. tables with seats; 4.burning for fireplace, 5. children’s playsets: double swing, weight swing, springboard, play set, carousel, 6. workout sets: elliptical cross trainer, rowing machine, twister/washboard, foot press+squeezing sitting; runner, 7.park bench, garbage bins,8.Panel fence height 1.50 m, 9. beach ball field, 10.multiple plantings and field work (English)
    20 October 2020
    0 references
    L’objectif du projet est d’accroître la disponibilité d’infrastructures touristiques et de loisirs afin d’améliorer la qualité de vie dans la région de Toczowo. Dans le cadre de la tâche, l’activité no 58 d’une superficie de 2 383,5 m², située dans le village de Toczyowo, sera revitalisée. Cette parcelle sera gérée comme suit: Monde 1.Tourist avec des sièges et une table; 2. les gardes d’eau et les conteneurs de système pour les déchets; 3.tables avec sièges; 4.fireplace, jeux de théâtre de 5.enfants: double balançoire, balançoire de poids, ressort, jeu de jeu, carrousel, 6. ensembles d’exercices: orbiteur, rameur, torsion/en forme, presse de soccer+squeeping assis; coureur, 7.park ball, poubelles,8.panel clôture 1,50 m de haut, 9. terrain de boule de plage, 10.nombre de plantations et de travaux sur le terrain (French)
    1 December 2021
    0 references

    Identifiers

    RPPD.08.06.00-20-0046/17
    0 references