Communication of the Koźle Port investment area through the construction of a road with the necessary infrastructure. (Q115097)

From EU Knowledge Graph
Revision as of 20:22, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet consiste en la construction d’un nouveau tronçon de la route municipale de 0,295 km reliant la rue. Kłodnicka (route provinciale no 423) depuis l’ul. Elewatorowa à Kędzierzyn-Koźle, à la frontière de la zone B de protection de la conservation. La route prévue est conçue pour communiquer les zones d’investissement à proximité du port de Kožle avec la route provinciale no 423. L’intersection avec la route de voïvodie a donc été conçue po...)
Jump to navigation Jump to search
Project Q115097 in Poland
Language Label Description Also known as
English
Communication of the Koźle Port investment area through the construction of a road with the necessary infrastructure.
Project Q115097 in Poland

    Statements

    0 references
    1,362,724.43 zloty
    0 references
    327,053.86 Euro
    13 January 2020
    0 references
    2,478,131.38 zloty
    0 references
    594,751.53 Euro
    13 January 2020
    0 references
    54.99 percent
    0 references
    25 September 2017
    0 references
    30 November 2018
    0 references
    GMINA KĘDZIERZYN-KOŹLE
    0 references
    0 references
    Projekt polega na budowie nowego odcinka drogi gminnej o długości 0,295 km, łączącej ul. Kłodnicką (drogę wojewódzką nr 423) z ul. Elewatorową w Kędzierzynie-Koźlu, w granicy strefy B ochrony konserwatorskiej. Projektowana droga ma za zadanie komunikować tereny inwestycyjne w otoczeniu Portu Koźle z drogą wojewódzką nr 423. Dlatego zaprojektowano skrzyżowanie z drogą wojewódzką dowiązując się i koordynując kształt skrzyżowania do istniejącej jezdni (długość wybudowanej drogi wojewódzkiej - 0,026 km, długość przebudowanej drogi wojewódzkiej 0,127 km). Wzdłuż nowej drogi przewidziano ciąg pieszo-rowerowy, który w przyszłości włączony zostanie do sieci ścieżek rowerowych miasta zapewniając poprawę bezpieczeństwa uczestników ruchu drogowego dojeżdżających m.in. do miejsca zamieszkania oraz pracy (1 projekt). Przedmiotowy projekt jest bezpośrednio powiązany z przedsięwzięciem pn. „Wzmocnienie potencjału inwestycyjnego Subregionu Kędzierzyńsko-Strzeleckiego poprzez uzbrojenie terenów inwestycyjnych przylegających do Portu w Koźlu” realizowanym w ramach Poddziałania 2.2.1. RPO WO 2014-2020, który polega na budowie drogi wewnętrznej połączonej z ulicą Elewatorową i uzbrojeniu terenów inwestycyjnych poprzez doprowadzenie do nich sieci sanitarnej, deszczowej, wodociągowej, sieć telekom. i kanał teletechniczny. Budowa drogi gminnej łączącej ulicę Elewatorową z Kłodnicką i prowadzącą bezpośrednio do lub przez nowo powstałe tereny inwestycyjne jest zatem jednym z elementów kompleksowej inwestycji polegającej na wzmocnieniu potencjału gospodarczego regionu. Niniejszy projekt realizowany będzie w partnerstwie z Województwem Opolskim. Partner projektu odpowiedzialny będzie za właściwy nadzór prac prowadzonych w obrębie skrzyżowania oraz zachowanie trwałości wybudowanej i przebudowanej infrastruktury. (Polish)
    0 references
    The project consists of the construction of a new section of the municipal road with a length of 0.295 km, connecting the street. Kłodnicka (Provincial Road No 423) from ul. Ellewatorowa in Kędzierzyn-Koźl, border B of conservation protection. The projected road is designed to communicate investment areas in the vicinity of Koźle Port with Voivodeship Road No. 423. That is why the intersection with the voivodeship road was designed by referring and coordinating the shape of the intersection to the existing road (length of the built provincial road – 0.026 km, length of the reconstructed provincial road 0.127 km). Along the new road there is a pedestrian-bike line, which in the future will be included in the network of bicycle paths of the city, ensuring the safety of road users commuting, inter alia, to the place of residence and work (1 project). This project is directly linked to the project concerned. “Strengthening the investment potential of the Kedzierzyńsko-Strzelec Subregion by arming investment areas adjacent to the Koźl Port” carried out under Sub-measure 2.2.1. RPO WO 2014-2020, which consists of the construction of an internal road connected to Ellewatorowa Street and the armament of investment areas through the provision of sanitary, rain, water supply, telecom network and telecommunication channel. The construction of a communal road connecting Elewatorowa Street with Kłodnicka and leading directly to or through newly created investment areas is therefore one of the elements of a comprehensive investment consisting of strengthening the region’s economic potential. This project will be implemented in partnership with the Opolskie Voivodeship. The project partner will be responsible for the proper supervision of the work carried out within the intersection and the sustainability of the built and rebuilt infrastructure. (English)
    20 October 2020
    0 references
    Le projet consiste en la construction d’un nouveau tronçon de la route municipale de 0,295 km reliant la rue. Kłodnicka (route provinciale no 423) depuis l’ul. Elewatorowa à Kędzierzyn-Koźle, à la frontière de la zone B de protection de la conservation. La route prévue est conçue pour communiquer les zones d’investissement à proximité du port de Kožle avec la route provinciale no 423. L’intersection avec la route de voïvodie a donc été conçue pour relier et coordonner la forme de l’intersection avec la route existante (longueur de la route voïvodie construite — 0,026 km, longueur de la route voïvodie reconstruite 0,127 km). Le long de la nouvelle route, il y a une piste piétonne-vélo qui sera intégrée dans le réseau de pistes cyclables de la ville à l’avenir, assurant une meilleure sécurité pour les usagers de la route qui se déplacent, entre autres, vers leur lieu de résidence et de travail (1 projet). Le projet en question est directement lié au projet intitulé «Renforcer le potentiel d’investissement de la sous-région Kędzierzyńsko-Strzelec en armant les zones d’investissement adjacentes au port de Kozl» mise en œuvre au titre de la sous-mesure 2.2.1. ROP OP OP 2014-2020, qui consiste en la construction d’une route intérieure reliée à la rue Elewatorowa et l’armement de sites d’investissement par la mise à disposition d’un réseau sanitaire, d’eau de pluie, d’approvisionnement en eau, d’un réseau de télécommunications et d’un canal télétechnique. La construction d’une route municipale reliant la rue Elewatorowa à Kłodnicka et menant directement vers ou à travers des zones d’investissement nouvellement créées est donc l’un des éléments d’un investissement global consistant à renforcer le potentiel économique de la région. Ce projet sera mis en œuvre en partenariat avec la voïvodie d’Opolskie. Le partenaire du projet sera responsable de la supervision adéquate des travaux réalisés à l’intersection et du maintien de la durabilité des infrastructures construites et reconstruites. (French)
    1 December 2021
    0 references

    Identifiers

    RPOP.06.01.00-16-0025/17
    0 references