Renewable energy sources in Independent Public Health Care Department in Sokółka ETAP I (Q116811)

From EU Knowledge Graph
Revision as of 20:36, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le sujet de l’étude est une centrale photovoltaïque de phase 1 destinée à la production d’électricité fonctionnant en parallèle avec le réseau de distribution de l’industrie de l’électricité commerciale d’une capacité de 37,8 kWp. L’électricité produite sera utilisée pour son propre usage et la production excédentaire sera injectée dans le réseau de distribution. Date prévue de mise en œuvre du projet: Septembre 2017 L’objectif principal du proj...)
Jump to navigation Jump to search
Project Q116811 in Poland
Language Label Description Also known as
English
Renewable energy sources in Independent Public Health Care Department in Sokółka ETAP I
Project Q116811 in Poland

    Statements

    0 references
    148,469.66 zloty
    0 references
    35,632.72 Euro
    13 January 2020
    0 references
    209,112.21 zloty
    0 references
    50,186.93 Euro
    13 January 2020
    0 references
    71.0 percent
    0 references
    26 November 2018
    0 references
    31 December 2018
    0 references
    SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ W SOKÓŁCE
    0 references
    0 references

    53°24'17.6"N, 23°29'58.6"E
    0 references
    Przedmiotem opracowania jest elektrownia fotowoltaiczna Etap 1 przeznaczona do produkcji energii elektrycznej pracującej równolegle z siecią dystrybucyjnej energetyki zawodowej o mocy 37,8 kWp. Produkowana energia elektryczna będzie wykorzystana na potrzeby własne, nadwyżka produkcji oddawana będzie do sieci dystrybucyjnej. Planowany termin realizacji projektu : wrzesień 2017 r.Celem głównym realizowanego projektu jest wytwarzanie energii elektrycznej z OZE na potrzeby własne szpitala, co pozwoli na ograniczenie emisji CO2.Cel ten realizowany będzie poprzez instalację urządzeń pozwalających na produkcję energii z OZE Celem operacyjnym jest: • budowa instalacji OZE o mocy 0,0378 MWp W wyniku której realizowane będą cele szczegółowe • Produkcja energii elektrycznej z OZE • Zmniejszenie emisji zanieczyszczeń do atmosfery Wytwarzanie energii elektrycznej z energii słonecznej pozwoli na zwiększenie wolumenu energii produkowanej z odnawialnych źródeł, co przyczyni się do wypełnienia zobowiązań Polski w ramach pakietu klimatycznego. Realizacja projektu wpłynie także na zmniejszenie emisji zanieczyszczeń do atmosfery, wyeliminuje część energii produkowanej z węgla W wyniku realizacji projektu wnioskodawca zredukuje emisję CO2 wynikającą z korzystania z energii elektrycznej o 10 % (założono stały poziom zapotrzebowania na energię elektryczną). Koszty całkowite projektu wynoszą 210 072,08 zł, koszty kwalifikowalne wynoszą 210 072,08 zł, oczekiwana kwota dotacji 149151,17 zł, co stanowi 71% dotacji. (Polish)
    0 references
    The subject of the study is a photovoltaic power plant Stage 1 designed for the production of electricity operating in parallel with the distribution network of professional energy with a capacity of 37.8 kWp. The electricity produced will be used for own use, the excess production will be transferred to the distribution network. Planned date of implementation of the project: September 2017 The main objective of the project is to generate electricity from RES for own needs of the hospital, which will allow to reduce CO2 emissions.This objective will be implemented by installing devices allowing the production of energy from RES The operational objective is to: • Construction of RES installations with a capacity of 0.0378 MWp As a result of which specific objectives will be implemented • Manufacture of electricity from RES • Reducing emissions of pollutants into the atmosphere Manufacturing electricity from solar energy will allow to increase the volume of energy produced from renewable sources, which will contribute to fulfilling Poland’s commitments under the climate package. Implementation of the project will also reduce emissions of pollutants into the atmosphere, eliminate part of the energy produced from coal As a result of the project, the applicant will reduce CO2 emissions resulting from the use of electricity by 10 % (a fixed level of electricity demand was established). The total costs of the project amount to PLN 210 072.08, the eligible costs amounting to PLN 210 072.08, the expected grant amount of PLN 149151,17, which is 71 % of the grant. (English)
    20 October 2020
    0 references
    Le sujet de l’étude est une centrale photovoltaïque de phase 1 destinée à la production d’électricité fonctionnant en parallèle avec le réseau de distribution de l’industrie de l’électricité commerciale d’une capacité de 37,8 kWp. L’électricité produite sera utilisée pour son propre usage et la production excédentaire sera injectée dans le réseau de distribution. Date prévue de mise en œuvre du projet: Septembre 2017 L’objectif principal du projet mis en œuvre est de produire de l’électricité à partir de SER pour les besoins propres de l’hôpital, ce qui permettra de réduire les émissions de CO2. Cet objectif sera atteint par l’installation de dispositifs permettant la production d’énergie à partir de SER. L’objectif opérationnel est de: • construction d’une installation SER d’une capacité de 0,0378 MWc. Réalisation d’objectifs spécifiques • Production d’électricité à partir de SER • Réduction des émissions de polluants dans l’atmosphère La production d’électricité à partir de l’énergie solaire permettra une augmentation du volume d’énergie produite à partir de sources renouvelables, ce qui contribuera au respect des obligations de la Pologne au titre du paquet climat. La mise en œuvre du projet permettra également de réduire les émissions de polluants dans l’atmosphère, d’éliminer une partie de l’énergie produite à partir du charbon et de réduire de 10 % les émissions de CO2 résultant de l’utilisation de l’électricité (un niveau constant de demande d’électricité est supposé). Les coûts totaux du projet s’élèvent à 210 072,08 PLN, les coûts éligibles s’élèvent à 210 072,08 PLN, le montant prévu de la subvention de 149151,17 PLN, soit 71 % de la subvention. (French)
    1 December 2021
    0 references

    Identifiers

    RPPD.05.01.00-20-0260/17
    0 references