With science for the future – development of competences of key primary school pupils in Świerczów Municipality (Q115457)

From EU Knowledge Graph
Revision as of 20:08, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q115457 in Poland
Language Label Description Also known as
English
With science for the future – development of competences of key primary school pupils in Świerczów Municipality
Project Q115457 in Poland

    Statements

    0 references
    0 references
    444,929.1 zloty
    0 references
    106,782.98 Euro
    13 January 2020
    0 references
    523,446.0 zloty
    0 references
    125,627.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 September 2018
    0 references
    30 June 2020
    0 references
    GMINA ŚWIERCZÓW
    0 references
    0 references

    50°57'35.3"N, 17°45'31.7"E
    0 references
    Głównym problemem, na który odpowiedź stanowi projekt są niskie komp. kluczowe uczniów szkół w gminie Świerczów.Problemem są również niewystarczające komp. zaw. nauczycieli do pracy z uczniami. Celem głównym proj. jest podniesienie u uczniów komp.kluczowych, właściwych postaw i umiejętn. niezbędnych na rynku pracy min.100% uczniów: tj.150 ucz(61dz,89ch),w tym zniwelow. deficyt. u 36ucz(14dz,22ch) ze specj.potrz.eduk., w tym 2ucz(2ch) z niepełnospraw. poprzez realiz. zaj.dod. i specjalist. oraz podniesienie komp. zawodowych 100% n-li. tj. 21 n-li(18K,3M) w gminie Świerczów w terminie do 30.06.2020r. Grupa docelowa to 150 ucz.(61dz,89ch) w tym 40ucz.(15dz,25ch) ze specj.potrzeb.eduk.w tym.2ucz(2ch) z niepełnospr.,oraz 21n-li(18K,3M) ze szkół: SP Bąkowice, SP Dąbrowa. Realizowane będą zajęcia dodatkowe i dydak.-wyrów. rozwijające komp. kluczowe uczniów, zajęcia specjalistyczne dla uczniów z SPE oraz szkolenia dla n-li.  Szkoły zostaną wyposażone w sprzęt niezbędny do prowadzenia nowoczesnych, innowacyjnych zajęć oraz doposażone zostaną pracownie przedmiotowe  Wyposażenie szkół w sprzęt TIK i pracownie przedmiotowe jest komplementarne z zajęciami dodatk. dla uczniów oraz doskonaleniem n-li. Efektem realizacji projektu jest podniesienie komp. klucz. oraz właściwych postaw i umiejętności na rynku pracy co przyczyni się do rozwoju kompetencji u 100% uczn.tj. 135 ucz(55dz,80ch), zniwelowanie deficytów u 36 ucz.(14dz,22ch) ze specjalnymi potrzebami eduk.poprzez realiz. zajęć dod. oraz podniesienie komp. zaw. 100% nauczycieli tj.21n-li (18K,3M) ze szkół podstawowych w Gminie Świerczów. Miejscem realizacji projektu są w/w szkoły, w których zrekrutow.zostali uczniowie. Proj. będzie realiz. w w/w szkołach w okr.03.09.2018-30.06.2020 r. (Polish)
    0 references
    The main problem to which the project answers are low comp. key school pupils in the Świerczów commune.The problem is also insufficient comp. teachers to work with students. The main aim of the project is to increase the necessary attitudes and skills necessary in the labour market for students of key comp., 100 % of pupils: i.e. 150 pupil(61dz,89ch), including reversible. deficit. in 36student(14dz,22ch) with specialists in the field of education, including 2 school(2ch) of disability through the implementation of occupational and specialists and the raising of the professional comp. 100 % n. i.e.21 n-li(18K,3M) in Świerczów commune by 30.06.2020r. The target group is 150 pupils (61dz,89ch) of which 40(15dz,25ch) with special needs, including 2 school(2s) from under-performance, and 21n-li (18K,3M) from schools:SP Bąkowice, Dąbrowa SP. Additional classes and tutoring will be carried out, developing comp. key pupils, specialised classes for students from SPE and training for n-li.Schools will be equipped with the equipment necessary to conduct modern, innovative activities and will be equipped with the relevant workshops The equipment of schools with ICT equipment and workshops is complementary to the activities of the supplements for pupils and the improvement of n-la. The result of the project is to increase the comp. key and correct attitudes and skills on the labour market, which will contribute to the development of competences in 100 % of students.135 student(55dz,80ch), correction of deficits in 36 pupils (14dz,22ch) with special educational needs through execution of additional classes and raising comp. incl.100 % of teachers ie.21n-li (18K,3M) from primary schools in Świerczów. The place of implementation of the project is the abovementioned schools, where the students were recruited.The project will be implemented in the abovementioned schools in round 03.09.2018-30.06.2020. (English)
    20 October 2020
    0 references

    Identifiers

    RPOP.09.01.01-16-0018/18
    0 references